The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.70
Bid: 7.50
Ask: 7.90
Change: 0.45 (6.21%)
Spread: 0.40 (5.333%)
Open: 7.25
High: 7.70
Low: 7.60
Prev. Close: 7.25
EEE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Results from Assaying of Historical Core

15 May 2013 07:00

RNS Number : 7159E
Noricum Gold Limited
15 May 2013
 



Click on, or paste, the following link into your web browser to view the associated PDF document:

http://www.rns-pdf.londonstockexchange.com/rns/7159E_-2013-5-14.pdf 

 

Noricum Gold Limited / EPIC: NMG / Sector: Natural Resources

15 May 2013

Noricum Gold Limited ('Noricum Gold' or 'the Company')

Positive Results from Assaying of Historical Core

 

Noricum Gold Limited, the Austrian focused gold exploration and development Company, is pleased to announce positive results from the assaying of historical un-sampled core from the previously producing mine at the Rotgulden Gold and Precious Metals Project.

 

Highlights

 

·; Assaying of historical core underpins prospectivity of Rotgulden project

·; Two historic drilling locations with high grade gold results including:

o Hole 2F: 4.60m @ 14.42 g/t gold ('Au'), 96.04 g/t silver ('Ag'), 0.25% copper ('Cu') from 0m

o Hole 2E: 1.30m @ 30.40 g/t Au, 476 g/t Ag, 0.29% Cu from 0.8m

o Hole 2B: 6.10m @ 5.16 g/t Au, 75.23 g/t Ag, 0.91% Cu from 0m

o Hole 1D: 7.30m @ 2.09 g/t Au, 5.23 g/t Ag, 0.13% Cu from 7.2m

·; Drilling confirmed that the sulphide mineralisation persists for 60m along strike and down dip (the capacity of the rig) and remains open both along strike and down dip

·; Results will assist in targeting resource drilling at Rotgulden which is fully funded

·; Further review of additional historical data underway

·; The previously producing mine is one of multiple targets along 8km of strike being developed by Noricum

 

Noricum Gold Managing Director Greg Kuenzel said, "These high grade results highlight the potential of Rotgulden and further confirm the prospectivity of this historic gold mine as we move towards resource drilling. The availability of historic data, such as that provided by these previously un-sampled drill cores, is invaluable as a cost effective exploration tool. In light of these new results, we are undertaking a complete review of the historical data to help provide better focus for the on-going exploration programme. The Company continues to make good progress across the entire licence area and we remain very comfortable with the way the project is developing. Being located in a mining friendly and politically stable jurisdiction, we believe we will deliver long term returns for our shareholders."

 

Rotgulden Gold Project

 

Noricum has completed a sampling programme of drilling conducted in 1990 where only 10% of the core was originally sampled, although considerably more contained massive and disseminated mineralisation anomalous in gold, silver and copper. The recent assaying programme was conducted to further increase confidence in the project in preparation for underground resource drilling.

 

Rotgülden Mine

 

In 1990, an underground diamond drilling programme was carried out by Erzbergbau Radhausberg GmbH to test the down dip and along strike potential of the known sulphide mineralisation at the Rotgülden mine. In total, 7 holes (for around 200 metres) were drilled down dip and 3 holes were drilled along strike from two drill positions; the pyrrhotite cavern and the chalcopyrite cavern. The drilling depth capacity of the diamond drill rig was 60m.

 

This drilling confirmed that the sulphide mineralisation persists for at least 60m along strike and down dip. Due to the poor financial standing of Erzbergbau, detailed sampling and assaying was not completed on the drill core. Several samples were composited due to Erzbergbau's restricted budget.

 

A total of 104m was drilled from the pyrrhotite cavern with the deepest hole being 50.7m. Only 10m was sampled from this core although significantly more of the core was mineralised. The mineralisation in this part of the mine consists of massive sulphide ore which is dominated by pyrrhotite; also pyrite and arsenopyrite are common members of this paragenesis. Chalcopyrite and other phases are less abundant.

 

Figure 1: (Please see the associated PDF document at the top of the page)

 

A total of 95.6m was drilled from the chalcopyrite cavern, a total of 6 holes to depths of 40.1m, again only 10m was sampled from this core even though considerably more was mineralised. The massive sulphide mineralisation at the chalcopyrite cavern consists of various sulphides like pyrite, pyrrhotite, arsenopyrite and chalcopyrite. Assays of this ore type revealed bonanza high grade gold, silver and copper results. High precious metal grades are frequently associated with bismuth-bearing phases.

 

Previously only the massive chalcopyrite ore was sampled, but the Company has re-logged and sampled sections that were mineralised with gold, silver and copper mineralisation. For example, massive ore dominated by pyrrhotite, marble with stockwork-type sulphide mineralisation; and marble with disseminated sulphide mineralisation.

 

The recently completed 3D laser scan survey of the underground Rotgülden Mine, including the upper levels will be integrated with the Company's existing models to provide a more comprehensive picture of the mine and mineralisation. This data will also be integral in final drill placement for 2013 drill programmes.

 

The drill programmes are designed to define areas of massive sulphide mineralisation that have been detected by EM programmes, geological mapping and sampling in the areas just above the main level and to depths of around 50 to 100m.

 

Table of Intercepts

 

Hole_ID

mFrom

IntervalWidth

Au_ppm

Ag_ppm

Cu_%

2E

0.8

1.3

30.4

476

0.29

2F

0

4.6

14.42

96.04

0.25

2B

0

6.1

5.16

75.23

0.91

2E

4.6

0.8

2.67

52

0.20

2D

0

2

2.43

66.43

3.04

1D

7.2

7.3

2.09

5.23

0.13

1C

0

8.3

1.71

21.14

0.13

1C

11.6

9.3

1.52

19.86

0.11

2B

8.9

11.4

1.31

29.25

0.23

2D

21.5

6.5

1.27

17.53

0.12

2C

0.35

2.15

1.24

17.47

0.23

1B

5.2

1.5

1.16

7

0.07

2C

7

10.5

1.06

15.16

0.18

1D

34

8.2

0.96

14.76

0.09

1B

1.4

0.5

0.92

14

0.18

2A

1.5

0.5

0.88

22

0.22

1D

0

3.7

0.68

8.7

0.12

2D

14.5

2

0.57

19

0.12

1A

0

1.6

0.54

12

0.18

1A

5.1

1.6

0.54

5

0.04

2E

0.8

1.3

30.4

476

0.29

2F

0

4.6

14.42

96.04

0.25

 

Competent Person

The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Jeremy Whybrow, who is a Member of The Australasian Institute of Mining and Metallurgy.

 

Jeremy Whybrow is a director of the Company.

 

Jeremy Whybrow has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Jeremy Whybrow has reviewed this announcement and consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

 

**ENDS**

 

For further information please visit www.noricumgold.com or contact:

 

Greg Kuenzel

Noricum Gold Limited

Company

Tel: 020 3326 1726

Ewan Leggat

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3463 2279

Laura Littley

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3463 2279

Elisabeth Cowell

St Brides Media & Finance Ltd

PR

Tel: 020 7236 1177

Frank Buhagiar

St Brides Media & Finance Ltd

PR

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUSANROAAVAAR
Date   Source Headline
26th Apr 20247:00 amRNSStavely Project Update
25th Apr 20247:00 amRNSDrill Results Confirm Widespread High-Grade TiO2
18th Apr 20247:00 amRNSDrilling Successfully Completed at Pitfield
17th Apr 20247:00 amRNSPitfield Project JV to Include All Minerals
27th Mar 20247:00 amRNSPitfield Development Plan
13th Mar 20247:00 amRNSInvestor Presentation
5th Mar 202412:00 pmRNSUpdated Corporate Presentation
5th Mar 20247:00 amRNSFavourable Metallurgical Characteristics Confirmed
29th Feb 20247:00 amRNSDiamond Drilling to Commence & Grant of Options
23rd Feb 20247:00 amRNSRationalisation of Portfolio
6th Feb 20247:00 amRNSAppointment of Process Development Manager
5th Feb 20247:00 amRNSResource and Metallurgical Drilling to Commence
31st Jan 20247:00 amRNSHolding(s) in Company
29th Jan 20243:17 pmRNSDirector/PDMR Shareholding
22nd Jan 20247:01 amRNSExtensive, Shallow High-Grade Bedded Ti Confirmed
22nd Jan 20247:00 amRNSSaudi Strategic Investor Led Placing to Raise £3m
27th Dec 20232:40 pmRNSExercise of Options & Issue of Equity
19th Dec 20237:00 amRNSDrill Results: Additional High-Grade Titanium
8th Dec 20232:36 pmRNSExercise of Options & Issue of Equity
29th Nov 20233:32 pmRNSExercise of Warrants & Issue of Equity
29th Nov 20237:25 amRNSGrant of Options
29th Nov 20237:00 amRNSHighest Grade Results Reported To Date At Pitfield
20th Nov 20237:00 amRNSThick, High Grade Ti Mineralisation Intercepted
13th Nov 20237:00 amRNSExtensive Ti Mineralisation Across Giant System
6th Nov 20237:00 amRNSEmpire to Attend the 121 Mining Conference
1st Nov 20232:48 pmRNSTR1 Notification of Major Holding
30th Oct 20237:00 amRNSEmpire Presenting At IMARC 2023
25th Oct 20237:56 amRNSDiamond Drilling Update at Pitfield
29th Sep 20237:00 amRNSInterim Results
25th Sep 20237:00 amRNS£3m Placing to Expand Exploration at Pitfield
13th Sep 20237:00 amRNSDrilling to Commence at Pitfield Project
29th Aug 20237:00 amRNSPotential for Higher Grade Titanium at Pitfield
15th Aug 20231:43 pmRNSExercise of Warrants & Issue of Equity
2nd Aug 20237:00 amRNSAirborne Gravity Survey Completed at Pitfield
11th Jul 20237:00 amRNSIlmenite Confirmed as Key Titanium Mineral
5th Jul 20231:38 pmRNSHolding(s) in Company
3rd Jul 20237:00 amRNSHigh-Grade TiO2 Over Entire 40km System - Pitfield
19th Jun 20237:00 amRNSFinal Results
30th May 20237:00 amRNSGiant Cu & Ti Mineral System Confirmed at Pitfield
27th Apr 202310:22 amRNSExercise of Warrants & Issue of Equity
26th Apr 20237:00 amRNSExploration Licence Granted for the Walton Project
24th Apr 20237:00 amRNSCompletion of Maiden Drilling Campaign at Pitfield
23rd Mar 20237:01 amRNSGrant of Options
23rd Mar 20237:00 amRNSMaiden Drilling Campaign at the Pitfield Project
16th Mar 20237:00 amRNSCompany Presentation
13th Mar 202311:30 amRNSPlacing to Raise £1.25M to Accelerate Exploration
10th Mar 202312:15 pmRNSHolding(s) in Company
1st Mar 20238:25 amRNSEx-Rio Tinto Geologist joins Empire Metals
27th Feb 20237:00 amRNSExtensive Kaolin Mineralisation Identified
24th Feb 20232:05 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.