Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.375
Bid: 1.35
Ask: 1.40
Change: -0.025 (-1.79%)
Spread: 0.05 (3.704%)
Open: 1.40
High: 1.40
Low: 1.375
Prev. Close: 1.40
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

West Kytlim Platinum Production 2016 - Update

27 Jan 2016 07:00

RNS Number : 0853N
Eurasia Mining PLC
27 January 2016
 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

 

 

West Kytlim Platinum Production 2016 - Update

 

 

Eurasia Mining plc, the Russia focused PGM exploration and development company, is pleased to announce an update with regard to positive developments at the West Kytlim project.

 

In the latter half of 2015 Eurasia secured all necessary approvals and received a production licence for Platinum production at the West Kytlim project.

 

Eurasia is delighted to confirm that production preparatory work has continued in recent months and the Company remains on progress for first Platinum production in 2016.

 

Notwithstanding the pressures evident in the mineral exploration and development sector, we consider that the West Kytlim project is a low capital cost and high margin Platinum production opportunity. The production is of alluvial platinum, gathered from river sands, washed and sent as a bagged black sand to a local refinery for Platinum smelting. As such we believe we will be able to generate revenues upon commencement of production, an event which will dramatically transform Eurasia Mining operationally and financially.

 

The key operational developments recently accomplished are highlighted below:

 

- The contractor for the power line construction (OOO StroiCentre) has started engineering and ecological studies to back up the planned route surveyed last month. This work comprises flora and fauna studies as well as geotechnical drilling.

 

- The surveying teams have completed all field work necessary for incorporation into an application for the Mining Allotment covering the initial production site at Malaya Sosnovka. Survey of the next area scheduled for mining, at Kluchiki, is underway. Mining allotment coverage within the Mining Licence area will be progressively expanded as additional production sites are sequentially added.

 

-The Technical Design Report for the full project is underway, while the report for the initial diesel operation at Malaya Sosnovka is about to be completed. This later report is a detailed mine engineering study for a hydraulic mining operation developing Reserve blocks at the Malaya Sosnovka area, and will in due course be incorporated to the complete development plan.

 

Christian Schaffalitzky Managing Director of Eurasia Mining said: "We are absolutely delighted with operational progress achieved to date at West Kytlim. Shareholders should expect a series of further updates in the coming weeks and months as we put into action the plan to bring the Company into production. That production should deliver first revenues and operating margins for Eurasia after many years of build up and preparations.

 

Despite the continuing subdued markets for the mineral exploration and development sector the team at Eurasia Mining are driving our business forward. We believe that by entering the eagerly anticipated recovery phase for the mineral sector as a Platinum producer, we will be in a great position to create real value for shareholders and grow our business accordingly.

 

We continue to work across our business, driving forward a number of existing and new initiatives, complementary to our work at West Kytlim, and look forward to updating the market as matters crystalise.

 

In the meantime the Board of Eurasia Mining would like to wish shareholders and investors generally a Happy New Year!"

 

Further background to the West Kytlim project and its production potential

 

Alluvial platinum at West Kytlim occurs as nuggets in sand and gravel river deposits and can be liberated by straightforward hydro-mechanical processes. The operation is scalable and modular such that careful planning is required to ascertain the most economic solution. The project development is also iterative in that waste stripping and ore processing must be carefully scheduled to ensure all machinery deployed remains at near full capacity and that work at discrete sites is sequenced correctly.

 

Development at West Kytlim is expected to begin with an initial diesel powered operation at sites where shallow placers with little overburden are amenable to diesel powered earth moving equipment and plant.

 

The Company also intends that a subsequent dragline operation would be phased in once the diesel operation is fully operational. Further dragline sites could later be phased in for concurrent operations at the project. Electrically powered draglines, which greatly reduce operating costs, would require renovation of a power line to the site using a previously constructed route. It is also intended that, after installation of electric power, the diesel operation and its associated plant would in part be modified to switch to the cheaper electric alternative. Cash flow from the diesel operation could then be used to fund further capital expansion from year 2 of platinum production. Under the Company's earlier estimates the operation would operate for a minimum of 10 years and produce approximately 5 tonnes of raw platinum with further potential if the exploration for additional reserves is successful.

 

The Mining Licence of 21.5 square kilometres is for alluvial platinum and is valid until 15 October 2040. The licence is granted to Eurasia's subsidiary company on the basis of first discovery and includes the rights for extraction of platinum and gold.

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Nick Prowting

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300 

Loeb AronJohn Beresford-Peirse+44 (0)207 628 1128

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEEESMFMSEEF
Date   Source Headline
29th Jul 20202:01 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining plc Replacement
28th Jul 202011:15 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
23rd Jul 20205:37 pmRNSForm 8.3 - Eurasia Mining plc
23rd Jul 20202:55 pmRNSForm 8.3 - Eurasia Mining
22nd Jul 20206:30 pmRNSHoldings in Company
17th Jul 20205:41 pmRNSRNS Form 8 (OPD) - Replacement
17th Jul 202011:52 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Jul 20204:41 pmRNSSecond Price Monitoring Extn
15th Jul 20204:36 pmRNSPrice Monitoring Extension
15th Jul 20201:30 pmRNSForm 8 OPD Eurasia Mining Plc
14th Jul 20208:24 amRNSForm 8.3 - Eurasia Mining PLC
13th Jul 20209:05 amRNSSecond Price Monitoring Extn
13th Jul 20209:00 amRNSPrice Monitoring Extension
10th Jul 202011:05 amRNSSecond Price Monitoring Extn
10th Jul 202011:00 amRNSPrice Monitoring Extension
9th Jul 20207:30 amRNSRestoration - Eurasia Mining Plc
9th Jul 20207:00 amRNSRESTORATION OF TRADING ON AIM
8th Jul 20202:44 pmRNSForm 8.3 - Eurasia Mining plc
7th Jul 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
3rd Jul 20201:32 pmRNSForm 8.3 - Eurasia Mining Plc
1st Jul 202010:11 amRNSStatement re formal sale process
1st Jul 20207:00 amRNSAnnual Report and Accounts
27th May 20207:00 amRNSAppointment of Nomad,new NED and Suspension Update
30th Apr 20206:05 pmRNSUpdate
9th Apr 20207:00 amRNSGeneral Update
12th Feb 202012:34 pmRNSExercise of Warrants and Options
11th Feb 20203:11 pmRNSStatement re Suspension
11th Feb 20208:14 amRNSSuspension - Eurasia Mining plc - replacement
11th Feb 20207:48 amRNSSuspension - Eurasia Mining plc
7th Feb 202011:05 amRNSSecond Price Monitoring Extn
7th Feb 202011:00 amRNSPrice Monitoring Extension
5th Feb 20204:40 pmRNSSecond Price Monitoring Extn
5th Feb 20204:35 pmRNSPrice Monitoring Extension
4th Feb 20202:06 pmRNSSecond Price Monitoring Extn
4th Feb 20202:00 pmRNSPrice Monitoring Extension
3rd Feb 20204:40 pmRNSSecond Price Monitoring Extn
3rd Feb 20204:35 pmRNSPrice Monitoring Extension
3rd Feb 20202:05 pmRNSSecond Price Monitoring Extn
3rd Feb 20202:00 pmRNSPrice Monitoring Extension
17th Dec 20199:25 amRNSMonchetundra Flanks Update
4th Dec 201911:05 amRNSSecond Price Monitoring Extn
4th Dec 201911:00 amRNSPrice Monitoring Extension
4th Dec 20199:19 amRNSWest Kytlim and SinoSteel update
4th Dec 20199:19 amRNSMonchetundra Update
29th Nov 20199:03 amRNSExercise of Warrants and Options
28th Nov 20194:41 pmRNSSecond Price Monitoring Extn
28th Nov 20194:36 pmRNSPrice Monitoring Extension
26th Nov 20194:02 pmRNSReplacement: Appointment of NED & W. Kytlim Update
26th Nov 201911:18 amRNSAppointment of Director and West Kytlim Update
25th Nov 20194:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.