REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.25
Bid: 7.00
Ask: 7.50
Change: 0.00 (0.00%)
Spread: 0.50 (7.143%)
Open: 7.25
High: 7.25
Low: 7.25
Prev. Close: 7.25
EEE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant Resource Upgrade at Kvemo Bolnisi East

27 Jul 2017 07:00

RNS Number : 2202M
Georgian Mining Corporation
27 July 2017
 

27 July 2017

Georgian Mining Corporation

Significant Copper Resource Upgrade at Kvemo Bolnisi East

 

Georgian Mining Corporation ('GEO' or the "Company') is pleased to announce a 41% tonnage increase in the global In-Pit Optimised constrained copper-gold sulphide Mineral Resource for the Kvemo Bolnisi Project ('KB') to 1.7Mt @ 1.05% Cu from 1.2Mt @ 1.03% Cu.

 

This upgrade was based upon the recently discovered breccia pipe situated beneath the base of the gold oxide mineralisation at Gold Zone 2 ('GZ2'), one of three zones currently being developed at KB which may form one large epithermal copper-gold system. A three phase programme is underway to deliver a total resource in excess of 50Mt at KB, which is located in an established copper-gold region in Georgia along the highly prospective Tethyan Belt.

 

· Increased In-Pit optimised constrained copper-gold sulphide Mineral Resource of 1.7Mt @ 1.05% Cu (from 1.2Mt @ 1.03%) comprises:

 

 

Tonnage

(kt)

Average Grade

(% Cu)

Copper

(t)

Average Grade

(g/t Au)

Gold

(oz)

Indicated

101

0.45

 

0.50

 

Inferred

1,607

1.09

 

0.13

 

Total (Indicated & Inferred)

1,708

1.05

17,934

0.20

11,100

 

· The In-Pit constrained Mineral Resource has been derived from a global Mineral Resource estimated in accordance with the guidelines of the JORC Code (2012) of 3.154Mt @ 0.82% Cu & 0.14g/t Au (from 2.22Mt @ 0.8% Cu and 0.1 g/t Au )comprises:

 

 

Tonnage

(kt)

Average Grade

(% Cu)

Copper

(t)

Average Grade

(g/t Au)

Gold

(oz)

Indicated

101

0.50

 

0.50

 

Inferred

3,053

0.83

 

0.13

 

Total (Indicated & Inferred)

3,154

0.82

25,860

0.14

14,430

 

· The In-pit parameters to constrain the optimised Mineral Resource were produced in-house and are based on mining, haulage and processing costs provided by the Company's local partner, a 5% dilution factor, a production rate of 60Kt per month, a 10% discount rate and a long-term copper price of $6,000 per tonne of copper metal. The cut-off grades used are 0.3% Cu and 0.3g/t Au

 

· Upgraded Mineral Resource now includes two separate high-grade copper-gold breccia pipes at Copper Zone 1 ("CZ1") and GZ2 - See Image 1

 

· Significant scope for further upgrades to the Mineral Resource as the GZ2 pipe is close to surface, extends to a depth of 200m and remains open at depth - additional drilling to commence in the coming weeks. The CZ1 breccia pipe also remains open at depth.

 

GEO Managing Director Greg Kuenzel said, "Together with the initial Mineral Resource estimate of 2.29Mt @ 0.85g/t Au, including an optimised In-Pit Mineral Resource of 1.14Mt @ 1.10g/t Au, we recently announced for the gold oxide deposit at GZ2, the discovery of the new breccia pipe at GZ2 has pushed us closer to the Phase 2 target of a 5Mt optimised in-pit combined gold-copper Mineral Resource within the KB project area during 2017. The copper mineralisation is augmented by a gold 'kicker' that in some cases is as high as 0.5g/t Au which will also report to the final copper-gold concentrate as a credit and add significant value.

 

"The Company has allocated funds to test the depth extension of the two breccia pipes at GZ2 and CZ1, as the low to intermediate sulfidation epithermal environment that characterises Kvemo Bolnisi has the potential to "blow-out" at depth and contribute to a more substantial bulk tonnage copper-gold resource in line with the 50Mt being targeted by the Company. Further gold oxide and copper-gold sulphide targets are regularly being generated and, as previously announced, additional anomalies and drill targets have already been defined. These will be drilled during the current programme as we continue to expand the Kvemo Bolnisi Mineral Resource development strategy."

 

To view the press release with the illustrative diagram please use the following link:

http://www.rns-pdf.londonstockexchange.com/rns/2202M_-2017-7-26.pdf

 

 

Global Mineral Resource Estimate for Cu-Au Sulphide Mineralisation

(Estimated In accordance with the guidelines of the JORC Code (2012)

 

 

 

Indicated

Inferred

Indicated & Inferred

Zone

Cut-off

Tonnes (Kt)

Cu (%)

Au (g/t)

Tonnes (Kt)

Cu (%)

Au (g/t)

Tonnes (Kt)

Cu (%)

Au (g/t)

CZ1

0.3% Cu

-

-

-

2,226

0.77

0.10

2,226

0.77

0.10

GZ2

0.3% Cu

101

0.50

0.45

827

0.99

0.22

928

0.94

0.25

 

In-Pit Constrained Optimised Mineral Resources - Cu-Au Sulphide Mineralisation (In-house)

 

 

 

Indicated

Inferred

Indicated & Inferred

Zone

Cut-off

Tonnes (Kt)

Cu (%)

Au (g/t)

Tonnes (Kt)

Cu (%)

Au (g/t)

Tonnes (Kt)

Cu (%)

Au (g/t)

CZ1

0.3% Cu

-

-

-

956

1.17

0.13

956

1.17

0.13

GZ2

0.3% Cu

101

0.50

0.45

651

0.97

0.26

752

0.91

0.28

 

The optimised in-house input parameters are based on up to date unit costs provided to the Company relating to mining and haulage using recognised local contractors and both heap leach and flotation ore processing based on actual costs incurred in local plants. It has therefore been assumed that there will be no major capital items required in the budget. The detail of the unit costs and other parameters used in optimisation cannot be provided in detail as these remain confidential and the property of third parties. Other Input parameters include cut-offs of 0.3% Cu and 0.3g/t Au, long-term gold price of US$1,250 per oz Au, long-term copper price of US$6,000 per tonne metal, discount factor of 10% and an assumed production rate of 60ktpm. A conservative 45 degree pit slope angle has been used in all optimisation of pits.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Competent Person Statement

 

The information in this announcement that relates to Exploration Results is based on information compiled by James Royall, who is a Member of the Australian Institute of Geoscientists. James Royall has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and as a qualified person as defined in the Note for Mining and Oil & Gas Companies which form part of the AIM Rules for Companies. James Royall has reviewed this announcement and consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

 

The information in this announcement that relates to Mineral Resources or Ore Reserves is based on information compiled by Adam Wheeler, who is a fellow (FIMMM) of the Institute of Materials, Minerals and Mining and a registered Chartered Engineer (C. Eng and Eur. Ing) with the Engineering Council (UK) and reviewed by Mark Owen, BSc, MSc, MCSM, Chartered Geologist, a member of the European Federation of Geologists and a Fellow of the Geological Society. Both Mr Wheeler and Mr Owen have sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking, to qualify as Competent Persons as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mark Owen and Adam Wheeler have reviewed this announcement and consent to the inclusion in the announcement of the matters based on their information in the form and context in which it appears.

 

 

**ENDS**

 

For further information please visit www.georgianmining.com  or contact:

 

Greg Kuenzel

Georgian Mining Corporation

Company

Tel: 020 7907 9327

Ewan Leggat

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Damon Heath

Shard Capital Partners LLP

Joint Broker

Tel: 0207 186 9950

Frank Buhagiar

St Brides Partners Ltd

PR

Tel: 020 7236 1177

Susie Geliher

St Brides Partners Ltd

PR

Tel: 020 7236 1177

 

About Georgian Mining Corporation

Georgian Mining Corporation has 50% ownership and operational control of the Bolnisi Copper and Gold Project in Georgia, situated on the prolific Tethyan Belt, a well-known geological region and host to many high-grade copper-gold deposits and producing mines. The Bolnisi licence covers an area of over 860 sq km and has a 30-year mining licence with two advanced exploration projects; Kvemo Bolnisi and Tsitel Sopeli. These projects are nearby existing mining operations owned by the Company's supportive joint venture partner. Georgia has an established mining code and is a jurisdiction open to direct foreign investment.

 

The Company is developing the project in three phases:

· Phase 1: H1 2017 target to delineate a minimum of 1-2 Mt to support initial spare capacity (now achieved and exceeded)

· Phase 2: 2017 target to delineate a 3-5 Mt resource of combined copper-gold sulphide and gold oxide mineralisation (on target)

· Phase 3: Long term target - to delineate a resource of 50Mt+

 

Quality Assurance and Quality Control

Drill hole sampling consists of half core ranging from 0.5m to 1.5m in length that are prepared at an onsite preparation lab operated by the company's partner. Samples were analysed at ALS Global laboratory in Loughrea, Ireland. Gold concentrations determined by 50gm Fire assay (Au-AA26) and multi-element data by 4 acid digest ICP (ME-MS61) Over grade samples are analysed using ICP AES (OG-62). Field duplicates are collected and blanks and CRMs are routinely inserted to all batches at a suitable frequency.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLRFMLTMBBTBRR
Date   Source Headline
30th Sep 20137:00 amRNSDrilling Results from Rotgu¨lden
18th Sep 201312:00 pmRNSSite Visit, Presentation and General Update
16th Sep 20137:00 amRNSHigh Grade Initial Drill Results from Rotgulden
12th Sep 20137:00 amRNSPositive Soil Sampling, Schonberg, Austria
30th Aug 20137:00 amRNSFirst Hole Completed at Rotgulden
27th Aug 20137:00 amRNSCommencement of Drilling at Rotgulden Gold Project
12th Aug 20137:00 amRNSInterim Results
9th Aug 20137:00 amRNSMining Authorities Approve Drilling Programme
26th Jul 20137:00 amRNSPositive Operations Update, Rotgulden, Austria
20th Jun 20132:50 pmRNSResult of AGM
29th May 20137:00 amRNSPosting of R&A and Notice of AGM
23rd May 20137:00 amRNSFinal Results
15th May 20137:00 amRNSPositive Results from Assaying of Historical Core
1st May 20137:00 amPRN2013 Exploration Update
27th Feb 20137:00 amRNSHolding(s) in Company
13th Dec 20127:00 amRNSPositive Exploration Update, Rotgulden & Schonberg
1st Nov 20127:15 amRNSPositive Rotgulden Exploration Update
29th Oct 20127:30 amRNSChange of Broker
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
27th Sep 20127:00 amRNSInterim Results
18th Sep 20123:15 pmRNSHolding(s) in Company
10th Sep 20127:00 amRNSEM Survey Yields Multiple Gold Targets - Rotgulden
18th Jul 20127:00 amRNSPositive Update - Schonberg Precious Metal Project
5th Jul 20122:16 pmRNSHolding in Company
29th Jun 20121:59 pmRNSHolding in Company
28th Jun 201210:52 amRNSIssue of Equity & Directors' Shareholdings
31st May 20127:00 amRNSCommences Electromagnetic Campaign at Rotgülden
17th May 201211:30 amRNSResult of AGM
25th Apr 201210:30 amRNSNotice of AGM
19th Apr 20127:00 amRNSSchonberg - Positive Exploration Update
11th Apr 20127:00 amRNSBoard Restructuring
4th Apr 20127:00 amRNSAerial Geophysics Programme at Rotgulden
3rd Apr 20127:00 amRNSChange of Advisers
29th Mar 20127:00 amRNSFinal Results
9th Mar 20127:00 amRNSDual Listing on the Frankfurt Stock Exchange
17th Jan 20127:00 amPRNComplete Assay Results - Rotgülden Drilling Programme
5th Dec 20117:00 amRNSRaises Additional £70,000
2nd Dec 20112:15 pmRNSRaises £680,000 to Develop Austrian Portfolio
24th Nov 20119:20 amRNSSignificant Multi-Element Results - Rotgulden
18th Nov 20112:45 pmRNSAppointment of Joint Corporate Broker
13th Oct 20117:00 amRNSHigh Grade Initial Drilling Results, Rotgulden
11th Oct 20111:00 pmRNSHigh Grade Gold & Silver Mineralisation, Rotgulden
6th Oct 20117:00 amRNSSignificant Gold Mineralisation at Kliening
28th Sep 20117:00 amRNSPositive Update from Rotgulden, Austria
20th Sep 20117:00 amRNSBonanza Silver & Excellent Copper Result-Altenberg
14th Sep 20117:00 amRNSBonanza High Grade Gold Samples from Altenberg
13th Sep 20117:00 amPRNInterim Results
5th Sep 20117:00 amPRNSignificant Gold Mineralisation at Austrian Licences
18th Aug 201111:28 amPRNExploration Update re. Gold Projects in Austria

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.