Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.495
Bid: 0.40
Ask: 0.59
Change: 0.00 (0.00%)
Spread: 0.19 (47.50%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.495
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling update at Jade prospect

13 Apr 2022 07:43

RNS Number : 2434I
Empyrean Energy PLC
13 April 2022
 

This announcement contains inside information

 

Empyrean Energy Plc / Index: AIM / Epic: EME / Sector: Oil & Gas

 

Empyrean Energy plc

 

Block 29/11, China - Drilling update at Jade prospect

 

13 April 2022

 

Empyrean Energy plc ("Empyrean" or the "Company"), the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide the following update on drilling commencement on the Jade prospect at its 100% owned Block 29/11 permit, offshore China:

 

HIGHLIGHTS

 

· LH 17-2-1 well at the Jade prospect drilled 17-1/2" section to 1056 metres Measured Depth

· Current operations are installation of the 13-3/8" casing

· Once the 13-3/8" casing is set the Blow Out Preventer ("BOP") will be installed and tested before drilling ahead to the next casing point at 2140 metres Measured Depth

 

 

Empyrean is the operator of Block 29/11 in China and has 100% working interest during the exploration phase. In the event of a commercial discovery, its partner, China National Offshore Oil Company ("CNOOC"), may assume a 51% participating interest in the development and production phase.

 

Progress

 

The NH9 Semisubmersible drilling rig made excellent progress at LH 17-2-1 with the drilling of the

17-1/2" hole down to 1056 metres Measured Depth ("MD"), and current operations are preparation for running 13-3/8" casing.

Forward plan

 

Following the setting of the 13-3/8" casing, the 12 -1/4" hole will be drilled down to 2140 metres

MD.

 

After setting the 9 ⅝" casing, the rig will drill ahead in the 8 ½" hole section through to Total Depth at 2860 metres MD.

Well Objective

The 2021 drilling campaign is targeting a world class conventional oil target in the Jade Prospect, to which Gaffney Cline & Associates ("GCA") assigned a Geological Chance of Success ("GCoS") of 32%. Subsequent to this independent assessment, the Company completed a gas cloud study and post stack seismic inversion study that it believes further mitigates risk and increases the GCoS to 41%.

The Jade Prospect has a GCA audited mean in place potential of 225 MMbbl and a P10 in place upside of 395 MMbbl. Four recent nearby discoveries by CNOOC immediately to the West of the Jade Prospect are filled to their P10 potential or better. All four CNOOC discoveries have gas clouds showing in the overburden on seismic.

Empyrean's excellent quality 3D seismic indicates that there is a classic "fill to spill" geological setup in the basin, and a robust regional seal, that provides the Jade and Topaz Prospects with a very real possibility of being filled in a similar fashion to nearby discoveries. The Jade and Topaz prospects both have gas clouds, similar to nearby discoveries, in the overburden on 3D seismic. Dry wells nearby do not have gas clouds. The Jade Prospect is the first of the three identified prospects within Block 29/11, which also contains the Topaz and Pearl prospects. The combined audited mean in place potential of all three prospects is 884 MMbbl and a P10 in place upside of 1,588 MMbbl. The post stack seismic inversion study showed Jade and Topaz both have the potential for excellent carbonate buildup reservoir quality with excellent porosity and permeability. Any oil discovered is expected to be light oil in the 38-41 API range, similar to nearby discoveries. These attributes combined with the potential for exceptional natural reservoir drive supports the potential for excellent recovery rates.

The objective of the Jade well is to test for hydrocarbons down to TD of 2860 metres MD.

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 31 years' experience as a hydrocarbon geologist and geoscientist.

Empyrean CEO, Tom Kelly, stated:

"Drilling operations continue to run smoothly and safely, with progress to date right on schedule".

 

For further information please contact the following:

 

Empyrean Energy plc

Tom Kelly

Tel: +61 6146 5325

Cenkos Securities plc (Nominated Advisor and Broker)

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

First Equity Limited (Joint Broker)

Jason Robertson

Tel: +44 (0) 20 7330 1883

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLUOSNRUAUSARR
Date   Source Headline
7th Mar 20228:03 amRNSBlock 29/11, China - Jade drilling update
24th Jan 20227:15 amRNSCyber Fraud Update
10th Jan 20227:00 amRNSJade drilling operational status
23rd Dec 20217:00 amRNSInterim Results
16th Dec 20214:41 pmRNSSecond Price Monitoring Extn
16th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20211:07 pmRNSEmpyrean raises £7.623 million
15th Nov 20217:25 amRNSExercise of 12p Warrants
12th Nov 20217:49 amRNSExercise of 12p Warrants
11th Nov 20217:34 amRNSDrilling Contract Executed for Jade Prospect
3rd Nov 20217:00 amRNSOperations update Jade prospect drilling
26th Oct 20217:00 amRNSExercise of 12p Warrants
21st Oct 202110:00 amRNSExtension to Exercise Period for Placing Warrants
20th Oct 20217:08 amRNSExercise of 12p Warrants
19th Oct 20217:05 amRNSExercise of 12p Warrants
14th Oct 20217:05 amRNSExercise of 12p Warrants
13th Oct 20217:00 amRNSExercise of 12p Warrants
12th Oct 20219:00 amRNSExercise of 12p Warrants
11th Oct 20212:06 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
6th Oct 202110:22 amRNSExercise of 12p Warrants
5th Oct 20217:00 amRNSJade prospect - Well site survey contract awarded
23rd Sep 202111:00 amRNSResults of Annual General Meeting
23rd Sep 20219:50 amRNSAGM Company Presentation
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.