Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Re: Drilling Programme

10 Nov 2005 07:00

Egdon Resources PLC10 November 2005 10 November 2005 For immediate release EGDON RESOURCES PLC Commencement of UK Onshore Drilling Programme Egdon Resources Plc ("Egdon" or "the Company") is pleased to advise that theBDF28 drilling rig is scheduled to mobilise to the Waddock Cross-3 well site inDorset on Monday 14 November with drilling operations expected to commence on oraround 16 November. The rig is owned and operated by British Drilling andFreezing Limited ("BDF"). Waddock Cross-3 will be the first of a four or five well operated drillingprogramme in the onshore UK. Drilling will target an elevated part of theWaddock Cross oil accumulation identified by the recent 3D seismic survey. A600 m horizontal section will be drilled and completed through the reservoir.The well will be 1525m in length and take an estimated 25 days to drill.Following drilling and completion operations the rig will be moved off site andthe well will be put on an extended well test ('EWT') using a pump-jack ('nodding donkey'). In addition the Company holds an option with BDF to drill afurther horizontal appraisal well at Waddock Cross at the end of the currentprogramme. The second well in the drilling programme, Kirkleatham-4, is due to be drilledimmediately following the Waddock Cross-3 well during December 2005. TheKirkleatham prospect is located beneath and to the west of the town of Redcar inCleveland. The structure was originally tested by two wells in the mid 1940s,with testing producing sub-commercial gas-flows in both wells from Permian ageZechstein carbonates. Seismic data shows the potential to apply modern drillingand completion techniques up-dip of both wells. The Kirkleatham-4 explorationwell will test for the presence of an effective gas reservoir in this up-diparea of the structure. Kirkleatham-4 will be drilled as a vertical well to aprognosed depth of 900 m and is anticipated to take 15 days to drill. The third well in the programme will be the Westerdale-1 exploration well in theNorth Yorkshire Moors. Westerdale-1 is designed to test an accumulation 50.5 mupdip and 3.7 km to the north of the Ralph Cross-1 gas discovery made by HomeOil Limited in 1966. Ralph Cross-1 tested gas at flow rates of up to 6 MMcfgdfrom a 20.5 m gas column in fractured Zechstein carbonates. The PEDL068 groupbelieves that better positioning, completion and management of a well within theprospect could produce a significant and sustainable commercial gas flow.Additional reservoir objectives are present in the Westerdale-1 well both withinthe Zechstein and in the underlying Carboniferous sequences. Westerdale-1 willbe directionally drilled to a total depth of around 1250 m and will take around21 days to drill. The Portland-1 borehole, for which planning consent has now been received, willbe drilled as the fourth well in the programme to a depth of around 2500 m.Drilling, coring and testing operations are expected to take around 50 days.Data from the well will enable the determination of the thickness andsuitability of the salt interval to create caverns at the proposed Portland GasStorage Project. Commenting on the forthcoming drilling activity, Egdon's Joint ManagingDirector, Mark Abbott, said, "This, our first multi-well drilling programme,represents the culmination of many years of exploration work by the Company.The 'back-to-back' nature of the programme has resulted in significant overallcost savings on materials, equipment and services. We look forward to an activeand exciting period with the hope of continuing the Company's record ofdrill-bit success". For further information please contact: Egdon Resources Plc 01256 702292Mark Abbott, Joint Managing DirectorAndrew Hindle, Joint Managing Director Buchanan Communications 020 7466 5000Eric BurnsBen Willey Notes to the Editors: The wells within the outlined Egdon operated drilling programme are locatedwithin the PL090 licence (Waddock Cross-3, Waddock Cross-4) in the Wessex Basinwhere the Company holds a 45% working interest and the PEDL068 licence(Kirkleatham-4, Westerdale-1) in the Cleveland Basin where the Company holds a20% working interest but is carried for 10% of the first well, Kirkleatham-4,and also holds an option to increase its interest to 25%. The Portland-1 gasstorage confirmation well will be drilled by Egdon from a site leased by itswholly owned subsidiary, Portland Gas Limited. Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon was formed in 1997 by Dr Andrew Hindle and Mark Abbott. In December 2004,Egdon's shares commenced trading on AIM, having been previously traded on Ofexsince July 2000. The Company is developing two major business areas; an oil andgas exploration and production business which has a portfolio of twentyexploration licences containing identified oil and gas prospects ranging fromdiscoveries under appraisal through to higher risk but higher reward "wild cat"exploration prospects; and a gas storage business initially focused on thedevelopment of a salt cavern gas storage facility on the Isle of Portland,Dorset. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
17th Feb 20141:42 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Feb 201410:05 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
11th Feb 20147:00 amRNS£3 million Placing completed
4th Feb 20147:01 amRNSCompletion of Farm-out with Total E&P UK Ltd
30th Jan 20147:00 amRNSOpt-in Agreement with Total E&P UK Limited
13th Jan 20143:08 pmRNSLicence Extension PEDL181
13th Jan 20147:00 amRNSFarm-out Agreement with Total E&P UK Limited
5th Dec 20131:48 pmRNSResults of Annual General Meeting
5th Dec 20137:00 amRNSExploration Option and Farm-in Agreement
12th Nov 20134:21 pmRNSPosting of Annual Report and AGM notice
6th Nov 20137:00 amRNSFinal Results for the Year Ended 31 July 2013
24th Oct 201311:35 amRNSNotification of Results
17th Oct 20137:00 amRNSCompletion of Seismic Survey, Dorset.
2nd Oct 20137:00 amRNSCommencement of Production - Waddock Cross
26th Jul 20137:00 amRNSPlanning Approval for Burton on the Wolds-1
25th Jul 20134:21 pmRNSFavourable Holmwood High Court Decision
22nd Jul 20137:01 amRNSUnion Jack Oil plc AIM Admission Document
16th Jul 20137:00 amRNSPlanning Approval for Laughton-1 Exploration Well
8th Jul 201310:06 amRNSComment on Recent Shale Gas Developments
28th Jun 20137:00 amRNSPlanning Approval for Waddock Cross Development
24th Jun 20137:00 amRNSPlanning Approval for Wressle -1 (PEDL180)
28th May 20137:00 amRNSFarm-in Agreed for PEDL209
14th May 20137:00 amRNSSale of an Interest in PL090 and PEDL237
8th May 20137:00 amRNSFarm-out of interest in the Wressle Prospect
29th Apr 20137:00 amRNSInterim Results
5th Apr 20137:00 amRNSNotification of Results
4th Apr 20139:36 amRNSAward of Offshore Licence
2nd Apr 20137:00 amRNSSale of Certain Interests and Earn-in Arrangements
19th Mar 20139:17 amRNSCommencement of 2D seismic acquisition on PEDL 181
5th Mar 20137:00 amRNSPEDL253 and PEDL241 Farm out Agreements
26th Feb 20137:00 amRNSDirector/PDMR Shareholding
25th Feb 20137:00 amRNSChange of Adviser
19th Feb 20137:00 amRNSPEDL201 Farm out Agreement
24th Jan 20133:49 pmRNSDirectors Share Dealing
24th Jan 20132:04 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
22nd Jan 20137:00 amRNSMairy Permit Update
17th Jan 20137:00 amRNSHolding(s) in Company
15th Jan 201310:45 amRNSPEDL139/140 Shale-Gas Resource Assessment
7th Dec 20127:00 amRNSHolding(s) in Company
6th Dec 20121:12 pmRNSResults of Annual General Meeting
29th Nov 20127:00 amRNSCeres Production Update
15th Nov 20127:00 amRNSHolding(s) in Company
5th Nov 20127:00 amRNSFinal Results for the Year Ended 31 July 2012
2nd Nov 201212:47 pmRNSHolding in Company
17th Oct 20127:00 amRNSNotification of Results
27th Sep 20123:43 pmRNSPlanning Decision - Holmwood-1 Exploration Well
3rd Sep 201210:07 amRNSHolding(s) in Company
30th Jul 201212:15 pmRNSAcquisition of Dorset Exploration Limited
19th Jul 20122:12 pmRNSPlanning Granted for Westerdale - 2- Well
10th Jul 20122:03 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.