Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.375
Bid: 1.35
Ask: 1.40
Change: -0.025 (-1.79%)
Spread: 0.05 (3.704%)
Open: 1.40
High: 1.40
Low: 1.375
Prev. Close: 1.40
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining start-up at West Kytlim

21 Jun 2016 07:00

RNS Number : 7515B
Eurasia Mining PLC
21 June 2016
 

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

 

Mining start-up at West Kytlim

 

Eurasia Mining plc, the PGM and gold mining company, is pleased to announce that the start up operation at its West Kytlim platinum and gold mine has commenced. As reported on 25 May 2016, SK Region-Stroy ("SKRS"), have been appointed contractors for this work.

As also set out in the announcement dated 25 May 2016, under the terms of the agreement SKRS will cover all capital and operating costs. In return, revenue from the sale of platinum and gold concentrates sold to the refinery is to be split 70:30, with Eurasia receiving 30%. Eurasia will manage the collection and transportation of the precious metal concentrates and the distribution of income.

Earth-moving equipment has already been engaged for several weeks at the mine site carrying out preparatory works including pit protection drainage ditches, tailings storage ponds and stockpile areas. Accommodation, maintenance and fuel storage facilities have been installed. Access to forestry areas is advancing on schedule. Soil removal will be carried out directly after tree felling. In line with our environment management plan the soils will be stockpiled for restoration after mining. Stripped overburden will be used in the construction of mine site hydro-technical infrastructure.

Outcropping Ore Blocks 4 and 5 at Malaya Sosnovka are scheduled to be processed first. Blocks 1, 2 and 3 follow immediately and will be processed by late October or early November.

Total gravel Reserves to be processed in the start-up operation is 277,000 m3; this should be considered in the context of total life of mine Reserves plus Resources of 13.8 million m3 (see announcement of 22 April 2014) Estimated life of mine for the entire project is a minimum of 10 years based on three concurrent wash plant sites; two utilizing dragline mining with a third using excavators and trucks in an expanded similar scheme to that currently underway at Malaya Sosnovka (see announcement of 25 May 2016) . An electric powerline will be constructed over the winter of 2016 to power draglines and other plant. The initial diesel operation and hydraulic plant, as described above, is the first step on route to significant capital expansion planned for 2017. The capital cost for the expansion will be covered by the contractor.

Some pictures showing the arrival of the machinery on site are available through our company twitter feed and on our website, www.eurasiamining.co.uk.

MD Christian Schaffalitzky commented; ' We are very impressed with the speed at which SKRS have been able to mobilise men and equipment and make the circa 600km long journey from their operating base. This is excellent progress demonstrating their motivation and capacity for the task at hand. Key Eurasia management staff and mining engineers are also in the camp at the site to direct the initial mining project. This is a very exciting time indeed and we are delighted to be taking a step closer to our promise of first platinum and gold production in 2016.'

We look forward to updating on further developments in the very near term.

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

Enquiries:

 Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

 WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

 Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUCCQUPQGMU
Date   Source Headline
7th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
4th May 20217:00 amRNSForm 8.3 - Eurasia Mining plc
30th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
28th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
28th Apr 20211:13 pmRNSGeneral Meeting Results
28th Apr 202111:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
27th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Apr 20216:15 pmRNSForm 8.3 - Eurasia Mining PLC
26th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Apr 202111:33 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
23rd Apr 20215:04 pmRNSForm 8.3 - Eurasia Mining PLC
23rd Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
20th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
19th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Apr 202111:59 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Apr 202111:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
14th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
14th Apr 202111:51 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
13th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th Apr 202111:14 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
12th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Apr 20216:29 pmRNSNotice of EGM
9th Apr 20216:29 pmRNSDirector Appointment
9th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Apr 202111:43 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
8th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
7th Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th Apr 202111:20 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
1st Apr 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
31st Mar 20217:30 amRNSForm 8.3 - Eurasia Mining
30th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
30th Mar 202111:21 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
29th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Mar 202110:27 amRNSForm 8.5 (EPT/RI)
26th Mar 20215:00 pmRNSBinding Agreement Signed with Rosgeo
26th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Mar 202111:45 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
25th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Mar 202111:25 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
23rd Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
23rd Mar 202111:30 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
22nd Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Mar 202111:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
19th Mar 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
19th Mar 202111:46 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.