Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

15 Mar 2006 07:00

Egdon Resources PLC15 March 2006 For immediate release 15 March 2006 EGDON RESOURCES PLC Operations Update: Kirkleatham-4 Confirmed as Gas Discovery Egdon Resources Plc ("Egdon" or "the Company"), the UK based independent oil andgas exploration and production company, is pleased to provide an update on itsUK operations and announce that testing operations have confirmed the presenceof gas at the Kirkleatham-4 well. At Kirkleatham-4 in Cleveland Basin licence PEDL068, testing of 6m perforatedinterval at the top of the Cadeby Formation commenced on 6 March with an initialflow rate of 2.8 million standard cubic feet of gas per day ("mmscfgd"). Therate was increased in steps during the five day test to a final rate of 5mmscfgd at a flowing well head pressure of approximately 1000 pounds per squareinch gauge pressure ("psig") through a 18/64" choke. During the test, flaringwas restricted to the period 07.00 to 19.00 hrs. The well was shut-in for a longterm build-up on 10 March. Initial analysis indicates that the gas quality isgood with less than 3 mol% inert content and 93 mol% Methane. The well has been completed for potential future production and will besuspended once the down-hole pressure gauges are recovered from the well laterthis week. The future programme for Kirkleatham will be decided followingrecovery of the down-hole gauges and full analysis of the test results. Planningis progressing for potential seismic acquisition over the Kirkleathamaccumulation. Test equipment and personnel are currently being moved from Kirkleatham-4 to theWesterdale-1 well-site, also in PEDL068, to test indications of gas encounteredin two intervals during recent drilling operations. Drilling operations at the Portland-1 well commenced on 6 March. The BDF28 rigwas drilling ahead at a depth of 810 metres at 15.00 hrs on 14 March. Portland-1is being operated by Egdon on behalf of its wholly owned subsidiary, PortlandGas Limited. Data from the well will enable the determination of the thicknessand suitability of the salt interval to create caverns at the proposed PortlandGas Storage Project. Portland-1 has a prognosed total depth of around 2500 m.Drilling, coring and testing operations are expected to take around 50 days. In Weald Basin licence PEDL070, operated by Star Energy Plc, the Avington-3appraisal well has reached TD and the well has been logged and a liner set. Awell test programme will now be undertaken using the operator's work-over rig. For further information please contact: Egdon Resources PlcMark Abbott, Joint Managing Director 01256 702292Andrew Hindle, Joint Managing Director Buchanan CommunicationsEric Burns 01943 883 990Ben Willey 020 7466 5000 Notes to the Editors In the PEDL068 licence in the Cleveland Basin the Company holds a 20% workinginterest and holds an option to increase its interest to 25%. The Portland-1 gasstorage confirmation well is being drilled by Egdon from a site leased by itswholly owned subsidiary, Portland Gas Limited. The Company holds a 20% workinginterest in the PEDL070 licence in the Weald Basin Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon was formed in 1997 by Dr Andrew Hindle and Mark Abbott. The Company'sshares are traded on AIM under code EDR. The Company is developing two major business areas: An oil and gas exploration and production business which has a portfolio oftwenty exploration licences containing identified oil and gas prospects rangingfrom discoveries under appraisal through to higher risk but higher reward "wildcat" exploration prospects. A gas storage business initially focused on the prospective development of amajor salt cavern gas storage facility beneath the Isle of Portland, Dorset. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jan 20184:35 pmRNSPrice Monitoring Extension
5th Jan 20182:05 pmRNSSecond Price Monitoring Extn
5th Jan 20182:00 pmRNSPrice Monitoring Extension
5th Jan 201811:05 amRNSSecond Price Monitoring Extn
5th Jan 201811:00 amRNSPrice Monitoring Extension
5th Jan 20189:05 amRNSSecond Price Monitoring Extn
5th Jan 20189:00 amRNSPrice Monitoring Extension
5th Jan 20187:00 amRNSWressle Development Planning Appeals Rejected
7th Dec 201712:59 pmRNSResults of Annual General Meeting
4th Dec 20177:00 amRNSP2304 Offshore Licence Acquisition
21st Nov 20177:00 amRNSUpdate on Holmwood Well, PEDL 143, Weald Basin
6th Nov 20177:00 amRNSSale of interest in Fiskerton Airfield Oil Field
1st Nov 20173:18 pmRNSINEOS Acquires Interests in Egdon's Core Shale Gas
31st Oct 20177:00 amRNSFinal Results for the Year Ended 31 July 2017
27th Oct 20171:31 pmRNSFiskerton Airfield Oil Field Acquisition
25th Oct 20173:52 pmRNSNOTIFICATION OF MAJOR HOLDINGS
19th Oct 20177:00 amRNSHolmwood update
6th Oct 20177:00 amRNSNotification of Results
21st Sep 20179:12 amRNSNOTIFICATION OF MAJOR HOLDINGS
14th Aug 20177:00 amRNSEDR Operational Update
26th Jul 20178:42 amRNSNOTIFICATION OF MAJOR HOLDINGS
13th Jul 201710:00 amRNSBiscathorpe-2 Exploration Well
13th Jul 20177:00 amRNSWressle Planning Appeal Update
10th Jul 20177:00 amRNSUK Onshore Producing Oil Field Acquisition
3rd Jul 20173:29 pmRNSWressle Planning Decision
30th Jun 20177:00 amRNSWressle Planning Meeting
12th Jun 20177:00 amRNSUK Onshore Licence Interest Acquisition
19th May 20177:00 amRNSWressle-Issue of EA Mining Waste Permit Variation
8th May 20179:36 amRNSNotification of Major Shareholding
3rd May 20177:00 amRNSWressle Development - New Planning Application
11th Apr 20177:00 amRNSInterim Results for the 6 Months Ended 31 Jan 2017
11th Apr 20177:00 amRNSWressle - Appeal & New Planning Application
4th Apr 20177:00 amRNSPEDL209 exch of interests; new opt-in agreement
6th Mar 20177:00 amRNSNotification of Interim Results
7th Feb 201711:00 amRNSDirectors Shareholding
7th Feb 20177:00 amRNSWressle Update and Production Guidance
30th Jan 20177:00 amRNSCompletion of acquisition of interest in PEDL201
11th Jan 20174:10 pmRNSWressle Planning Decision
8th Dec 20161:00 pmRNSResults of Annual General Meeting
30th Nov 20163:45 pmRNSDirectors' Share Dealing
30th Nov 201611:55 amRNSTR-1 - Notification of Major Interest in Shares
25th Nov 20167:00 amRNSResult of Open Offer
16th Nov 20167:00 amRNSUK Onshore Licence Interest Acquisition
15th Nov 20161:23 pmRNSSprings Road Planning Decision
14th Nov 20161:13 pmRNSTR-1: Notification of Interest
14th Nov 201612:32 pmRNSTR-1: Notification of Interest
8th Nov 20167:00 amRNSPosting of Open Offer Circular
7th Nov 20167:00 amRNSExercise of Options
1st Nov 20167:10 amRNSSubscription and Open Offer
1st Nov 20167:00 amRNSFinal results for the Year Ended 31 July 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.