Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Operations Update

15 Mar 2006 07:00

Egdon Resources PLC15 March 2006 For immediate release 15 March 2006 EGDON RESOURCES PLC Operations Update: Kirkleatham-4 Confirmed as Gas Discovery Egdon Resources Plc ("Egdon" or "the Company"), the UK based independent oil andgas exploration and production company, is pleased to provide an update on itsUK operations and announce that testing operations have confirmed the presenceof gas at the Kirkleatham-4 well. At Kirkleatham-4 in Cleveland Basin licence PEDL068, testing of 6m perforatedinterval at the top of the Cadeby Formation commenced on 6 March with an initialflow rate of 2.8 million standard cubic feet of gas per day ("mmscfgd"). Therate was increased in steps during the five day test to a final rate of 5mmscfgd at a flowing well head pressure of approximately 1000 pounds per squareinch gauge pressure ("psig") through a 18/64" choke. During the test, flaringwas restricted to the period 07.00 to 19.00 hrs. The well was shut-in for a longterm build-up on 10 March. Initial analysis indicates that the gas quality isgood with less than 3 mol% inert content and 93 mol% Methane. The well has been completed for potential future production and will besuspended once the down-hole pressure gauges are recovered from the well laterthis week. The future programme for Kirkleatham will be decided followingrecovery of the down-hole gauges and full analysis of the test results. Planningis progressing for potential seismic acquisition over the Kirkleathamaccumulation. Test equipment and personnel are currently being moved from Kirkleatham-4 to theWesterdale-1 well-site, also in PEDL068, to test indications of gas encounteredin two intervals during recent drilling operations. Drilling operations at the Portland-1 well commenced on 6 March. The BDF28 rigwas drilling ahead at a depth of 810 metres at 15.00 hrs on 14 March. Portland-1is being operated by Egdon on behalf of its wholly owned subsidiary, PortlandGas Limited. Data from the well will enable the determination of the thicknessand suitability of the salt interval to create caverns at the proposed PortlandGas Storage Project. Portland-1 has a prognosed total depth of around 2500 m.Drilling, coring and testing operations are expected to take around 50 days. In Weald Basin licence PEDL070, operated by Star Energy Plc, the Avington-3appraisal well has reached TD and the well has been logged and a liner set. Awell test programme will now be undertaken using the operator's work-over rig. For further information please contact: Egdon Resources PlcMark Abbott, Joint Managing Director 01256 702292Andrew Hindle, Joint Managing Director Buchanan CommunicationsEric Burns 01943 883 990Ben Willey 020 7466 5000 Notes to the Editors In the PEDL068 licence in the Cleveland Basin the Company holds a 20% workinginterest and holds an option to increase its interest to 25%. The Portland-1 gasstorage confirmation well is being drilled by Egdon from a site leased by itswholly owned subsidiary, Portland Gas Limited. The Company holds a 20% workinginterest in the PEDL070 licence in the Weald Basin Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon was formed in 1997 by Dr Andrew Hindle and Mark Abbott. The Company'sshares are traded on AIM under code EDR. The Company is developing two major business areas: An oil and gas exploration and production business which has a portfolio oftwenty exploration licences containing identified oil and gas prospects rangingfrom discoveries under appraisal through to higher risk but higher reward "wildcat" exploration prospects. A gas storage business initially focused on the prospective development of amajor salt cavern gas storage facility beneath the Isle of Portland, Dorset. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Nov 20107:00 amRNSFinal Results
6th Oct 20107:00 amRNSCompletion of Disposal
4th Oct 20107:00 amRNSOperations Update
17th Aug 20104:58 pmRNSDirector/PDMR Shareholding
4th Aug 20107:00 amRNSLicence Update
2nd Aug 20107:00 amRNSTotal Voting Rights
30th Jul 20109:32 amRNSHolding(s) in Company
28th Jul 201010:30 amRNSCompletion of Acquisition
23rd Jun 201012:22 pmRNSDisposal
14th Jun 201011:59 amRNSProduction Results
11th Jun 20109:37 amRNSHolding(s) in Company
4th May 20107:00 amRNSAward of Permit
30th Apr 20102:48 pmRNSTotal Voting Rights
29th Apr 20107:00 amRNSInterim Report and Accounts
28th Apr 20107:00 amRNSOperational Update
8th Apr 20105:05 pmRNSHolding(s) in Company
8th Apr 20107:00 amRNSCommencement of Drilling
6th Apr 201011:32 amRNSResult of GM
1st Apr 20104:04 pmRNSHolding(s) in Company
25th Mar 20102:57 pmRNSHolding(s) in Company
22nd Mar 20107:00 amRNSAcquisition, Placing of Shares and Notice of GM
22nd Mar 20107:00 amRNSSale of Assets to Egdon Resources
22nd Feb 20107:00 amRNSSigniture of Commercial Agreements and Appointment
16th Feb 20103:10 pmRNSHolding(s) in Company
12th Feb 20107:00 amRNSKirklington Drilling Operations
5th Feb 20102:18 pmRNSKirklington-3 drilling operations
29th Jan 201012:22 pmRNSHolding(s) in Company
28th Jan 20103:22 pmRNSHolding(s) in Company
27th Jan 20109:31 amRNSUpdate on Dukes Wood-1 drilling operations
19th Jan 20107:00 amRNSFarm-out agreements
13th Jan 201010:58 amRNSCommencement of Drilling
21st Dec 20091:08 pmRNSExtension to Licence PEDL143
18th Dec 20097:00 amRNSUpdate on Drilling Plans
11th Dec 20097:00 amRNSCompletion of Sale of Licence Interests
3rd Dec 200912:54 pmRNSResult of AGM
25th Nov 200911:07 amRNSOperation Update - Dukes Wood-1 Well
18th Nov 200911:05 amRNSHolding(s) in Company
12th Nov 20092:49 pmRNSANNUAL REPORT & ACCOUNTS
4th Nov 20097:00 amRNSPreliminary Results
15th Oct 20097:00 amRNSSale of Licence Interests
23rd Sep 20097:00 amRNSPotential Asset Divestment
23rd Sep 20097:00 amRNSProposed Acquisition
16th Sep 20098:58 amRNSHolding(s) in Company
8th Sep 200912:58 pmRNSHolding(s) in Company
19th Aug 20091:00 pmRNSPlanning Permission Granted for Kirkleatham
11th Aug 200911:08 amRNSProduction Commences from Kirklington oil field
17th Jun 20097:00 amRNSAward of New Exploration Permit
27th Apr 20097:00 amRNSInterim Results
7th Apr 200910:09 amRNSNotice of Results
2nd Apr 20094:57 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.