Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.45
Bid: 0.40
Ask: 0.50
Change: -0.045 (-9.09%)
Spread: 0.10 (25.00%)
Open: 0.495
High: 0.00
Low: 0.00
Prev. Close: 0.495
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling commences at Jade prospect

11 Apr 2022 07:00

RNS Number : 9273H
Empyrean Energy PLC
11 April 2022
 

This announcement contains inside information

 

Empyrean Energy Plc / Index: AIM / Epic: EME / Sector: Oil & Gas

 

Empyrean Energy plc

 

Block 29/11, China - Drilling commences at Jade prospect

 

11 April 2022

 

Empyrean Energy plc ("Empyrean" or the "Company"), the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide the following update on drilling the Jade prospect at its 100% owned Block 29/11 permit, offshore China:

 

HIGHLIGHTS

 

· LH 17-2-1 well spudded on Jade prospect at 19:30 on 10 April 2022

· 36" surface hole was drilled down to 588 metres Measured Depth ("MD")

· Current operations are installation of the 30" surface conductor

 

 

Empyrean is the operator of Block 29/11 in China and has 100% working interest during the exploration phase. In the event of a commercial discovery, its partner, China National Offshore Oil Company ("CNOOC"), may assume a 51% participating interest in the development and production phase.

 

Empyrean is pleased to announce that drilling has commenced at the LH 17-2-1 well on Jade prospect at 19:30 on 10 April 2022.

 

Progress

 

The NH9 Semisubmersible drilling rig has commenced operations at LH 17-2-1 with the drilling of the 36" surface hole down to 588 metres Measured Depth ("MD"), and current operations are installation of the 30" surface conductor.

 

Forward plan

 

Following the setting of the surface conductor, the 17 ½" hole will be drilled down to 1050 metres MD and the 13 ⅝" casing will be set and cemented in place. The rig will then drill ahead in 12 ¼" hole to approximately 2140 metres MD before setting the 9 ⅝" casing.

 

After setting the 9 ⅝" casing, the rig will drill ahead in the 8 ½" hole section through to the expected Total Depth ("TD") of the well at 2860 metres MD.

 

During the drilling of the Jade well, we are conducting Logging While Drilling ("LWD") operations and should we encounter hydrocarbons in the main target zone we will run additional Combo Logs to confirm any oil pay zones. If an oil pay zone is confirmed then the plan is to carry out flow testing operations on the oil pay zones.

Well Objective

The 2021 drilling campaign is targeting a world class conventional oil target in the Jade Prospect, to which Gaffney Cline & Associates ("GCA") assigned a Geological Chance of Success ("GCoS") of 32%. Subsequent to this independent assessment, the Company completed a gas cloud study and post stack seismic inversion study that it believes further mitigates risk and increases the GCoS to 41%.

The Jade Prospect has a GCA audited mean in place potential of 225 MMbbl and a P10 in place upside of 395 MMbbl. Four recent nearby discoveries by CNOOC immediately to the West of the Jade Prospect are filled to their P10 potential or better. All four CNOOC discoveries have gas clouds showing in the overburden on seismic.

Empyrean's excellent quality 3D seismic indicates that there is a classic "fill to spill" geological setup in the basin, and a robust regional seal, that provides the Jade and Topaz Prospects with a very real possibility of being filled in a similar fashion to nearby discoveries. The Jade and Topaz prospects both have gas clouds, similar to nearby discoveries, in the overburden on 3D seismic. Dry wells nearby do not have gas clouds. The Jade Prospect is the first of the three identified prospects within Block 29/11, which also contains the Topaz and Pearl prospects. The combined audited mean in place potential of all three prospects is 884 MMbbl and a P10 in place upside of 1,588 MMbbl. The post stack seismic inversion study showed Jade and Topaz both have the potential for excellent carbonate buildup reservoir quality with excellent porosity and permeability. Any oil discovered is expected to be light oil in the 38-41 API range, similar to nearby discoveries. These attributes combined with the potential for exceptional natural reservoir drive supports the potential for excellent recovery rates.

The objective of drilling the Jade well is to test for hydrocarbons down to the TD of the well at 2860 metres MD.

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 31 years' experience as a hydrocarbon geologist and geoscientist.

Empyrean CEO, Tom Kelly, stated:

"Empyrean is delighted to inform shareholders that following successful anchoring operations at the Jade location we have spudded the Jade well over the weekend and drilled the first section of hole. The Empyrean, COSL and CNOOC EnerTech teams are working very well together to drill the well safely and achieve the objective."

 

For further information please contact the following:

 

Empyrean Energy plc

 

Tom Kelly

Tel: +61 6146 5325

 

 

 

 

Cenkos Securities plc (Nominated Advisor and Broker)

 

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

 

 

First Equity Limited (Joint Broker)

 

Jason Robertson

Tel: +44 (0) 20 7330 1883

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFIFVESIILLIF
Date   Source Headline
27th Jun 20147:30 amRNSProduction and Operational Update
25th Jun 20147:29 amRNSProduction and Operational Update
9th Jun 20144:04 pmRNSHolding(s) in Company
20th May 20147:00 amRNSMAJOR UPGRADE TO SUGARLOAF AMI RESERVES+RESOURCES
13th May 201412:05 pmRNSComment on Aurora Oil and Gas Announcement
1st Apr 20149:01 amRNSUSD1.5million reypayment on term debt facility
28th Mar 201412:13 pmRNSExercise of Options
20th Mar 201412:30 pmRNSOption Terms Amendment
7th Mar 20141:27 pmRNSMajor Interest in Shares
5th Mar 20147:00 amRNSNew Corporate Presentation
18th Feb 201410:02 amRNSAdmission of Ordinary Shares
12th Feb 20141:30 pmRNSExercise of Options
12th Feb 20147:00 amRNSProduction and Q4 2013 Operational Update
7th Feb 20147:06 amRNSComment on Aurora Oil & Gas Announcement
8th Jan 20147:00 amRNSUpdate re Macquarie Debt Facility
20th Dec 20137:54 amRNS3,512% increase in net profits to £2.384m
18th Dec 201310:45 amRNS2014 Drilling Guidance
13th Dec 20137:00 amRNSMarathon highlights Sugarloaf AMI uplift potential
15th Nov 201310:00 amRNSChange of Auditor
5th Nov 20137:00 amRNSProduction and Operational Update, Sugarloaf AMI
18th Oct 20137:00 amRNSChange of Adviser
3rd Oct 20138:39 amRNSPrincipal Office Change
30th Sep 20137:00 amRNSUSD1m Repayment on Macquarie Debt Facility
23rd Sep 20137:00 amRNSRecommences activity in Block A with Conoco, Texas
12th Sep 20138:00 amRNSSugarloaf: Marathon permit update
14th Aug 20132:22 pmRNSHolding(s) in Company
14th Aug 201311:45 amRNSExercise of Options
8th Aug 20138:15 amRNSAppointment of Public Relations Company
8th Aug 20137:45 amRNSSugarloaf: Marathon Update
2nd Aug 20138:30 amRNSSugarloaf: Hedging contract with Macquarie Bank
1st Aug 20138:15 amRNSSugarloaf - Production and Operational Update
26th Jul 20137:00 amRNSPrincipal Office Change
2nd Jul 20133:56 pmRNSResult of AGM and General Meeting
2nd Jul 20131:16 pmRNSAGM Presentation
2nd Jul 20137:00 amRNSFacility repayment
18th Jun 201311:02 amRNSHolding(s) in Company
14th Jun 201310:08 amRNSNotice of General Meeting
11th Jun 201312:35 pmRNSHolding(s) in Company
10th Jun 20138:35 amRNSInvestor presentation
3rd Jun 20131:13 pmRNSNotice of AGM
29th May 20138:30 amRNSOperations Update: Riverbend Project
15th May 20138:00 amRNSFinal Results
1st May 20134:52 pmRNSOperations Update
1st May 20137:30 amRNSOperational Update
30th Apr 20134:26 pmRNSOperational Update
19th Apr 20137:00 amRNSProduction and Operational Update
28th Mar 20137:02 amRNSDrawndown under Macquarie debt facility
25th Mar 20138:00 amRNSEagle Oil Pool Development Project
6th Mar 20138:30 amRNSOperational Update: Sugarloaf Project
26th Feb 20131:51 pmRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.