Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

16 May 2006 10:33

Egdon Resources PLC16 May 2006 16 May 2006 For immediate release EGDON RESOURCES PLC Portland-1 Operations Update Egdon Resources Plc (AIM : EDR), the onshore UK focused energy company, todayprovides an update on its gas storage project on the Isle of Portland in Dorset. Portland Gas Limited ('the Company'), a wholly owned subsidiary of EgdonResources Plc, is drilling the Portland-1 borehole on the Isle of Portland,Dorset to confirm that a halite sequence (called 'S7' by the Company), within aTriassic salt sequence ('Saliferous Beds') of the Wessex Basin, is suitable forthe creation of caverns to store natural gas. As previously reported, the top of the Saliferous Beds was encountered at adepth of 2139 metres. Following the setting of a 7 inch steel liner in the hole,coring of the sequence, using a wireline retrievable 4.2 metre core barrelwithin a 'PQ' coring string, commenced on 14 April 2006 at a depth of 2149metres. On 26 April, after cutting core number 32 at a depth of 2260.98 metres, the 'PQ'string jammed in the hole and whilst trying to pull it free the pipe parted at adepth of 1086 metres. During subsequent 'fishing' operations to retrieve the 'PQ' string that remained in the hole, the rig had mechanical problems whichfurther delayed the operations. The 'PQ' pipe was partially recovered to a depthof 2107 metres. On 12 May the decision was made to sidetrack the well at a depthof 2040 metres, drill the new hole section to 2250 metres (with the sidetrackedwell path programmed to be approximately 10 metres to the northwest of theoriginal hole at this depth) and then resume coring using a conventional 18metre core barrel on the end of drilling pipe. At 06:00 hours today the window in the 7 inch steel liner had been cut anddrilling operations will resume within the next 24 hours. It is anticipated thatcoring will re-start within the next 3 days. The top of the S7 sequence was encountered at a depth of 2235 metres (to beconfirmed by wireline logging after the Saliferous Beds has been drilled). Corehas been recovered in the well to a depth of 2256.68 metres. To date, 117.68metres of the Saliferous Beds have been confirmed, of which 21.68 metres areinterpreted as the S7 sequence. The S7 is expected to be approximately 180metres thick at Portland-1. Core samples from the section already drilled have been taken to laboratories inGermany to enable the Company to start a series of tests to confirm thesuitability of the Saliferous Beds on the Isle of Portland for the developmentof a gas storage facility and, if so, to optimise the design of the storagecaverns. The results of these tests are anticipated at the end of July 2006. Ifpositive, this will result in a planning application being submitted inSeptember or October 2006. For further information please contact: Egdon resources Plc Andrew Hindle, Joint Managing Director 01256 702 292 Mark Abbott, Joint Managing Director Buchanan Communications Eric Burns 01943 883 990 Ben Willey 020 7466 5000 Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon's shares are traded on the AIMmarket. The Company is developing two major business areas: An oil and gas exploration and production business which has a portfolio oftwenty exploration licences containing identified oil and gas prospects rangingfrom discoveries under appraisal through to higher risk but higher reward "wild-cat" exploration prospects. A gas storage business initially focused on the prospective development of amajor salt cavern gas storage facility beneath the Isle of Portland, Dorset. In accordance with AIM rules -guidance for mining, oil and gas companies, theinformation contained in this announcement has been reviewed and signed off bythe Joint Managing Director of Egdon Resources Dr Andrew Hindle, a CharteredGeologist with over 22 years experience. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Feb 20158:14 amRNSCommencement of Drilling Operations at Kiln Lane-1
19th Feb 20157:00 amRNSUpdate on Wressle-1 Well Testing
9th Feb 20157:00 amRNSUpdate on Wressle-1 Well Testing
2nd Feb 20157:00 amRNSSale of Licence Interests to UK Oil & Gas
12th Dec 201412:13 pmRNSResults of Annual General Meeting
10th Dec 201412:46 pmRNSDirectors' Share Dealings
9th Dec 20147:00 amRNSPlanning Permission granted: North Kelsey-1 Well
4th Dec 20147:00 amRNSUpdate on Timing of Wressle-1 Well Testing
4th Dec 20147:00 amRNSExploration Option and Farm-in
2nd Dec 20147:00 amRNSAcquisition of Yorkshire Exploration Ltd
14th Nov 20147:00 amRNSAcquisition of Yorkshire Exploration Limited
11th Nov 20147:00 amRNSFinal Results for the Year Ended 31 July 2014
30th Oct 201410:04 amRNSCompletion of drilling - Burton on the Wolds-1
22nd Oct 20144:01 pmRNSPlanning approval granted for Kiln Lane Well
21st Oct 20147:00 amRNSCommencement of drilling - Burton on the Wolds-1
20th Oct 20147:00 amRNSOperations Update and Notice of Final Results
18th Sep 20147:00 amRNSBurton on the Wolds-1 well timing update
2nd Sep 20147:00 amRNSPreliminary Results of the Wressle-1 Well
21st Jul 20147:00 amRNSCommencement of drilling operations
30th Jun 20145:46 pmRNSHoldings in Company
27th Jun 20147:00 amRNSAppointment of Non-Executive Director
23rd Jun 201411:18 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
19th Jun 201412:10 pmRNSFavourable Holmwood Court of Appeal Decision
13th Jun 20143:05 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Jun 20147:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th Jun 20145:01 pmRNSApproval of transfer of onshore shale gas business
10th Jun 20145:00 pmRNSUpdate on transfer of onshore shale gas business
5th Jun 201412:01 pmRNSResult of Egdon Resources General Meeting
5th Jun 201412:00 pmRNSResult of Extraordinary General Meeting
5th Jun 201411:01 amRNSUpdate on transfer of onshore shale gas business
5th Jun 201411:00 amRNSUpdate on transfer of onshore shale gas business
3rd Jun 20142:01 pmRNSResult of Open Offer
2nd Jun 201412:04 pmRNSPEDL201
29th May 201411:01 amRNSPEDL 180 and PEDL 201
23rd May 201412:53 pmRNSIssue of Equity and Total Voting Rights
14th May 20147:00 amRNSGrant of Options to Directors
13th May 20147:00 amRNSAlkane Transaction, Placing and Open Offer
13th May 20147:00 amRNSTransfer of onshore shale gas business
12th May 201410:30 amRNSRestoration - Egdon Resources Plc
12th May 201410:20 amRNSPress comment
12th May 201410:20 amRNSPress comment
12th May 20147:58 amRNSSuspension - Egdon Resources plc
6th May 20146:10 pmRNSHolding(s) in Company
25th Apr 20147:00 amRNSInterim Results
25th Apr 20147:00 amRNSIndependent Gas in Place Estimates
16th Apr 20142:00 pmRNSAppointment of Joint Broker
31st Mar 20147:31 amRNSCompletion of 3D seismic PEDL139/140
12th Mar 20145:33 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Feb 20144:01 pmRNSIssue of Equity and Total Voting Rights
20th Feb 20143:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.