Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0675    -0.005 (-6.90%)
Bid:
0.065
Ask:
0.07
Spread: 0.005 (7.692%)
Market Cap: £3.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

27 Apr 2006 08:23

Empyrean Energy PLC27 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update • Further oil shows encountered whilst drilling at Eagle North-1 in California, USA. • Increased total gas reading associated with the oil shows. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the EagleNorth-1 horizontal well in the Eagle Oil Pool Development Project in the SanJoaquin Basin advises that at 1830 hours Central Pacific Time 26 April 2006, thecurrent operation at Eagle North-1 horizontal well was preparing to drill aheadin 4 1/8 inch hole in the horizontal well bore at 4,308 metres (14,132 feet)measured depth (md kb) in the lower Mary Bellocchi Gatchell oil sand afterencountering further good oil shows in the target sand from 4,297 metres (14,097feet) to current depth of 4,308 metres (14,132 feet). The well bore is currentlyat an angle of 89.7 degrees from the vertical. The operator has advised that the oil show in the target sands was accompaniedby the inflow of oil into the well bore on a flow check as seen from good yellowoil fluorescence in the oil cut drilling mud and an increase in total gas from abackground of 2 units to a maximun of 550 units with associated heavierhydrocarbons. The operator has also advised that the increase in drill rate from 8 ft/hr to 70ft /hr indicates friable and porous sand at this vertical depth of 13,622ft TVDKB. The forward plan is to increase the drilling mud weight (depending on formationproperties encountered) and drill ahead in the target Gatchell oil sand over adistance of approximately 320 metres until the planned measured depth of 4,600metres (15,090 feet) is reached. As planned the horizontal well bore will then be completed for productiontesting with a 2 7/8 inch slotted production liner. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "We are again pleased to see this typeof oil show, with associated total gas increases, prior to reaching our plannedtotal measured depth and setting production liner." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus PrenticeConduit PR Tel: +44 (0) 207 429 6603 Mob: +44 (0) 7974 982 512 Toby HowellHB-CorporateTel: +44(0) 207 510 8600 Empyrean Energy plcTel : +44(0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Apr 20107:42 amRNSSugarloaf Project Block B Update
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.