Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Re: Drilling Programme

10 Nov 2005 07:00

Egdon Resources PLC10 November 2005 10 November 2005 For immediate release EGDON RESOURCES PLC Commencement of UK Onshore Drilling Programme Egdon Resources Plc ("Egdon" or "the Company") is pleased to advise that theBDF28 drilling rig is scheduled to mobilise to the Waddock Cross-3 well site inDorset on Monday 14 November with drilling operations expected to commence on oraround 16 November. The rig is owned and operated by British Drilling andFreezing Limited ("BDF"). Waddock Cross-3 will be the first of a four or five well operated drillingprogramme in the onshore UK. Drilling will target an elevated part of theWaddock Cross oil accumulation identified by the recent 3D seismic survey. A600 m horizontal section will be drilled and completed through the reservoir.The well will be 1525m in length and take an estimated 25 days to drill.Following drilling and completion operations the rig will be moved off site andthe well will be put on an extended well test ('EWT') using a pump-jack ('nodding donkey'). In addition the Company holds an option with BDF to drill afurther horizontal appraisal well at Waddock Cross at the end of the currentprogramme. The second well in the drilling programme, Kirkleatham-4, is due to be drilledimmediately following the Waddock Cross-3 well during December 2005. TheKirkleatham prospect is located beneath and to the west of the town of Redcar inCleveland. The structure was originally tested by two wells in the mid 1940s,with testing producing sub-commercial gas-flows in both wells from Permian ageZechstein carbonates. Seismic data shows the potential to apply modern drillingand completion techniques up-dip of both wells. The Kirkleatham-4 explorationwell will test for the presence of an effective gas reservoir in this up-diparea of the structure. Kirkleatham-4 will be drilled as a vertical well to aprognosed depth of 900 m and is anticipated to take 15 days to drill. The third well in the programme will be the Westerdale-1 exploration well in theNorth Yorkshire Moors. Westerdale-1 is designed to test an accumulation 50.5 mupdip and 3.7 km to the north of the Ralph Cross-1 gas discovery made by HomeOil Limited in 1966. Ralph Cross-1 tested gas at flow rates of up to 6 MMcfgdfrom a 20.5 m gas column in fractured Zechstein carbonates. The PEDL068 groupbelieves that better positioning, completion and management of a well within theprospect could produce a significant and sustainable commercial gas flow.Additional reservoir objectives are present in the Westerdale-1 well both withinthe Zechstein and in the underlying Carboniferous sequences. Westerdale-1 willbe directionally drilled to a total depth of around 1250 m and will take around21 days to drill. The Portland-1 borehole, for which planning consent has now been received, willbe drilled as the fourth well in the programme to a depth of around 2500 m.Drilling, coring and testing operations are expected to take around 50 days.Data from the well will enable the determination of the thickness andsuitability of the salt interval to create caverns at the proposed Portland GasStorage Project. Commenting on the forthcoming drilling activity, Egdon's Joint ManagingDirector, Mark Abbott, said, "This, our first multi-well drilling programme,represents the culmination of many years of exploration work by the Company.The 'back-to-back' nature of the programme has resulted in significant overallcost savings on materials, equipment and services. We look forward to an activeand exciting period with the hope of continuing the Company's record ofdrill-bit success". For further information please contact: Egdon Resources Plc 01256 702292Mark Abbott, Joint Managing DirectorAndrew Hindle, Joint Managing Director Buchanan Communications 020 7466 5000Eric BurnsBen Willey Notes to the Editors: The wells within the outlined Egdon operated drilling programme are locatedwithin the PL090 licence (Waddock Cross-3, Waddock Cross-4) in the Wessex Basinwhere the Company holds a 45% working interest and the PEDL068 licence(Kirkleatham-4, Westerdale-1) in the Cleveland Basin where the Company holds a20% working interest but is carried for 10% of the first well, Kirkleatham-4,and also holds an option to increase its interest to 25%. The Portland-1 gasstorage confirmation well will be drilled by Egdon from a site leased by itswholly owned subsidiary, Portland Gas Limited. Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon was formed in 1997 by Dr Andrew Hindle and Mark Abbott. In December 2004,Egdon's shares commenced trading on AIM, having been previously traded on Ofexsince July 2000. The Company is developing two major business areas; an oil andgas exploration and production business which has a portfolio of twentyexploration licences containing identified oil and gas prospects ranging fromdiscoveries under appraisal through to higher risk but higher reward "wild cat"exploration prospects; and a gas storage business initially focused on thedevelopment of a salt cavern gas storage facility on the Isle of Portland,Dorset. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Feb 20158:14 amRNSCommencement of Drilling Operations at Kiln Lane-1
19th Feb 20157:00 amRNSUpdate on Wressle-1 Well Testing
9th Feb 20157:00 amRNSUpdate on Wressle-1 Well Testing
2nd Feb 20157:00 amRNSSale of Licence Interests to UK Oil & Gas
12th Dec 201412:13 pmRNSResults of Annual General Meeting
10th Dec 201412:46 pmRNSDirectors' Share Dealings
9th Dec 20147:00 amRNSPlanning Permission granted: North Kelsey-1 Well
4th Dec 20147:00 amRNSUpdate on Timing of Wressle-1 Well Testing
4th Dec 20147:00 amRNSExploration Option and Farm-in
2nd Dec 20147:00 amRNSAcquisition of Yorkshire Exploration Ltd
14th Nov 20147:00 amRNSAcquisition of Yorkshire Exploration Limited
11th Nov 20147:00 amRNSFinal Results for the Year Ended 31 July 2014
30th Oct 201410:04 amRNSCompletion of drilling - Burton on the Wolds-1
22nd Oct 20144:01 pmRNSPlanning approval granted for Kiln Lane Well
21st Oct 20147:00 amRNSCommencement of drilling - Burton on the Wolds-1
20th Oct 20147:00 amRNSOperations Update and Notice of Final Results
18th Sep 20147:00 amRNSBurton on the Wolds-1 well timing update
2nd Sep 20147:00 amRNSPreliminary Results of the Wressle-1 Well
21st Jul 20147:00 amRNSCommencement of drilling operations
30th Jun 20145:46 pmRNSHoldings in Company
27th Jun 20147:00 amRNSAppointment of Non-Executive Director
23rd Jun 201411:18 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
19th Jun 201412:10 pmRNSFavourable Holmwood Court of Appeal Decision
13th Jun 20143:05 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Jun 20147:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th Jun 20145:01 pmRNSApproval of transfer of onshore shale gas business
10th Jun 20145:00 pmRNSUpdate on transfer of onshore shale gas business
5th Jun 201412:01 pmRNSResult of Egdon Resources General Meeting
5th Jun 201412:00 pmRNSResult of Extraordinary General Meeting
5th Jun 201411:01 amRNSUpdate on transfer of onshore shale gas business
5th Jun 201411:00 amRNSUpdate on transfer of onshore shale gas business
3rd Jun 20142:01 pmRNSResult of Open Offer
2nd Jun 201412:04 pmRNSPEDL201
29th May 201411:01 amRNSPEDL 180 and PEDL 201
23rd May 201412:53 pmRNSIssue of Equity and Total Voting Rights
14th May 20147:00 amRNSGrant of Options to Directors
13th May 20147:00 amRNSAlkane Transaction, Placing and Open Offer
13th May 20147:00 amRNSTransfer of onshore shale gas business
12th May 201410:30 amRNSRestoration - Egdon Resources Plc
12th May 201410:20 amRNSPress comment
12th May 201410:20 amRNSPress comment
12th May 20147:58 amRNSSuspension - Egdon Resources plc
6th May 20146:10 pmRNSHolding(s) in Company
25th Apr 20147:00 amRNSInterim Results
25th Apr 20147:00 amRNSIndependent Gas in Place Estimates
16th Apr 20142:00 pmRNSAppointment of Joint Broker
31st Mar 20147:31 amRNSCompletion of 3D seismic PEDL139/140
12th Mar 20145:33 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Feb 20144:01 pmRNSIssue of Equity and Total Voting Rights
20th Feb 20143:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.