Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

14 Jan 2008 12:15

Egdon Resources PLC14 January 2008 For Immediate Release 14 January 2008 EGDON RESOURCES PLC ("EGDON" or "the Company") Commencement of drilling operations at Grenade-3 well Egdon Resources Plc is pleased to announce the commencement of drillingoperations at Grenade-3, in Egdon's operated St Laurent Permit in SW FranceEgdon holds a 33.4% interest in the well. The COFOR MAS 3000 rig completed the rig move on 9 January 2008 and drillingoperations commenced at 12.00 hours on 10 January 2008. The Grenade-3 well willtake approximately 30 days to reach target depth. The Grenade-3 well is an appraisal of the Grenade heavy oil accumulation. Thediscovery well, Grenade Sur Adour-1, was drilled by Elf in 1975 and found a 97mcolumn of 10 degree API oil. Between 1976 and 1985 around 8,000 barrels of oilwere recovered from intermittent tests, the well being finally plugged andabandoned during a period of low oil prices in 1985. An independent report by RPS Troy-Ikoda in 2004 determined that the oil-in-placewithin the structure was in the range of 68 to 485 million stock tank barrels(MMStb), with a Best Estimate of 221 MMStb. During 2005 the Company acquired40km of 2D seismic and 12km2 of 3D seismic data over Grenade and, by integratingthe new data with both existing reprocessed 2D seismic data and the results ofan extensive regional core study, was able to better define the trap. Theresultant mapped trap is a large three-way up-dip pinch-out of the reservoir ona low energy carbonate platform. Based on this revised trapping model, Egdon hasdetermined a range of oil-in-place of 95 to 945 MMStb with a Best Estimate of300 MMstb. Grenade-3 is a step-out to the Grenade-1 discovery well and will be drilled as avertical pilot hole designed to confirm the oil column and reservoirdistribution. Contingent upon the results of this pilot hole, a horizontalsidetrack will be drilled and completed for a long term production test to beundertaken. The production test would utilise modern completion, pumping andviscosity reduction methods in the horizontal reservoir interval to determinethe likely recoverable reserves and commerciality of the Grenade oilaccumulation. For further information please contact: Egdon Resources PlcMark Abbott, Joint Managing Director 01256 702 292Andrew Hindle, Joint Managing Director 0208 332 1200 Buchanan CommunicationsBen Willey 020 7466 5000Nicholas Melson Seymour PierceJonathan Wright 020 7107 8000 Notes to Editors The co-venturers in St Laurent Permit are as follows: +------------------------------------+------------+|Company | Interest|+------------------------------------+------------+|Egdon Resources (New Ventures) Ltd | 33.423%|+------------------------------------+------------+|Sterling Resources UK Limited | 33.423%|+------------------------------------+------------+|Nautical Petroleum plc | 22.000%|+------------------------------------+------------+|Malta Oil and Gas PTY limited | 11.154%|+------------------------------------+------------+ Company Background Egdon is an established, UK-based energy company primarily focused on theonshore UK. Egdon also has exploration interests in the offshore UK and France.Egdon's shares are traded on the AIM market. The Company has developed two distinctive businesses; an oil and gas explorationand production business which has a portfolio of twenty exploration licences,and a gas storage business initially focused on the development of a major saltcavern gas storage facility on Portland, Dorset. Egdon plans to demerge the two businesses effective 17 January 2008. In accordance with AIM rules - guidance for mining, oil and gas companies, theinformation contained in this announcement has been reviewed and signed off bythe Joint Managing Director of Egdon Resources Mark Abbott, a Geoscientist withover 21 years experience. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Nov 20167:00 amRNSIndependent Gas in Place Estimates
26th Oct 20167:00 amRNSUK Onshore Licence Interest Acquisitions
18th Oct 20167:00 amRNSNotification of Results
7th Oct 20163:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th Oct 201610:15 amRNSSprings Road Planning Adjournment
3rd Oct 20167:00 amRNSUK 14th Onshore Licensing Round Final Awards
26th Sep 20167:00 amRNSCPR on Wressle-1 and Broughton North Prospect
26th Aug 20162:35 pmRNSExercise of options
22nd Aug 20167:00 amRNSAcquisition of additional interest in PEDL068
15th Aug 201612:49 pmRNSHargreave Hale TR1
15th Jul 20167:00 amRNSNotification of Major Shareholding
4th Jul 20167:00 amRNSUK Licence Changes
27th Jun 20167:05 amRNSExtension of Licence PEDL143
13th Jun 20167:00 amRNSFarm-out of Interest in PEDL182
24th May 20164:35 pmRNSPrice Monitoring Extension
26th Apr 20167:00 amRNSInterim Results
4th Apr 20167:00 amRNSNotification of Interim Results
14th Mar 20161:00 pmRNSCompletion of drilling - Laughton-1 exploration
15th Feb 20167:00 amRNSCommencement drilling operations Laughton-1 Well
8th Feb 20167:00 amRNSKeddington-5 Development Well
26th Jan 20167:00 amRNSFarm-out of Interest in the Laughton-1 Well
18th Jan 20167:00 amRNSCommencement of Drilling Keddington-5 Well
5th Jan 20161:41 pmRNSDirectors Share Dealing
4th Jan 20161:53 pmRNSDirectorate Changes
17th Dec 20153:32 pmRNSDirectors Share Dealing
17th Dec 20151:25 pmRNSUK 14th Onshore O&G Licensing Round 2nd Tranche
3rd Dec 201512:23 pmRNSResults of AGM
30th Nov 201510:18 amRNSHolding(s) in Company
16th Nov 20158:00 amRNSGrant of Options
3rd Nov 20157:00 amRNSFinal Results for the Year Ended 31 July 2015
22nd Oct 20157:00 amRNSWressle Oil and Gas Discovery: Update
14th Oct 201510:37 amRNSNotice of Results
23rd Sep 20153:08 pmRNSFavourable Holmwood Planning Decision
21st Sep 20157:00 amRNSCompletion of Farm-out of Interests in PEDL005(R)
4th Sep 20158:20 amRNSWressle-1 Update and Forward Plan
18th Aug 20152:35 pmRNSEgdon to be offered blocks in 14th Onshore Round
7th Aug 20153:31 pmRNSFavourable Holmwood Planning Inspectorate Decision
21st Jul 20157:00 amRNSWressle-1 EWT Update
14th Jul 20157:00 amRNSFarm-out of Interests in Licence PEDL005(R)
29th Jun 20157:00 amRNSFarm-out of PEDL143 Holmwood Prospect
22nd Jun 201511:09 amRNSHolding(s) in Company
22nd Jun 20157:00 amRNSFarm-out of further Interest in PEDL253
18th Jun 20157:00 amRNSWressle-1 Commencement of Extended Well Test
5th Jun 20157:00 amRNSPEDL241 - Acquisition of Additional Interest
21st Apr 20157:00 amRNSInterim Results
1st Apr 20154:05 pmRNSNotification of interim results
27th Mar 20157:00 amRNSWressle-1 Testing Update Second Penistone Flags
23rd Mar 20157:01 amRNSCompletion of drilling at Kiln Lane-1
16th Mar 20153:00 pmRNSPlanning Permission Granted for Biscathorpe-2 well
3rd Mar 20157:00 amRNSUpdate on Wressle-1 Well Testing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.