GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.95
Bid: 1.90
Ask: 2.00
Change: -0.35 (-15.22%)
Spread: 0.10 (5.263%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining start-up at West Kytlim

21 Jun 2016 07:00

RNS Number : 7515B
Eurasia Mining PLC
21 June 2016
 

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

 

Mining start-up at West Kytlim

 

Eurasia Mining plc, the PGM and gold mining company, is pleased to announce that the start up operation at its West Kytlim platinum and gold mine has commenced. As reported on 25 May 2016, SK Region-Stroy ("SKRS"), have been appointed contractors for this work.

As also set out in the announcement dated 25 May 2016, under the terms of the agreement SKRS will cover all capital and operating costs. In return, revenue from the sale of platinum and gold concentrates sold to the refinery is to be split 70:30, with Eurasia receiving 30%. Eurasia will manage the collection and transportation of the precious metal concentrates and the distribution of income.

Earth-moving equipment has already been engaged for several weeks at the mine site carrying out preparatory works including pit protection drainage ditches, tailings storage ponds and stockpile areas. Accommodation, maintenance and fuel storage facilities have been installed. Access to forestry areas is advancing on schedule. Soil removal will be carried out directly after tree felling. In line with our environment management plan the soils will be stockpiled for restoration after mining. Stripped overburden will be used in the construction of mine site hydro-technical infrastructure.

Outcropping Ore Blocks 4 and 5 at Malaya Sosnovka are scheduled to be processed first. Blocks 1, 2 and 3 follow immediately and will be processed by late October or early November.

Total gravel Reserves to be processed in the start-up operation is 277,000 m3; this should be considered in the context of total life of mine Reserves plus Resources of 13.8 million m3 (see announcement of 22 April 2014) Estimated life of mine for the entire project is a minimum of 10 years based on three concurrent wash plant sites; two utilizing dragline mining with a third using excavators and trucks in an expanded similar scheme to that currently underway at Malaya Sosnovka (see announcement of 25 May 2016) . An electric powerline will be constructed over the winter of 2016 to power draglines and other plant. The initial diesel operation and hydraulic plant, as described above, is the first step on route to significant capital expansion planned for 2017. The capital cost for the expansion will be covered by the contractor.

Some pictures showing the arrival of the machinery on site are available through our company twitter feed and on our website, www.eurasiamining.co.uk.

MD Christian Schaffalitzky commented; ' We are very impressed with the speed at which SKRS have been able to mobilise men and equipment and make the circa 600km long journey from their operating base. This is excellent progress demonstrating their motivation and capacity for the task at hand. Key Eurasia management staff and mining engineers are also in the camp at the site to direct the initial mining project. This is a very exciting time indeed and we are delighted to be taking a step closer to our promise of first platinum and gold production in 2016.'

We look forward to updating on further developments in the very near term.

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

Enquiries:

 Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

 WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

 Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUCCQUPQGMU
Date   Source Headline
29th Jul 20202:01 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining plc Replacement
28th Jul 202011:15 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
23rd Jul 20205:37 pmRNSForm 8.3 - Eurasia Mining plc
23rd Jul 20202:55 pmRNSForm 8.3 - Eurasia Mining
22nd Jul 20206:30 pmRNSHoldings in Company
17th Jul 20205:41 pmRNSRNS Form 8 (OPD) - Replacement
17th Jul 202011:52 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Jul 20204:41 pmRNSSecond Price Monitoring Extn
15th Jul 20204:36 pmRNSPrice Monitoring Extension
15th Jul 20201:30 pmRNSForm 8 OPD Eurasia Mining Plc
14th Jul 20208:24 amRNSForm 8.3 - Eurasia Mining PLC
13th Jul 20209:05 amRNSSecond Price Monitoring Extn
13th Jul 20209:00 amRNSPrice Monitoring Extension
10th Jul 202011:05 amRNSSecond Price Monitoring Extn
10th Jul 202011:00 amRNSPrice Monitoring Extension
9th Jul 20207:30 amRNSRestoration - Eurasia Mining Plc
9th Jul 20207:00 amRNSRESTORATION OF TRADING ON AIM
8th Jul 20202:44 pmRNSForm 8.3 - Eurasia Mining plc
7th Jul 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
3rd Jul 20201:32 pmRNSForm 8.3 - Eurasia Mining Plc
1st Jul 202010:11 amRNSStatement re formal sale process
1st Jul 20207:00 amRNSAnnual Report and Accounts
27th May 20207:00 amRNSAppointment of Nomad,new NED and Suspension Update
30th Apr 20206:05 pmRNSUpdate
9th Apr 20207:00 amRNSGeneral Update
12th Feb 202012:34 pmRNSExercise of Warrants and Options
11th Feb 20203:11 pmRNSStatement re Suspension
11th Feb 20208:14 amRNSSuspension - Eurasia Mining plc - replacement
11th Feb 20207:48 amRNSSuspension - Eurasia Mining plc
7th Feb 202011:05 amRNSSecond Price Monitoring Extn
7th Feb 202011:00 amRNSPrice Monitoring Extension
5th Feb 20204:40 pmRNSSecond Price Monitoring Extn
5th Feb 20204:35 pmRNSPrice Monitoring Extension
4th Feb 20202:06 pmRNSSecond Price Monitoring Extn
4th Feb 20202:00 pmRNSPrice Monitoring Extension
3rd Feb 20204:40 pmRNSSecond Price Monitoring Extn
3rd Feb 20204:35 pmRNSPrice Monitoring Extension
3rd Feb 20202:05 pmRNSSecond Price Monitoring Extn
3rd Feb 20202:00 pmRNSPrice Monitoring Extension
17th Dec 20199:25 amRNSMonchetundra Flanks Update
4th Dec 201911:05 amRNSSecond Price Monitoring Extn
4th Dec 201911:00 amRNSPrice Monitoring Extension
4th Dec 20199:19 amRNSWest Kytlim and SinoSteel update
4th Dec 20199:19 amRNSMonchetundra Update
29th Nov 20199:03 amRNSExercise of Warrants and Options
28th Nov 20194:41 pmRNSSecond Price Monitoring Extn
28th Nov 20194:36 pmRNSPrice Monitoring Extension
26th Nov 20194:02 pmRNSReplacement: Appointment of NED & W. Kytlim Update
26th Nov 201911:18 amRNSAppointment of Director and West Kytlim Update
25th Nov 20194:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.