If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.06    0.00 (0.00%)
Bid:
0.055
Ask:
0.065
Spread: 0.01 (18.182%)
Market Cap: £3.43m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

13 Jan 2006 08:55

Empyrean Energy PLC13 January 2006 13 January 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling commences at the Eagle North-1 appraisal well, Eagle Oil Pool Development Project, San Joaquin Basin, California, USA AIM quoted Empyrean Energy PLC today announces commencement of drilling at theEagle North-1 well. The Eagle North-1 well which is to be drilled adjacent to a previous discoverywell for oil and associated gas is expected to take approximately 14 days toreach maximum depth in the vertical stage. Empyrean has the right to earn a38.5% working interest in the Eagle Oil Pool Development Project.. The San Joaquin Basin in southern California is a proven oil and gas field thathas produced in excess of 12 billion barrels of oil and 11 trillion cubic feetof gas. An independent expert has estimated that the Eagle Oil Pool DevelopmentProject could contain a P50 (probability 50% unrisked) reserve of 7.1 millionbarrels of recoverable oil and 12.3 billion cubic feet of associated gas, withthe P10 assessment estimated at 22.7 million barrels of oil and 22.7 billioncubic feet of associated gas. The Project is a structural-stratigraphic trapplay targeting the Eocene aged Gatchell Sand formation. Victoria Petroleum USA Inc, a wholly owned subsidiary of ASX listed VictoriaPetroleum NL (ASX CODE VPE) is the operator for the Eagle North-1 well. Theinitial phase will take approximately 14 days to complete and following initialsuccess the casing and production testing of the well will commence. If thevertical stage above proves successful the particpant's intend to complete ahorizontal production well in an attempt to enhance recovery rates The Eagle North-1 appraisal well will be drilled approximately 300 metresnorthwest of the Eagle-1 surface location and vertically drilled to its targetdepth of 4,200 metres. Upon confirmation of the presence of oil in the targetGatchell Sandstone the well will be cased and production tested for five days. A300 metre horizontal lateral well will then be drilled and completed forproduction in the target Gatchell Sandstone oil reservoir. In the event of asuccessful horizontal well completion, the Operator anticipates flow rates of upto 1000 barrels of oil per day . Commenting on the agreement today Empyrean executive director Chris Lambertsaid: "Energy demand and prices in California have continued to remain strongand Empyrean is very well placed to capitalise on these fundamentals should theEagle-North-1 well meet our expectations". For further information including full farm-in details for the Eagle Oil PoolDevelopment Project Laurence Read/Amanda Harris David Newton Chris LambertConduit PR HB-Corporate Empyrean Energy plcTel: +44 (0) 207 618 8760 Tel: +44(0) 207 510 8600 Tel : +44(0) 207 932 2442Mob: +44 (0) 7979 955 923 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Jul 20157:00 amRNSMAJOR UPGRADE TO SUGARLOAF AMI RESERVES
5th Jun 20153:31 pmRNSHolding(s) in Company
21st May 20157:50 amRNSQ1 2015 Production Update from Sugarloaf AMI
27th Apr 201512:45 pmRNSHolding(s) in Company
8th Apr 201510:45 amRNSHedging contracts with Macquarie Bank Limited
1st Apr 20159:15 amRNSMacquarie Bank Facility Re-finance and drawdown
26th Mar 20158:00 amRNSQ4 2014 Production from Sugarloaf AMI, Texas
2nd Mar 20159:42 amRNSCorrection: Exercise of Options
2nd Mar 20159:15 amRNSExercise of Options
4th Feb 20159:53 amRNSForm 8.5 (EPT/NON-RI)
4th Feb 20157:50 amRNSUpdate on Strategic Review; Termination of FSP
30th Jan 20159:09 amRNSForm 8.5 (EPT/NON-RI)
28th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
27th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
26th Jan 20159:08 amRNSForm 8.5 (EPT/NON-RI)
23rd Jan 20151:27 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Jan 201510:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Jan 20159:47 amRNSForm 8.5 (EPT/NON-RI)
21st Jan 20159:15 amRNSForm 8.5 (EPT/NON-RI)
20th Jan 20159:37 amRNSForm 8.5 (EPT/NON-RI)
16th Jan 20151:52 pmRNSForm 8.3 - Empyrean Energy PLC
16th Jan 201511:54 amRNSForm 8.5 (EPT/NON-RI)
15th Jan 20159:45 amRNSForm 8.5 (EPT/NON-RI)
14th Jan 20156:29 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20155:27 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20154:47 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20159:26 amRNSForm 8.5 (EPT/NON-RI)
13th Jan 20159:56 amRNSForm 8.5 (EPT/NON-RI)
12th Jan 20155:19 pmRNSForm 8.3 - Empyrean Energy PLC
12th Jan 20159:28 amRNSForm 8.5 (EPT/NON-RI)
9th Jan 20159:49 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20153:49 pmRNSForm 8.3 - Empyrean Energy PLC
8th Jan 20159:25 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20157:00 amRNSRepays USD 2m of Macquarie Facility
7th Jan 20159:13 amRNSForm 8.5 (EPT/NON-RI)
6th Jan 201510:10 amRNSForm 8.5 (EPT/NON-RI)
30th Dec 20147:40 amRNSInterim Results
23rd Dec 201412:33 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Dec 201410:07 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 201411:25 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 20147:00 amBUSForm 8.3 - Empyrean Energy plc
18th Dec 201410:32 amRNSForm 8.3 - Empyrean Energy PLC
17th Dec 201410:43 amRNSForm 8.5 (EPT/NON-RI)
15th Dec 201410:34 amRNSForm 8.5 (EPT/NON-RI)
12th Dec 20149:13 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 201410:00 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 20148:30 amRNSQ3 2014 Production from Sugarloaf AMI, Texas
10th Dec 201411:29 amRNSForm 8.5 (EPT/NON-RI)
9th Dec 201410:42 amRNSForm 8.3 - Empyrean Energy PLC
5th Dec 201412:16 pmRNSForm 8.3 - Empyrean Energy PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.