GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.95
Bid: 1.90
Ask: 2.00
Change: -0.35 (-15.22%)
Spread: 0.10 (5.263%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining start-up at West Kytlim

21 Jun 2016 07:00

RNS Number : 7515B
Eurasia Mining PLC
21 June 2016
 

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

 

Mining start-up at West Kytlim

 

Eurasia Mining plc, the PGM and gold mining company, is pleased to announce that the start up operation at its West Kytlim platinum and gold mine has commenced. As reported on 25 May 2016, SK Region-Stroy ("SKRS"), have been appointed contractors for this work.

As also set out in the announcement dated 25 May 2016, under the terms of the agreement SKRS will cover all capital and operating costs. In return, revenue from the sale of platinum and gold concentrates sold to the refinery is to be split 70:30, with Eurasia receiving 30%. Eurasia will manage the collection and transportation of the precious metal concentrates and the distribution of income.

Earth-moving equipment has already been engaged for several weeks at the mine site carrying out preparatory works including pit protection drainage ditches, tailings storage ponds and stockpile areas. Accommodation, maintenance and fuel storage facilities have been installed. Access to forestry areas is advancing on schedule. Soil removal will be carried out directly after tree felling. In line with our environment management plan the soils will be stockpiled for restoration after mining. Stripped overburden will be used in the construction of mine site hydro-technical infrastructure.

Outcropping Ore Blocks 4 and 5 at Malaya Sosnovka are scheduled to be processed first. Blocks 1, 2 and 3 follow immediately and will be processed by late October or early November.

Total gravel Reserves to be processed in the start-up operation is 277,000 m3; this should be considered in the context of total life of mine Reserves plus Resources of 13.8 million m3 (see announcement of 22 April 2014) Estimated life of mine for the entire project is a minimum of 10 years based on three concurrent wash plant sites; two utilizing dragline mining with a third using excavators and trucks in an expanded similar scheme to that currently underway at Malaya Sosnovka (see announcement of 25 May 2016) . An electric powerline will be constructed over the winter of 2016 to power draglines and other plant. The initial diesel operation and hydraulic plant, as described above, is the first step on route to significant capital expansion planned for 2017. The capital cost for the expansion will be covered by the contractor.

Some pictures showing the arrival of the machinery on site are available through our company twitter feed and on our website, www.eurasiamining.co.uk.

MD Christian Schaffalitzky commented; ' We are very impressed with the speed at which SKRS have been able to mobilise men and equipment and make the circa 600km long journey from their operating base. This is excellent progress demonstrating their motivation and capacity for the task at hand. Key Eurasia management staff and mining engineers are also in the camp at the site to direct the initial mining project. This is a very exciting time indeed and we are delighted to be taking a step closer to our promise of first platinum and gold production in 2016.'

We look forward to updating on further developments in the very near term.

Consent for release

EurGeol Christian Schaffalitzky, FIMMM, PGeo, MIEI, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

 

Enquiries:

 Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

 WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

 Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUCCQUPQGMU
Date   Source Headline
6th Jan 20227:00 amRNSDividend Policy Adopted by the Board
30th Dec 20217:00 amRNSHydrogen and Ammonia Strategy
21st Dec 20217:00 amRNSChairman of Japanese Kono appointed as Director
17th Dec 20214:41 pmRNSSecond Price Monitoring Extn
17th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20219:06 amRNSSecond Price Monitoring Extn
16th Dec 20219:00 amRNSPrice Monitoring Extension
16th Dec 20217:00 amRNSTier-1 scale JORC MRE at NKT ex-operating Ni mine
6th Dec 20216:03 pmRNSBinding Agreement Signed with ERDC
23rd Nov 20217:00 amRNSMoscow Exchange Dual Listing Plans
16th Nov 20217:00 amRNSWest Kytlim Flanks License Received
28th Oct 20217:00 amRNSPotential Sale Update
30th Sep 20215:22 pmRNSInterim Report
27th Sep 20219:05 amRNSSecond Price Monitoring Extn
27th Sep 20219:00 amRNSPrice Monitoring Extension
24th Sep 20216:16 pmRNSCompletion of US$15m financing for Rosgeo JV
22nd Sep 20212:06 pmRNSSecond Price Monitoring Extn
22nd Sep 20212:01 pmRNSPrice Monitoring Extension
22nd Sep 202111:06 amRNSSecond Price Monitoring Extn
22nd Sep 202111:01 amRNSPrice Monitoring Extension
20th Sep 20217:33 amRNSPlacement of US$15m at 26p for Rosgeo JV
15th Sep 20217:00 amRNSMonchetundra Detailed Mining Plan
7th Sep 20219:05 amRNSSecond Price Monitoring Extn
7th Sep 20219:00 amRNSPrice Monitoring Extension
3rd Sep 202111:05 amRNSSecond Price Monitoring Extn
3rd Sep 202111:00 amRNSPrice Monitoring Extension
1st Sep 20219:05 amRNSSecond Price Monitoring Extn
1st Sep 20219:00 amRNSPrice Monitoring Extension
1st Sep 20217:00 amRNSShare Price Movement and Progress Update
31st Aug 20214:35 pmRNSPrice Monitoring Extension
31st Aug 20212:05 pmRNSSecond Price Monitoring Extn
31st Aug 20212:00 pmRNSPrice Monitoring Extension
26th Aug 20217:00 amRNSNyud Progress Update
11th Aug 202112:17 pmRNSThree plants launched at West Kytlim
26th Jul 20215:37 pmRNSKola Subsidiaries’ New CEO Appointment
28th Jun 20215:57 pmRNS2021 Annual General Meeting Results
22nd Jun 20211:55 pmRNSAGM Update and Shareholder Questions
15th Jun 20217:00 amRNSRosgeo JV Update
4th Jun 20214:43 pmRNSNotification of AGM & publication of Annual Report
26th May 20217:00 amRNSCompletion of US$20m financing for Rosgeo JV
20th May 20217:00 amRNSPrivate Placement of US$20m for Rosgeo JV
13th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th May 20219:05 amRNSSecond Price Monitoring Extn
13th May 20219:00 amRNSPrice Monitoring Extension
12th May 20216:08 pmRNSPotential asset sale, FSP & other updates
12th May 20213:20 pmRNSForm 8.3 -Eurasia Mining plc
12th May 202112:48 pmRNSForm 8.5 (EPT/NON-RI) - Eurasia Mining Plc
12th May 202111:19 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
11th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
10th May 20213:20 pmRNSForm 8.3 - Eurasia Mining plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.