If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEnergyPathways Regulatory News (EPP)

Share Price Information for EnergyPathways (EPP)

Share Price is delayed by 15 minutes
Get Live Data
6.40    0.00 (0.00%)
Bid:
6.20
Ask:
6.60
Spread: 0.40 (6.452%)
Market Cap: £16.05m
EPP Live PriceLast checked at - London Stock Exchange

Intraday EnergyPathways Share Chart

Government update on Climate Change Levy

3 Apr 2025 11:00

RNS Number : 5442D
EnergyPathways PLC
03 April 2025
Β 

3 April 2025

EnergyPathways plc

Β 

("EnergyPathways" or the "Company")

Β 

UK government to remove Climate Change Levy (CCL) costs from electrolytic hydrogen production

Β 

EnergyPathways (AIM: EPP), an energy transition company, notes with interest the update provided by the UK government within the Spring Statement 2025, regarding the removal of Climate Change Levy (CCL) costs from electricity used in electrolysis to produce hydrogen. This measure supports the growth of low carbon electrolytic hydrogen production in the UK, which benefits EnergyPathways' wider hydrogen ambitions.

Β 

EnergyPathways' Planned MESH Project

Β 

EnergyPathways' planned MESH project ("MESH" or the "Project") is an integrated energy storage hub with an estimated storage capacity of up to 20TWh, equivalent to 7% of the UK's current annual electricity demand.

Β 

The Project is expected to include the development of a large-scale salt cavern hydrogen storage facility (to be known as MESH-H2) of up to 640 MW, with total storage capacity of 2.8 TWh. The hydrogen storage facility will be integrated with the wider MESH project and linked to regional offshore wind to store and supply decarbonised energy. MESH-H2 will potentially be the UK's largest hydrogen storage facility.

Β 

The MESH project will also include the development of a 400 MW compressed air Long Duration Energy Storage (LDES) facility, providing a multi-day clean power supply. Once developed, it will have the potential to be the largest LDES facility in Europe. MESH can be enhanced to provide up to 700 MW of low-carbon flexible power through a highly flexible future-proofed hybrid compressed air storage system (H-CAES) that can be transitioned to carbon free hydrogen based power.

Β 

EnergyPathways plans to submit an application in the UK Government's planned Hydrogen Storage Allocation Round and believes the MESH H2 design has competitive attributes that can attract Government support.

Β 

EnergyPathways has also submitted a gas storage licence application to the Government regulator in relation to both hydrogen and natural gas storage development and operations. If successful, EnergyPathways will further progress the MESH development.

Β 

Department of Energy Security and Net Zero (DESNZ) Consultation:

Β 

In its Spring Statement 2025, the UK government committed to removing CCL costs from electricity used in electrolysis to produce hydrogen, currently charged at a rate of Β£7.75 per MWh. This will support the growth of low carbon electrolytic hydrogen production, which will play an important role in decarbonising the power system and hard to electrify industrial and transport sectors.

Β 

In conjunction with this commitment, DESNZ has issued a consultation that seeks views to determine the best legislative route to remove these CCL costs and ensure their removal is delivered in a way that achieves the government's objectives, whilst avoiding unintended consequences. The consultation acknowledges that the wider energy landscape has changed significantly since CCL was introduced, and will continue to develop, therefore the government also announced that it will conduct a wider review of CCL.

Β 

The consultation recognises that electrolytic hydrogen has the potential to support the delivery of net zero in several different ways and references the Autumn Budget 2024 in which the government confirmed that it would support projects awarded contracts in the first electrolytic Hydrogen Allocation Round, harnessing renewable energy to decarbonise industry and transport across the length and breadth the of the UK.

Β 

To inform the scope of this review, the consultation seeks views on other areas where CCL may need to be reviewed to ensure it is aligned with developments in the changing energy landscape and the government's clean power and net zero missions

Β 

The consultation can be viewed here: https://www.gov.uk/government/consultations/climate-change-levy-electrolytic-hydrogen-and-energy-context

Β 

Ben Clube, CEO of EnergyPathways said:

Β 

"It is encouraging to see the UK government increasingly promoting the benefits of the hydrogen economy and emphasising the important role [green] hydrogen will play in decarbonising the UK's energy future. It is also reassuring to see that the UK government is committing to improved fiscal terms that encourage investment into the hydrogen sector. As referenced in the consultation, the changing energy landscape requires stakeholder collaboration to collectively deliver on the UK government's clean power and net zero mission. It is exactly in this context that EnergyPathways is promoting the multiple socioeconomic and environmental benefits of its planned MESH project, that seeks to provide a secure and dependable supply of natural gas, compressed air and green hydrogen for the UK market for over 25 years. We believe that MESH therefore represents an important project in supporting the delivery of the UK's energy policy. It is also noteworthy that MESH's compressed air storage power, generated from harnessed wind power, also falls outside the CCL remit."

Β 

About MESH

Β 

MESH is a new large scale energy storage facility that is expected to provide a secure and dependable supply of natural gas and green hydrogen and low carbon flexible power for the UK market for over 25 years.Β MESH is an integrated energy system solution. It is electrifying and integrating existing infrastructure, connecting gas storage, hydrogen storage, and compressed air storage technologies with offshore wind and decarbonised power generation to establish a new major decarbonised energy hub for the UK.

Β 

MESH is expected to be the UK's largest integrated energy storage facility combining natural gas, compressed air and hydrogen storage. It will be able to store up to 20 TWh of energy. The MESH project is intended to deliver on the Government's 2030 Clean Power timeline and will ensure a reliable and secure supply of energy for the UK. MESH has been designed as a fully decarbonised and electrified zero emission facility that is to be powered by the renewable wind farms of the UK Irish Sea region. EnergyPathways aims to play its role in supporting the Government in accelerating the UK's energy transition.

Β 

Investor Engagement with EnergyPathways

Engage with us by asking questions, watching video summaries and seeing what other shareholders have to say. Navigate to our Interactive Investor website here: https://energypathways.uk/link/WPGpzy

Β 

Enquiries

Β 

Investor questions on this announcement We encourage all investors to share questions on this announcement via our investor hub

https://energypathways.uk/announcements

EnergyPathways Ben Clube / Max Williams

Tel: +44 (0)207 466 5000, c/o Burson Buchanan (Financial PR)

Email : info@energypathways.uk

Cairn Financial Advisers LLP (Nominated Adviser) Jo Turner / Louise O'Driscoll / Sandy Jamieson

Tel: +44 (0)20 7213 0880

SP Angel Corporate Finance LLP (Broker) Richard Hail / Adam Cowl

Tel: +44 (0)20 3470 0470

Global Investment Strategy UK Limited (Joint Broker) Callum Hill / James Sheehan

Tel: +44 (0)20 7048 9000

Β 

Subscribe to our news alert service: energypathways.uk/auth/signup

Β 

For further information on EnergyPathways visit www.energypathways.uk and @energy_pathways on X (formerly Twitter).

Β 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

Β 

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
UPDUPUGGCUPAUBW
12
Date   Source Headline
1st Jul 20267:00 amRNSLicence Award; Ofgem LDES cap and floor 2nd Round
30th Jun 20267:00 amRNSFinal Results and Notice of AGM
2nd Jun 20264:52 pmRNSFinancing Agreement Drawdown for MESH Project
29th May 202611:09 amRNSTotal Voting Rights
28th May 20267:00 amRNSAppointment of Independent Non-Executive Director
26th May 20268:34 amRNS-RAppointment of Chief Scientific Adviser
22nd May 202611:22 amRNSDirector/PDMR Shareholding
22nd May 20269:38 amRNSIssue of Deferred Remuneration Shares-Subscription
13th May 20267:00 amRNSAgreement with ABP to locate MESH facilities
11th May 20265:54 pmRNSConversion of Loan and Issue of Shares
7th May 20262:49 pmRNSIssue of Fee Shares
6th May 20267:00 amRNSNSTA decision to offer Gas Storage Licence
30th Apr 20265:32 pmRNSDrawdown of £1m Finance and Issue of ATM Shares
28th Apr 20264:27 pmRNSTR-1: Notification of major holdings
28th Apr 20268:22 amRNSCAES Project Update & £15m Financing Agreement
27th Apr 20267:00 amRNSStudy shortlists sites for MESH onshore facilities
27th Feb 20268:00 amRNSTotal Voting Rights
5th Feb 20264:10 pmRNSIssue of Fee Shares
31st Dec 20259:00 amRNSTotal Voting Rights
31st Dec 20259:00 amRNSTotal Voting Rights
3rd Dec 20253:13 pmRNSIssue of Fee Shares
24th Nov 20257:00 amRNSExpanded Gas Storage Licence Application
19th Nov 20257:00 amRNSCooperation Agreement with Siemens Energy
13th Nov 20257:00 amRNSEnergyPathways Partners with KBR & Hazer
3rd Nov 20252:24 pmRNSTotal Voting Rights
23rd Oct 20252:12 pmRNS-REnergyPathways joins the CMA (UK)
22nd Oct 202511:00 amRNSSecures a First-Mover Advantage in UK Graphite
20th Oct 20257:00 amRNSMESH storage licence applications to be submitted
14th Oct 202512:28 pmRNSAdditional Fundraise
13th Oct 20258:07 amRNSPlacing and Subscription to raise £1,238,000
3rd Oct 202512:05 pmRNSExercise of warrants
29th Sep 20257:00 amRNSMESH confirmed as project of national significance
26th Sep 202511:53 amRNSUpdate re s35 Application
26th Sep 20257:00 amRNSResults for the half year ended 30 June 2025
14th Aug 20258:15 amRNSMESH Update
4th Aug 20258:15 amRNSIssue of fee shares
31st Jul 202511:26 amRNSResult of AGM
29th Jul 20257:00 amRNSPlacing and Subscription
24th Jul 20257:00 amRNSCostain engaged for MESH onshore facility study
21st Jul 202511:54 amRNSEnergyPathways Engages Siemens Energy for MESH
15th Jul 20257:00 amRNSMOU for clean hydrogen development facility
30th Jun 20257:00 amRNSAnnual Results and Notice of AGM
20th Jun 20253:45 pmRNS-RNew Corporate Presentation
9th Jun 202510:17 amRNSMESH - Contract Award
4th Jun 20257:00 amRNSIssue of fee shares
29th May 20257:10 amRNSMESH Update
30th Apr 20258:00 amRNSTotal Voting Rights
16th Apr 20254:52 pmRNSSubscription by Existing Shareholders & Directors
7th Apr 20252:32 pmRNSIssue of Equity
3rd Apr 202511:00 amRNSGovernment update on Climate Change Levy
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.