Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

May Production Report and Drilling Update

8 Jun 2012 08:15

RNS Number : 9709E
Exillon Energy Plc
08 June 2012
 



Exillon Energy plc - May Production Reportand Drilling Update

8 June 2012 - Exillon Energy plc (EXI.LN), a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce unaudited production data for the month of May 2012.

·; Average daily production1 for the Group was 11,320 bbl/day during the period.

·; Average daily production for Exillon TP was 3,434 bbl/day, and for Exillon WS it was 7,886 bbl/day during the period.

·; Peak daily production 2 for the Group was 12,247 bbl/day during the period.

Average production at Exillon WS during May was restricted by works being carried out on our intrafield pipeline network. Current production from Exillon WS is now approximately 9,500 bbl/day.

We expect to make our June production announcement by 15 July 2012.

Drilling Update - East EWS I - 51

Well East EWS I-51, which was spudded on 7 May 2012, was drilled in 20 days on the northern part of the East EWS I field. This is the first development well drilled from pad 5 following the success of exploration well 50 drilled last year.

The well flowed water-free oil naturally to the surface with a flow rate of 892 bbl/day on an 8 mm choke and 1,218 bbl/day on a 10 mm choke. The well encountered the Jurassic P reservoir at 1,861 meters, confirming 15.0 meters of effective vertical net pay within the Jurassic. Due to the trajectory of the well bore this exposed 30.7 meters of effective net oil pay for production.

Oil water contact in this area of the field was previously assumed at 1,872 meters, and well 51 was designed to test this assumption. The new well has not encountered an oil water transition zone and confirmed presence of oil at least 4 meters below the previously assumed oil water contact. This is likely to have a positive impact on both the production and reserves in this area of the field.

The well was drilled directionally 0.6 km to the north from the existing well pad 5, and is now connected to our existing production facilities.

Drilling Update - North EWS I - 61

Well North EWS I - 61, which was spudded on 30 April 2012, was drilled in 31 days on the North EWS I field.

The well encountered the Jurassic P reservoir at 1,856m, confirming 9.5 meters of net oil pay. The well was drilled directionally with a high level of deviation (1.6km) to the north of Pad 6. We are currently analysing the results and a decision on how best to test and develop the well will be made once this analysis is complete.

 

 

 

Source: Average production data is based on monthly production reports submitted to tax authorities for MET payment purposes. Peak production is based on internal operations reports.

[1] The Company records production in metric tonnes. Barrelization ratios are used for illustrative purposes only and are calculated based on the Company's estimate of the typical API of oil produced from specific fields. The barrelization ratios used are 7.67 bbl / tonne for Exillon WS and 7.44 bbl / tonne for Exillon TP. Total production was 31,875 tonnes for Exillon WS, 14,310 tonnes for Exillon TP and 46,185 tonnes for the Group during the 31 day period.

2 "Peak daily production" represents the Company's estimate of aggregate production on the day on which aggregate production reached its maximum during the period. It does not represent the combined peak production of each separate field on different days, which may be higher.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFPMRTMBBMMTT
Date   Source Headline
7th Nov 20147:00 amRNSInterim Management Statement and Drilling Update
10th Oct 20147:00 amRNSSeptember Production Report
17th Sep 20147:00 amRNSAugust Production Report
29th Aug 20142:08 pmRNSInterim results for the first six months of 2014
20th Aug 20147:00 amRNSJuly Production Report
25th Jul 20147:00 amRNSJune Production Report
26th Jun 20145:55 pmRNSAGM Results
20th Jun 20147:43 amRNSUpdate on Board Committees
20th Jun 20147:00 amRNSMay Production Report
28th May 20142:26 pmRNSUpdate on Board of Directors and CEO Position
28th May 201411:20 amRNSAppointment of three new independent directors
28th May 201411:19 amRNS2014 Annual General Meeting
16th May 20147:00 amRNSInterim Management Statement
30th Apr 20143:35 pmRNS2013 Annual Report and Accounts
30th Apr 20147:00 amRNSQuarterly Production Statement
24th Apr 20147:00 amRNSExillon Provides Update on Board of Directors
16th Apr 20149:23 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Mar 20143:12 pmRNSConfirmation of Appointment of Executive Director
18th Mar 20147:00 amRNSPreliminary Unaudited Results for 2013
31st Jan 20144:35 pmRNSPrice Monitoring Extension
21st Jan 20147:00 amRNSAppointment of directors, intention to appoint CFO
17th Jan 20144:54 pmRNSDirector/PDMR Shareholding
10th Jan 20147:00 amRNSQuarterly Production Statement
18th Dec 201312:03 pmRNSForm 8.5 (EPT/RI)
18th Dec 20137:00 amRNSExillon Energy plc ("Exillon" or the "Company")
17th Dec 20134:52 pmRNSStatement re rule 2.8 of The City Takeover Code
17th Dec 201312:54 pmRNSForm 8.5 (EPT/RI)
17th Dec 20137:55 amRNSForm 8.3 - Exillon Energy Plc
17th Dec 20137:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Dec 20137:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th Dec 201311:38 amRNSForm 8.3 - Exillon Energy Plc
16th Dec 201311:34 amRNSForm 8.5 (EPT/RI)
16th Dec 20137:00 amRNSForm 8.3 - Exillon Energy Plc
13th Dec 20134:24 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Dec 201312:02 pmRNSForm 8.5 (EPT/RI) - Amendment
13th Dec 201311:43 amRNSForm 8.3 - [Exillon Energy plc]
13th Dec 201311:20 amRNSForm 8.5 (EPT/RI)
13th Dec 20137:00 amRNSForm 8.3 - Exillon Energy Plc
12th Dec 20134:56 pmRNSForm 8.5 (EPT/RI) - Amendment
12th Dec 20133:04 pmRNSForm 8.3 - Exillon Energy Plc
12th Dec 201312:00 pmRNSForm 8.3 - Exillon Energy Plc
12th Dec 201312:00 pmRNSForm 8.3 - Exillon Energy Plc
12th Dec 201312:00 pmBUSForm 8.3 - Exillon Energy Plc
12th Dec 201311:14 amRNSForm 8.5 (EPT/RI)
11th Dec 20133:25 pmRNSForm 8.3 - Exillon Energy Plc
11th Dec 20132:17 pmRNSStatement re Withdrawal of Possible Offer
11th Dec 201311:33 amRNSForm 8.5 (EPT/RI)
11th Dec 201311:17 amRNSForm 8.3 - Exillon Energy Plc
10th Dec 20132:05 pmRNSForm 8.3 - Exillon Energy Plc
9th Dec 20131:25 pmRNSForm 8.3 - Exillon Energy Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.