Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.70    0.20 (8.00%)
Bid:
2.60
Ask:
2.80
Spread: 0.20 (7.692%)
Market Cap: £79.69m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

Projects update

3 Nov 2016 07:00

RNS Number : 1768O
Eurasia Mining PLC
03 November 2016
 

 

Eurasia Mining plc (AIM: EUA) 

("Eurasia" or the "Company") 

Projects Update

The Company is pleased to update shareholders on progress on its three projects in Russia. Eurasia's West Kytlim platinum and gold project is now in production, first shipments of concentrate began in early September (see RNS dated 9 September 2016). The Monchetundra Project is in late stage development and has been bolstered by an Engineering, Procurement, Construction and Commissioning ("EPC") contract with Sinosteel Equipment and Engineering Co Ltd, while the Semenovsky Gold in Tailings Project remains under review as metallurgical test work for cyanide gold recovery nears completion.

 

 

Monchetundra, Kola Peninsula, NW Russia

 

As announced on Monday 10 October 2016, Eurasia has signed an EPC contract between Sinosteel (one of the largest Chinese stated-owned engineering groups), and Terskaya Gornaya Kompaniya ('TGK'), Eurasia's 80% subsidiary which holds the Monchetundra PGM licence near Monchegorsk, an industrialized area of the Kola Peninsula close to the border with Finland.

 

- Under the terms of the EPC contract, Sinosteel has undertaken to build a processing facility capable of treating 1.7 million tonnes per annum from two open pits within the Monchetundra licence and capable of extracting 130,000 oz of platinum equivalent per annum. The contract value totals US$176,000,000 with a US$50,000,000 subcontract assigned to TGK in respect of preparatory and pre-strip works.

 

- Sinosteel is to be responsible for debt finance covering 85% of the contract value with debt obligations assigned to TGK when the facility achieves production of 130,000 oz PGM equivalent per annum. The loan is assigned to TGK only on successful completion of the works such that Sinosteel are motivated to achieve design capacity on schedule. Interest is charged at a floating rate of 6 month LIBOR +3.5% per annum and the loan term set at 10 years with no penalty for early repayment.

 

- Following the success of the royalty-like structure signed and implemented on the West Kytlim project, Eurasia has entered into talks with an international engineering company to manage the mining operation at the Monchetundra project, and to work for the company as the owner's representative throughout the design and build phase of the Sinosteel EPC agreement and thereafter during the operation of the mine. It is envisaged that the structure used successfully at West Kytlim, where the mining operation is outsourced for a split on revenue, can be replicated at the Monchetundra project. Further updates will be made in due course.

 

 

 

West Kytlim, Urals

 

Mining and production of platinum continues at West Kytlim, with weather not stopping production and the forecast reasonable for the coming weeks. The Company will provide details of the final production figures and projected income on completion of the season's works. The trial mining operation has tested two washplants, one owned by Eurasia and refurbished on site, and another larger plant supplied by the contractor SK-Region Stroy. The information pertaining to the constitution and washability of gravels gained from these exercises will be instrumental in ensuring a smooth path to next season's production, as we approach the close of this year's mining season.

 

 

Semenovsky Tailings Project, Urals

 

Metallurgical testwork continues to investigate the details of the tailings composition, in view of the material being sourced historically from three mines with different mineralogy. This work will be completed shortly and then form the basis of an assessment by metallurgists for the optimal production route. Work is being carried out at SGS Chita and further announcements will be made in due course.

 

 

 

MD Christian Schaffalitzky commented: 

 

"We have endeavored to replicate the structure, which has been proven to work at West Kytlim, at the Monchetundra Project with an additional contract to cover the considerable capital outlay. We believe this presents a route to project development which minimizes exposure for Eurasia, further shareholder dilution, and allows the project to be developed despite a continuing resource sector downturn.

 

We believe the transaction is very much on trend considering Sino-Russian relations over the past number of years. Chinese firms are increasingly active in the Russian market in rare earths, PGM, base metals and precious metals. It was our intention to capitalize on this evolving relationship and to offset some of the development risk to a suitably qualified and experienced engineering firm with considerable banking and political reach. Sinosteel is, under the terms of the contract, highly motivated to deliver the plant as stipulated in the contract, because they will be responsible for $150 million until they reach the production level of 130,000 oz of platinum equivalent per annum.

 

Further outsourcing the running of the mine to an international company with experience in operating mines is now a top priority for Eurasia. Engaging such a group to act as owner's representative during plant construction aims to ensure the plant is built in line with best international practice. We look forward to updating on developments in this regard in the near term."

 

 

Enquiries:

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

WH Ireland Limited

Katy Mitchell/Nick Prowting

+44 (0)161 832 2174

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDFSFFMEFMSEFF
Date   Source Headline
17th Dec 20214:41 pmRNSSecond Price Monitoring Extn
17th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20219:06 amRNSSecond Price Monitoring Extn
16th Dec 20219:00 amRNSPrice Monitoring Extension
16th Dec 20217:00 amRNSTier-1 scale JORC MRE at NKT ex-operating Ni mine
6th Dec 20216:03 pmRNSBinding Agreement Signed with ERDC
23rd Nov 20217:00 amRNSMoscow Exchange Dual Listing Plans
16th Nov 20217:00 amRNSWest Kytlim Flanks License Received
28th Oct 20217:00 amRNSPotential Sale Update
30th Sep 20215:22 pmRNSInterim Report
27th Sep 20219:05 amRNSSecond Price Monitoring Extn
27th Sep 20219:00 amRNSPrice Monitoring Extension
24th Sep 20216:16 pmRNSCompletion of US$15m financing for Rosgeo JV
22nd Sep 20212:06 pmRNSSecond Price Monitoring Extn
22nd Sep 20212:01 pmRNSPrice Monitoring Extension
22nd Sep 202111:06 amRNSSecond Price Monitoring Extn
22nd Sep 202111:01 amRNSPrice Monitoring Extension
20th Sep 20217:33 amRNSPlacement of US$15m at 26p for Rosgeo JV
15th Sep 20217:00 amRNSMonchetundra Detailed Mining Plan
7th Sep 20219:05 amRNSSecond Price Monitoring Extn
7th Sep 20219:00 amRNSPrice Monitoring Extension
3rd Sep 202111:05 amRNSSecond Price Monitoring Extn
3rd Sep 202111:00 amRNSPrice Monitoring Extension
1st Sep 20219:05 amRNSSecond Price Monitoring Extn
1st Sep 20219:00 amRNSPrice Monitoring Extension
1st Sep 20217:00 amRNSShare Price Movement and Progress Update
31st Aug 20214:35 pmRNSPrice Monitoring Extension
31st Aug 20212:05 pmRNSSecond Price Monitoring Extn
31st Aug 20212:00 pmRNSPrice Monitoring Extension
26th Aug 20217:00 amRNSNyud Progress Update
11th Aug 202112:17 pmRNSThree plants launched at West Kytlim
26th Jul 20215:37 pmRNSKola Subsidiaries’ New CEO Appointment
28th Jun 20215:57 pmRNS2021 Annual General Meeting Results
22nd Jun 20211:55 pmRNSAGM Update and Shareholder Questions
15th Jun 20217:00 amRNSRosgeo JV Update
4th Jun 20214:43 pmRNSNotification of AGM & publication of Annual Report
26th May 20217:00 amRNSCompletion of US$20m financing for Rosgeo JV
20th May 20217:00 amRNSPrivate Placement of US$20m for Rosgeo JV
13th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th May 20219:05 amRNSSecond Price Monitoring Extn
13th May 20219:00 amRNSPrice Monitoring Extension
12th May 20216:08 pmRNSPotential asset sale, FSP & other updates
12th May 20213:20 pmRNSForm 8.3 -Eurasia Mining plc
12th May 202112:48 pmRNSForm 8.5 (EPT/NON-RI) - Eurasia Mining Plc
12th May 202111:19 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
11th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
10th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
7th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
4th May 20217:00 amRNSForm 8.3 - Eurasia Mining plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.