Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Drilling Update

14 Jan 2008 12:15

Egdon Resources PLC14 January 2008 For Immediate Release 14 January 2008 EGDON RESOURCES PLC ("EGDON" or "the Company") Commencement of drilling operations at Grenade-3 well Egdon Resources Plc is pleased to announce the commencement of drillingoperations at Grenade-3, in Egdon's operated St Laurent Permit in SW FranceEgdon holds a 33.4% interest in the well. The COFOR MAS 3000 rig completed the rig move on 9 January 2008 and drillingoperations commenced at 12.00 hours on 10 January 2008. The Grenade-3 well willtake approximately 30 days to reach target depth. The Grenade-3 well is an appraisal of the Grenade heavy oil accumulation. Thediscovery well, Grenade Sur Adour-1, was drilled by Elf in 1975 and found a 97mcolumn of 10 degree API oil. Between 1976 and 1985 around 8,000 barrels of oilwere recovered from intermittent tests, the well being finally plugged andabandoned during a period of low oil prices in 1985. An independent report by RPS Troy-Ikoda in 2004 determined that the oil-in-placewithin the structure was in the range of 68 to 485 million stock tank barrels(MMStb), with a Best Estimate of 221 MMStb. During 2005 the Company acquired40km of 2D seismic and 12km2 of 3D seismic data over Grenade and, by integratingthe new data with both existing reprocessed 2D seismic data and the results ofan extensive regional core study, was able to better define the trap. Theresultant mapped trap is a large three-way up-dip pinch-out of the reservoir ona low energy carbonate platform. Based on this revised trapping model, Egdon hasdetermined a range of oil-in-place of 95 to 945 MMStb with a Best Estimate of300 MMstb. Grenade-3 is a step-out to the Grenade-1 discovery well and will be drilled as avertical pilot hole designed to confirm the oil column and reservoirdistribution. Contingent upon the results of this pilot hole, a horizontalsidetrack will be drilled and completed for a long term production test to beundertaken. The production test would utilise modern completion, pumping andviscosity reduction methods in the horizontal reservoir interval to determinethe likely recoverable reserves and commerciality of the Grenade oilaccumulation. For further information please contact: Egdon Resources PlcMark Abbott, Joint Managing Director 01256 702 292Andrew Hindle, Joint Managing Director 0208 332 1200 Buchanan CommunicationsBen Willey 020 7466 5000Nicholas Melson Seymour PierceJonathan Wright 020 7107 8000 Notes to Editors The co-venturers in St Laurent Permit are as follows: +------------------------------------+------------+|Company | Interest|+------------------------------------+------------+|Egdon Resources (New Ventures) Ltd | 33.423%|+------------------------------------+------------+|Sterling Resources UK Limited | 33.423%|+------------------------------------+------------+|Nautical Petroleum plc | 22.000%|+------------------------------------+------------+|Malta Oil and Gas PTY limited | 11.154%|+------------------------------------+------------+ Company Background Egdon is an established, UK-based energy company primarily focused on theonshore UK. Egdon also has exploration interests in the offshore UK and France.Egdon's shares are traded on the AIM market. The Company has developed two distinctive businesses; an oil and gas explorationand production business which has a portfolio of twenty exploration licences,and a gas storage business initially focused on the development of a major saltcavern gas storage facility on Portland, Dorset. Egdon plans to demerge the two businesses effective 17 January 2008. In accordance with AIM rules - guidance for mining, oil and gas companies, theinformation contained in this announcement has been reviewed and signed off bythe Joint Managing Director of Egdon Resources Mark Abbott, a Geoscientist withover 21 years experience. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Nov 20107:00 amRNSFinal Results
6th Oct 20107:00 amRNSCompletion of Disposal
4th Oct 20107:00 amRNSOperations Update
17th Aug 20104:58 pmRNSDirector/PDMR Shareholding
4th Aug 20107:00 amRNSLicence Update
2nd Aug 20107:00 amRNSTotal Voting Rights
30th Jul 20109:32 amRNSHolding(s) in Company
28th Jul 201010:30 amRNSCompletion of Acquisition
23rd Jun 201012:22 pmRNSDisposal
14th Jun 201011:59 amRNSProduction Results
11th Jun 20109:37 amRNSHolding(s) in Company
4th May 20107:00 amRNSAward of Permit
30th Apr 20102:48 pmRNSTotal Voting Rights
29th Apr 20107:00 amRNSInterim Report and Accounts
28th Apr 20107:00 amRNSOperational Update
8th Apr 20105:05 pmRNSHolding(s) in Company
8th Apr 20107:00 amRNSCommencement of Drilling
6th Apr 201011:32 amRNSResult of GM
1st Apr 20104:04 pmRNSHolding(s) in Company
25th Mar 20102:57 pmRNSHolding(s) in Company
22nd Mar 20107:00 amRNSAcquisition, Placing of Shares and Notice of GM
22nd Mar 20107:00 amRNSSale of Assets to Egdon Resources
22nd Feb 20107:00 amRNSSigniture of Commercial Agreements and Appointment
16th Feb 20103:10 pmRNSHolding(s) in Company
12th Feb 20107:00 amRNSKirklington Drilling Operations
5th Feb 20102:18 pmRNSKirklington-3 drilling operations
29th Jan 201012:22 pmRNSHolding(s) in Company
28th Jan 20103:22 pmRNSHolding(s) in Company
27th Jan 20109:31 amRNSUpdate on Dukes Wood-1 drilling operations
19th Jan 20107:00 amRNSFarm-out agreements
13th Jan 201010:58 amRNSCommencement of Drilling
21st Dec 20091:08 pmRNSExtension to Licence PEDL143
18th Dec 20097:00 amRNSUpdate on Drilling Plans
11th Dec 20097:00 amRNSCompletion of Sale of Licence Interests
3rd Dec 200912:54 pmRNSResult of AGM
25th Nov 200911:07 amRNSOperation Update - Dukes Wood-1 Well
18th Nov 200911:05 amRNSHolding(s) in Company
12th Nov 20092:49 pmRNSANNUAL REPORT & ACCOUNTS
4th Nov 20097:00 amRNSPreliminary Results
15th Oct 20097:00 amRNSSale of Licence Interests
23rd Sep 20097:00 amRNSPotential Asset Divestment
23rd Sep 20097:00 amRNSProposed Acquisition
16th Sep 20098:58 amRNSHolding(s) in Company
8th Sep 200912:58 pmRNSHolding(s) in Company
19th Aug 20091:00 pmRNSPlanning Permission Granted for Kirkleatham
11th Aug 200911:08 amRNSProduction Commences from Kirklington oil field
17th Jun 20097:00 amRNSAward of New Exploration Permit
27th Apr 20097:00 amRNSInterim Results
7th Apr 200910:09 amRNSNotice of Results
2nd Apr 20094:57 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.