Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.45    -0.05 (-2.00%)
Bid:
2.30
Ask:
2.60
Spread: 0.30 (13.043%)
Market Cap: £72.31m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

New Contractor Appointed at West Kytlim

9 Mar 2018 07:00

RNS Number : 1807H
Eurasia Mining PLC
09 March 2018
 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

 

 

New contractor appointed at West Kytlim, commencement of site work

 

 

Eurasia, the London listed platinum group metals and gold producer, is pleased to announce the commencement of site works for the 2018 field season at its West Kytlim Project in the Ural Mountains. Terms have now been finalised with OOO Techstroy of Nizhny Tagil ("Techstroy").

 

Christian Schaffalitzky, Executive Chairman at Eurasia commented "We are very pleased with this result which comes after extensive discussions, predominantly technical in nature, over the past number of months. We are very much looking forward to a successful mining season at West Kytlim and to working together with our new partners Techstroy. Site works have already commenced, in this the first week of March, a marked improvement on last year. This means we can take full advantage of the full mining season at Malaya Sosnovka starting now and aim to break ground at the Kluchiki area later this summer. In a show of good faith the contractors mobilised equipment to site a week ahead of final signing of the contract. We look forward to reporting on progress from the site in the near future."

 

Highlights:

 

- Machinery and equipment mobilised to site with stripping works to commence immediately.

- Revised flow sheet to incorporate a trommel and scrubber arrangement prior to sluice.

- Mining to initially focus on the Malaya Sosnovka site which contains 275,000m3 of productive gravels and 84 kilograms raw platinum.

- Mining to progress to the larger Kluchiki site which contains 893,000m3 of productive gravels for 319 kilograms raw platinum.

- Targeted productivity ranging 50,000m3 to 70,000m3 per month at a single working site.

- Options for deploying further washplants remain available to both Eurasia and Techstroy, who are permitted under the contract to deploy a second washplant during the 2018 mining season.

- Techstroy to manage mining, trucking and beneficiation of platinum bearing gravels, including construction, delivery and installation of mining and processing equipment in accordance with a mine design agreed between the parties.

- Techstroy to be further responsible for site clearance, preparatory and stripping works, washing of gravels and land rehabilitation.

- Eurasia to be responsible for the upgrade of the sluice concentrate to a saleable product at the existing onsite laboratory, as well as platinum refining and revenue distribution.

- Eurasia maintain complete project ownership and management of the mining license, the ongoing program to upgrade resources to reserves ahead of mining, and new licence applications on ground adjacent to the current mining licence.

- Sales revenues to be split 65%/35% in favour of the contractor with no further financial consideration. The distribution of sales revenue to be managed by Eurasia as and when payments are made in accordance with the existing metals refining and sales agreement between Eurasia and the metals refinery in Ekaterinburg (see RNS dated 28 July 2016).

 

Background to the agreement

 

Techstroy, based in Nizhny Tagil is an alluvial mining contractor with experience at mining operations in the Perm Oblast (Eastern Ural Mountains) including at the Suria Kazanskaya alluvial gold mine. Extensive technical discussions have been ongoing with Eurasia mining engineers over the past six to eight weeks, including a site visit in late January 2018. A thorough evaluation of the 2017 mining season was undertaken as well as comprehensive mine scheduling for the 2018 season. Techstroy have committed a fleet of mining equipment to the project including two Komatsu excavators, three bulldozers, one loader and five Kamaz 6520 ore trucks. Eurasia's Directors are confident the contractor has the necessary skill set and balance sheet to execute a successful mining operation in 2018 and in subsequent years.

 

Eurasia's West Kytlim Project is the second largest alluvial platinum reserve in the world currently, with 2,283 kilograms of raw platinum in reserves (defined to GKZ C1 and C2 standard) with resources and resource potential to a further 10 tonnes of raw platinum. For a more detailed reserves and resources summary please see RNS dated 05 December 2017.

 

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky / Keith Byrne

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell / James Sinclair-Ford

+44 (0)161 832 2174

 

 

Glossary of Key Terms

A,B, C1 and C2 - Categories of ore body defined under the Russian Standard as having met minimum requirements of exploration information and knowledge.

 JORC - The Australian code for reporting of exploration results, mineral resources and ore reserves, as published by the Joint Ore Reserves Committee of the Australian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

GKZ - Russian state commission on mineral reserves which ensures Gosstandart compliance.

Reserves - Probable and Proven Reserves (or equivalent depending on the Standard used). Closely comparable to Russian Standard C1 but may contain material of Russian Standard categories A, B, C1 and C2.

Resources - Inferred, Indicated and Measured Resources (or equivalent depending on the Standard used). Closely comparable to Russian Standard C2 but may contain material of Russian Standard categories A, B, C1and C2.

 Russian Standard - Referring to the Gosstandart of Russia, the national Russian standard on mining and minerals as published by the National Certification Body of the Russian Federation and adhered to by GKZ and

Rosnedra. - Russian federal agency for subsoil use which oversees the work of GKZ and manages the state balance of mineral resources.

Russian Standard - Referring to the Gosstandart of Russia, the national Russian standard on mining and minerals as published by the National Certification Body of the Russian Federation and adhered to by GKZ and Rosnedra.

 

This announcement includes inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
CNTMMGGFVRZGRZM
Date   Source Headline
20th Apr 20267:00 amRNSCompany Update
15th Jan 20265:33 pmRNSResult of General Meeting
14th Jan 20267:00 amRNS-RWebinar Q&A on Website
29th Dec 20255:41 pmRNSWest Kytlim Sale & GM Notice
29th Dec 20255:41 pmRNSWest Kytlim Sale & GM Notice
1st Dec 20257:00 amRNSMonchentudra Asset Detailed Design Completion
22nd Oct 20257:00 amRNS-RBroker Note Published & Investor Webinar
7th Oct 20252:00 pmRNS-RBroker Note Update
30th Sep 20257:00 amRNSInterim Results
22nd Sep 20253:30 pmRNS-RPublished Research Note
27th Aug 20257:00 amRNSNKT Update
21st Aug 202510:00 amRNSAIX Update
19th Aug 20252:45 pmRNSResult of AGM
4th Aug 20253:45 pmRNSAIX Trading Update
28th Jul 20252:15 pmRNSWest Kytlim Operation Update and AIX Progress
22nd Jul 202512:49 pmRNSAIX Trading Start
17th Jul 20257:00 amRNSAIX Trading Update
15th Jul 20255:16 pmRNSCross-Listing Completion & AIX Trading Launch
15th Jul 20259:33 amRNSAIX Dual Listing Update
9th Jul 202511:51 amRNSAppointment of Dual Listing Market Maker
4th Jul 20258:12 amRNSNotice of AGM
2nd Jul 20252:23 pmRNSAstana Dual-Listing Update
1st Jul 202511:04 amRNS2024 Annual Results - Replacement
1st Jul 20257:10 amRNSAnnual Results for the year ended 31 December 2024
27th Jun 20257:00 amRNSNominated Adviser Change & Dual Listing Update
19th May 202510:50 amRNS-RInvestor Webinar on 22 May 2025
17th Apr 20257:00 amRNSCorporate and Planned Dual Listing Update
10th Apr 20257:00 amRNS-RInvestor Webinar - Update for Registration
28th Mar 20257:50 amRNSFundraise to raise gross proceeds of circa £3.15m
27th Mar 20252:23 pmRNS-RInvestor Webinar to Provide Corporate Update
3rd Jan 20254:55 pmRNSTotal Voting Rights
31st Dec 202410:00 amRNSExtension of Warrants
10th Dec 20244:06 pmRNSSanderson Loan Drawdown and Issue of Equity
15th Nov 20241:46 pmRNSResult of AGM
16th Oct 20247:00 amRNSNotice of 2024 Annual General Meeting
27th Sep 20247:00 amRNSInterim Results
23rd Sep 20244:02 pmRNSExtension of Warrants
9th Sep 20247:30 amRNSRestoration - Eurasia Mining plc
6th Sep 20246:26 pmRNSAnnual Results for the year ended 31 December 2023
6th Sep 20246:26 pmRNSTrade Finance Loan Agreement
2nd Sep 20247:00 amRNSUpdate regarding Annual Report
28th Aug 20247:00 amRNSUpdate re Annual Report and Financial Position
29th Jul 20243:30 pmRNSUpdate regarding Annual Report
1st Jul 20247:30 amRNSSuspension - Eurasia Mining plc
27th Jun 20244:01 pmRNSUpdate regarding AR and Suspension - Replacement
27th Jun 20243:20 pmRNSUpdate regarding Annual Report and Suspension
10th Jun 20249:45 amRNSStatement re Share Price Movement
22nd Mar 20249:26 amRNSReplacement of Queeld & Mispare share certificates
6th Mar 20247:55 amRNSUpdate re Queeld & Mispare share certificates
11th Jan 202410:19 amRNSSupreme Court Tax Litigation Win

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.