Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Operations Update

16 May 2006 10:33

Egdon Resources PLC16 May 2006 16 May 2006 For immediate release EGDON RESOURCES PLC Portland-1 Operations Update Egdon Resources Plc (AIM : EDR), the onshore UK focused energy company, todayprovides an update on its gas storage project on the Isle of Portland in Dorset. Portland Gas Limited ('the Company'), a wholly owned subsidiary of EgdonResources Plc, is drilling the Portland-1 borehole on the Isle of Portland,Dorset to confirm that a halite sequence (called 'S7' by the Company), within aTriassic salt sequence ('Saliferous Beds') of the Wessex Basin, is suitable forthe creation of caverns to store natural gas. As previously reported, the top of the Saliferous Beds was encountered at adepth of 2139 metres. Following the setting of a 7 inch steel liner in the hole,coring of the sequence, using a wireline retrievable 4.2 metre core barrelwithin a 'PQ' coring string, commenced on 14 April 2006 at a depth of 2149metres. On 26 April, after cutting core number 32 at a depth of 2260.98 metres, the 'PQ'string jammed in the hole and whilst trying to pull it free the pipe parted at adepth of 1086 metres. During subsequent 'fishing' operations to retrieve the 'PQ' string that remained in the hole, the rig had mechanical problems whichfurther delayed the operations. The 'PQ' pipe was partially recovered to a depthof 2107 metres. On 12 May the decision was made to sidetrack the well at a depthof 2040 metres, drill the new hole section to 2250 metres (with the sidetrackedwell path programmed to be approximately 10 metres to the northwest of theoriginal hole at this depth) and then resume coring using a conventional 18metre core barrel on the end of drilling pipe. At 06:00 hours today the window in the 7 inch steel liner had been cut anddrilling operations will resume within the next 24 hours. It is anticipated thatcoring will re-start within the next 3 days. The top of the S7 sequence was encountered at a depth of 2235 metres (to beconfirmed by wireline logging after the Saliferous Beds has been drilled). Corehas been recovered in the well to a depth of 2256.68 metres. To date, 117.68metres of the Saliferous Beds have been confirmed, of which 21.68 metres areinterpreted as the S7 sequence. The S7 is expected to be approximately 180metres thick at Portland-1. Core samples from the section already drilled have been taken to laboratories inGermany to enable the Company to start a series of tests to confirm thesuitability of the Saliferous Beds on the Isle of Portland for the developmentof a gas storage facility and, if so, to optimise the design of the storagecaverns. The results of these tests are anticipated at the end of July 2006. Ifpositive, this will result in a planning application being submitted inSeptember or October 2006. For further information please contact: Egdon resources Plc Andrew Hindle, Joint Managing Director 01256 702 292 Mark Abbott, Joint Managing Director Buchanan Communications Eric Burns 01943 883 990 Ben Willey 020 7466 5000 Company Background Egdon is an established, UK-based energy company primarily focused on thehydrocarbon-producing basins of the onshore UK. Egdon also has explorationinterests in the offshore UK and France. Egdon's shares are traded on the AIMmarket. The Company is developing two major business areas: An oil and gas exploration and production business which has a portfolio oftwenty exploration licences containing identified oil and gas prospects rangingfrom discoveries under appraisal through to higher risk but higher reward "wild-cat" exploration prospects. A gas storage business initially focused on the prospective development of amajor salt cavern gas storage facility beneath the Isle of Portland, Dorset. In accordance with AIM rules -guidance for mining, oil and gas companies, theinformation contained in this announcement has been reviewed and signed off bythe Joint Managing Director of Egdon Resources Dr Andrew Hindle, a CharteredGeologist with over 22 years experience. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
17th Feb 20141:42 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
13th Feb 201410:05 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
11th Feb 20147:00 amRNS£3 million Placing completed
4th Feb 20147:01 amRNSCompletion of Farm-out with Total E&P UK Ltd
30th Jan 20147:00 amRNSOpt-in Agreement with Total E&P UK Limited
13th Jan 20143:08 pmRNSLicence Extension PEDL181
13th Jan 20147:00 amRNSFarm-out Agreement with Total E&P UK Limited
5th Dec 20131:48 pmRNSResults of Annual General Meeting
5th Dec 20137:00 amRNSExploration Option and Farm-in Agreement
12th Nov 20134:21 pmRNSPosting of Annual Report and AGM notice
6th Nov 20137:00 amRNSFinal Results for the Year Ended 31 July 2013
24th Oct 201311:35 amRNSNotification of Results
17th Oct 20137:00 amRNSCompletion of Seismic Survey, Dorset.
2nd Oct 20137:00 amRNSCommencement of Production - Waddock Cross
26th Jul 20137:00 amRNSPlanning Approval for Burton on the Wolds-1
25th Jul 20134:21 pmRNSFavourable Holmwood High Court Decision
22nd Jul 20137:01 amRNSUnion Jack Oil plc AIM Admission Document
16th Jul 20137:00 amRNSPlanning Approval for Laughton-1 Exploration Well
8th Jul 201310:06 amRNSComment on Recent Shale Gas Developments
28th Jun 20137:00 amRNSPlanning Approval for Waddock Cross Development
24th Jun 20137:00 amRNSPlanning Approval for Wressle -1 (PEDL180)
28th May 20137:00 amRNSFarm-in Agreed for PEDL209
14th May 20137:00 amRNSSale of an Interest in PL090 and PEDL237
8th May 20137:00 amRNSFarm-out of interest in the Wressle Prospect
29th Apr 20137:00 amRNSInterim Results
5th Apr 20137:00 amRNSNotification of Results
4th Apr 20139:36 amRNSAward of Offshore Licence
2nd Apr 20137:00 amRNSSale of Certain Interests and Earn-in Arrangements
19th Mar 20139:17 amRNSCommencement of 2D seismic acquisition on PEDL 181
5th Mar 20137:00 amRNSPEDL253 and PEDL241 Farm out Agreements
26th Feb 20137:00 amRNSDirector/PDMR Shareholding
25th Feb 20137:00 amRNSChange of Adviser
19th Feb 20137:00 amRNSPEDL201 Farm out Agreement
24th Jan 20133:49 pmRNSDirectors Share Dealing
24th Jan 20132:04 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
22nd Jan 20137:00 amRNSMairy Permit Update
17th Jan 20137:00 amRNSHolding(s) in Company
15th Jan 201310:45 amRNSPEDL139/140 Shale-Gas Resource Assessment
7th Dec 20127:00 amRNSHolding(s) in Company
6th Dec 20121:12 pmRNSResults of Annual General Meeting
29th Nov 20127:00 amRNSCeres Production Update
15th Nov 20127:00 amRNSHolding(s) in Company
5th Nov 20127:00 amRNSFinal Results for the Year Ended 31 July 2012
2nd Nov 201212:47 pmRNSHolding in Company
17th Oct 20127:00 amRNSNotification of Results
27th Sep 20123:43 pmRNSPlanning Decision - Holmwood-1 Exploration Well
3rd Sep 201210:07 amRNSHolding(s) in Company
30th Jul 201212:15 pmRNSAcquisition of Dorset Exploration Limited
19th Jul 20122:12 pmRNSPlanning Granted for Westerdale - 2- Well
10th Jul 20122:03 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.