The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

14 Jan 2008 12:15

Egdon Resources PLC14 January 2008 For Immediate Release 14 January 2008 EGDON RESOURCES PLC ("EGDON" or "the Company") Commencement of drilling operations at Grenade-3 well Egdon Resources Plc is pleased to announce the commencement of drillingoperations at Grenade-3, in Egdon's operated St Laurent Permit in SW FranceEgdon holds a 33.4% interest in the well. The COFOR MAS 3000 rig completed the rig move on 9 January 2008 and drillingoperations commenced at 12.00 hours on 10 January 2008. The Grenade-3 well willtake approximately 30 days to reach target depth. The Grenade-3 well is an appraisal of the Grenade heavy oil accumulation. Thediscovery well, Grenade Sur Adour-1, was drilled by Elf in 1975 and found a 97mcolumn of 10 degree API oil. Between 1976 and 1985 around 8,000 barrels of oilwere recovered from intermittent tests, the well being finally plugged andabandoned during a period of low oil prices in 1985. An independent report by RPS Troy-Ikoda in 2004 determined that the oil-in-placewithin the structure was in the range of 68 to 485 million stock tank barrels(MMStb), with a Best Estimate of 221 MMStb. During 2005 the Company acquired40km of 2D seismic and 12km2 of 3D seismic data over Grenade and, by integratingthe new data with both existing reprocessed 2D seismic data and the results ofan extensive regional core study, was able to better define the trap. Theresultant mapped trap is a large three-way up-dip pinch-out of the reservoir ona low energy carbonate platform. Based on this revised trapping model, Egdon hasdetermined a range of oil-in-place of 95 to 945 MMStb with a Best Estimate of300 MMstb. Grenade-3 is a step-out to the Grenade-1 discovery well and will be drilled as avertical pilot hole designed to confirm the oil column and reservoirdistribution. Contingent upon the results of this pilot hole, a horizontalsidetrack will be drilled and completed for a long term production test to beundertaken. The production test would utilise modern completion, pumping andviscosity reduction methods in the horizontal reservoir interval to determinethe likely recoverable reserves and commerciality of the Grenade oilaccumulation. For further information please contact: Egdon Resources PlcMark Abbott, Joint Managing Director 01256 702 292Andrew Hindle, Joint Managing Director 0208 332 1200 Buchanan CommunicationsBen Willey 020 7466 5000Nicholas Melson Seymour PierceJonathan Wright 020 7107 8000 Notes to Editors The co-venturers in St Laurent Permit are as follows: +------------------------------------+------------+|Company | Interest|+------------------------------------+------------+|Egdon Resources (New Ventures) Ltd | 33.423%|+------------------------------------+------------+|Sterling Resources UK Limited | 33.423%|+------------------------------------+------------+|Nautical Petroleum plc | 22.000%|+------------------------------------+------------+|Malta Oil and Gas PTY limited | 11.154%|+------------------------------------+------------+ Company Background Egdon is an established, UK-based energy company primarily focused on theonshore UK. Egdon also has exploration interests in the offshore UK and France.Egdon's shares are traded on the AIM market. The Company has developed two distinctive businesses; an oil and gas explorationand production business which has a portfolio of twenty exploration licences,and a gas storage business initially focused on the development of a major saltcavern gas storage facility on Portland, Dorset. Egdon plans to demerge the two businesses effective 17 January 2008. In accordance with AIM rules - guidance for mining, oil and gas companies, theinformation contained in this announcement has been reviewed and signed off bythe Joint Managing Director of Egdon Resources Mark Abbott, a Geoscientist withover 21 years experience. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Apr 20197:00 amRNSWressle Planning Inquiry Date
15th Apr 20197:00 amRNSBoard Changes
9th Apr 20197:00 amRNSInterim Results for the Six Months Ended 31 Jan 19
9th Apr 20197:00 amRNSCPR on the Resolution Gas Discovery
28th Mar 20197:00 amRNSSprings Road-1 Reaches Total Depth
14th Mar 20197:00 amRNSPEDL 143 Transfer of Operatorship
11th Mar 20197:00 amRNSSprings Road-1 Operational Update
4th Mar 20197:00 amRNSOperations Update
20th Feb 20193:45 pmRNSCompletion of drilling operations Biscathorpe-2
15th Feb 20198:59 amRNSSprings Road Update
5th Feb 20197:00 amRNSWressle Planning Appeal
25th Jan 20197:00 amRNSGrant of Options
25th Jan 20197:00 amRNSOperations Update - Wressle Planning
22nd Jan 20198:34 amRNSCommencement of drilling at Springs Road
9th Jan 20197:00 amRNSBoard Changes
7th Jan 20191:30 pmRNSCommencement of drilling operations at Biscathorpe
6th Dec 20181:50 pmRNSCorrection: Results of Annual General Meeting
6th Dec 20181:33 pmRNSResults of Annual General Meeting
6th Dec 201811:30 amRNSBiscathorpe Update
3rd Dec 20187:00 amRNSCeres Production Update
28th Nov 20184:15 pmRNSWressle Planning Consent Refused
22nd Nov 20187:00 amRNSWressle Recommended for Approval by Planners
30th Oct 20187:00 amRNSFinal Results
4th Oct 201811:18 amRNSNotification of Results
2nd Oct 201812:49 pmRNSNotification of Major Holdings
4th Sep 20187:00 amRNSHolmwood Update
29th Aug 20189:00 amRNSOperations Update
1st Aug 20184:00 pmRNSPlanning Consent Extension Refused
30th Jul 20187:00 amRNSNotification of Major Holdings
30th Jul 20187:00 amRNSNotification of Major Holdings
30th Jul 20187:00 amRNSPetrichor increases interest in Egdon Resources
24th Jul 20187:00 amRNSHolmwood Update
5th Jul 20182:30 pmRNSWressle Update
4th Jun 20187:00 amRNSAcquisition of interest Wressle & Broughton North
17th May 20183:37 pmRNSResponse to Ministerial Statement on UK Shale Gas
14th May 20181:00 pmRNSNorth Kelsey and Biscathorpe Planning Update
1st May 20187:00 amRNSNotification of Major Holdings
27th Apr 20187:00 amRNSDirectors? Share Dealing
17th Apr 20187:00 amRNSInterim Results
12th Apr 20189:30 amRNSNotification of Interest
11th Apr 201812:08 pmRNSBoard Change
9th Apr 20181:30 pmRNSNorth Kelsey Planning Update
4th Apr 20187:00 amRNSNotification of Interim Results
3rd Apr 20187:00 amRNSFarm-out of interest in PEDL253, Biscathorpe
20th Mar 20187:00 amRNSFarm-out of interests in PEDL253, Biscathorpe
5th Mar 20187:00 amRNSFarmout of interests in PEDL253 Biscathorpe
22nd Feb 20187:00 amRNSEA to award environmental permit for Holmwood well
7th Feb 20184:08 pmRNSNotification of Major Holdings
18th Jan 20187:00 amRNSWressle Forward Plan
5th Jan 20184:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.