Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.265
Bid: 0.26
Ask: 0.27
Change: 0.00 (0.00%)
Spread: 0.01 (3.846%)
Open: 0.265
High: 0.265
Low: 0.265
Prev. Close: 0.265
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

UPDATE ON SLM GOLD PROJECT, ARGENTINA

13 Nov 2014 11:26

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECR

US OTC: MTGDY

UPDATE ON SLM GOLD PROJECT, ARGENTINA

LONDON: 13 NOVEMBER 2014 - ECR Minerals plc is pleased to provide the following update on activities at the SLM gold project in Argentina. The SLM project area is 100% held by ECR’s wholly owned Argentine subsidiary Ochre Mining SA (“Ochre”).

Further to ECR’s announcement of 2 September 2014, assay results from channel, dump, float and rock chip sampling are disclosed in Tables 1 and 2 below. The sampling encompassed the three main prospects within the SLM project area: El Abra, Maestro Agüero and JV-14. Detailed geological mapping of each prospect is continuing and is expected to be complete by the end of 2014.

Highlights from channel sampling at the Maestro Agüero prospect (apparent widths) include 1.60m at 28.44g/t gold (with 0.20m at 62.5g/t gold) and 6.10m at 3.77g/t gold (with 1.10m at 4.86g/t gold). Assays from sampling at the El Abra and JV-14 prospects include 37.80g/t gold (float from El Abra) and 44.90g/t gold (rock chip from JV-14).

A map relating to the sampling results disclosed in this news release may be viewed at:

http://www.ecrminerals.com/q3-2014-ochre-samples-maestro-aguero

The map is for illustration only and should not be relied upon for technical purposes.

Stephen Clayson, Chief Executive Officer of ECR, commented:

“Since activities on the ground in the SLM project area recommenced in January 2014 our understanding of the project has improved significantly. Assay results from sampling which took place during the third quarter of this year are disclosed in the tables below, and are within the range of our expectations. Completion of the current detailed geological mapping exercise later this year will assist in the interpretation of this sampling data and that from prior phases of work, and will help determine the appropriate path forward for SLM in 2015.”

Table 1: Q3 2014 Channel Sampling

Maestro Agüero Prospect

SLM Gold Project, Argentina

Ochre Mining SA

Field Name Sample ID From

(m)

To

(m)

Apparent Width

(m)

Gold (g/t) Description
MACS001 34750 0.00 1.50 1.50 3.60 Vein
MACS002 34751 0.00 1.00 1.00 5.73 Vein
MACS003-A 34753 0.00 1.10 1.10 5.94 Vein
MACS003-B 34754 0.00 1.50 1.50 0.22 Stockwork
MACS003-C1 34755 0.00 1.15 1.15 0.06 Stockwork
MACS003-C2 34756 1.15 3.15 2.00 0.8 Stockwork
MACS003-C3 34757 3.15 5.15 2.00 1.04 Stockwork
MACS003-C4 34758 5.15 7.15 2.00 0.42 Stockwork
MACS003-C5 34759 7.15 7.80 0.65 0.10 Stockwork
Weighted avg. 7.80 0.59
MACS003-D1 34762 0.00 0.50 0.50 1.62 Vein
MACS003-D2 34763 0.50 1.10 0.60 0.10 Selvedge
Weighted avg. 1.10 0.79
MACS004-A 34764 0.00 1.00 1.00 6.58 Vein
MACS004-B1 34765 0.00 1.00 1.00 4.89 Vein
MACS004-B2 34766 1.00 2.00 1.00 0.25 Vein
Weighted avg. 2.00 2.57
MACS004-C1 34767 0.00 1.00 1.00 0.13 Stockwork
MACS004-C2 34768 1.00 2.00 1.00 0.03 Stockwork
MACS004-C3 34769 2.00 3.00 1.00 0.03 Stockwork
MACS004-C4 34770 3.00 4.00 1.00 0.18 Stockwork
MACS004-C5 34771 4.00 5.20 1.20 0.00 Stockwork
Weighted avg. 5.20 0.00
MACS005-A 34773 0.00 1.00 1.00 0.15 Vein
MACS005-B 34774 1.00 2.00 1.00 1.14 Vein
MACS005-C 34775 2.00 3.00 1.00 2.16 Vein
MACS005-D 34776 3.00 4.00 1.00 11.30 Vein
MACS005-E 34777 4.00 5.00 1.00 2.90 Vein
MACS005-F 34778 5.00 6.10 1.10 4.86 Vein
Weighted avg. 6.10 3.77
MACS006 34779 0.00 2.00 2.00 3.88 Vein
MACS007 34780 0.00 1.30 1.30 2.73 Vein
MACS008 34781 0.00 1.00 1.00 0.26 Vein
MACS009-A 34783 0.00 1.00 1.00 0.09 Vein
MACS009-B 34784 1.00 2.00 1.00 0.04 Vein
MACS009-C 34785 2.00 2.70 0.70 0.47 Vein
Weighted avg. 2.70 0.17
MACS0010-A 34786 0.00 1.40 1.40 7.52 Other alteration
MACS0010-B 34787 1.40 3.40 2.00 0.77 Other alteration
MACS0010-C 34788 3.40 5.40 2.00 0.05 Other alteration
Weighted avg. 5.40 2.25
MACS0011-A 34790 0.00 0.50 0.50 1.72 Vein
MACS0011-B 34791 0.50 1.05 0.55 1.27 Vein
Weighted avg. 1.05 1.49
MACS012 34792 0.00 1.20 1.20 10.8 Vein
MACS013 34793 0.00 1.00 1.00 2.12 Vein, other alteration
MACS014-A 34794 0.00 0.50 0.50 12.5 Selvedge
MACS014-B 34795 0.50 1.00 0.50 4.24 Vein
MACS014-C 34796 1.00 1.50 0.50 0.37 Selvedge
Weighted avg. 1.50 5.70
MACS015-A 34797 0.00 0.50 0.50 0.28 Other alteration
MACS015-B 34798 0.50 1.00 0.50 13.9 Vein
Weighted avg. 1.00 7.10
MACS016-A 34799 0.00 0.30 0.30 0.20 Other alteration
MACS016-B 34800 0.30 0.50 0.20 0.04 Vein
Weighted avg. 0.50 0.13
MACS017-A 34802 0.00 0.60 0.60 0.01 Selvedge, other alteration
MACS017-B 34803 0.60 1.00 0.40 0.01 Vein
Weighted avg. 1.00 0.01
MACS018 34804 0.00 1.00 1.00 0.27 Vein
MACS019-A 34805 0.00 0.50 0.50 5.26 Vein
MACS019-B 34806 0.50 1.50 1.00 1.10 Vein
Weighted avg. 1.50 2.49
MACS021 34807 0.00 1.00 1.00 22.50 Vein
MACS022 34808 0.00 1.00 1.00 5.13 Vein
MACS023-A1 34809 0.00 1.00 1.00 24.00 Vein
MACS023-A2 34810 1.00 1.20 0.20 62.50 Vein
MACS023-B 34811 1.20 1.60 0.40 22.50 Selvedge, other alteration
Weighted avg. 1.60 28.44

Table 2: Q3 2014 Dump Select, Float and

Rock Chip Samples

SLM Gold Project, Argentina

Ochre Mining SA

Sample ID Description Gold (g/t)
El Abra prospect
34813 Float 0.10
34814 Dump select 0.02
34815 Float 37.80
34816 Dump select 8.24
34817 Float 0.08
14818 Dump select 0.04
34819 Float 0.10
34820 Dump select 0.04
34822 Dump select 0.01
34823 Float 7.86
34824 Dump select 3.53
34825 Float 0.11
34826 Dump select 0.98
34827 Float 1.80
34828 Dump select 9.40
34829 Dump select 4.01
34830 Dump select 3.56
34831 Dump select 0.38
34832 Dump select 5.38
34833 Dump select 13.10
34834 Dump select 5.42
34835 Dump select 0.35
JV-14
34738 Rock chip - vein 44.90
34739 Dump select 6.71
34740 Rock chip - vein 7.19
34741 Dump select 0.16
34742 Dump select 12.70
34743 Dump select 8.52
34744 Dump select 0.16
34745 Dump select 0.14
34746 Rock chip - selvedge 2.80
34747 Rock chip - vein 0.01
Maestro Agüero
34749 Dump select 4.26
34752 Dump select 7.52
34761 Dump select 11.50
34789 Dump select 4.19

Assay values have been expressed in this news release as g/t (grams per tonne) gold however some values were received from the laboratory as ppm (parts per million) gold. For the purposes hereof ppm and g/t can be considered equivalent.

The content of this news release has been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a director of the Company with more than 40 years of experience in the mining industry.

QA/QC

Sampling was carried out under geological supervision. A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Acme Analytical Laboratories in Santiago, Chile, an internationally accredited analytical laboratory. A quality control system using blanks, duplicates and standards is in use at the laboratory. The assay data reported is considered acceptable in the context of these measures.

Upon arrival at the laboratory the samples were dried, crushed, and split, and a fraction was pulverised. The method of analysis for gold was fire assay (50g charge) with AAS finish. A re-assay with gravimetric finish was carried out where results exceeded the laboratory’s upper detection limit for AAS finish (10ppm gold).

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the Sierra de las Minas gold project in Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR holds a substantial minority stake in THEMAC Resources Group Ltd (TSX-V: MAC), which is focused on the development of the Copper Flat copper-molybdenum-gold-silver porphyry project in New Mexico, USA.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010

Paul Johnson, Non-Executive Chairman

Stephen Clayson, Director & Chief Executive Officer

Richard (Dick) Watts, Technical Director

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550

Emma Earl/David Coffman (Nominated Adviser)

Colin Rowbury (Broker)

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), ECR disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

GLOSSARY

AAS: atomic absorption spectroscopy

alteration: the chemical response of rocks to hydrothermal solutions causing mineralogical change

assay: a test performed on a sample of ores or minerals to determine the amount of valuable metals contained

channel sampling: a sample composed of pieces of rock that have been cut out of a small trench or channel

g: grams

g/t: grams per tonne

m: metre

mesothermal: mesothermal gold deposits are formed from hot water that precipitates gold under high temperatures and pressure, generally at great depths in the earth’s crust

outcrop: an exposure of rock or mineral deposit that can be seen on surface, that is, not covered by soil or water

ppm: parts per million

selvedge: the area of the point of contact between a vein and the surrounding rock

stockwork: a metalliferous deposit characterized by the impregnation of the mass of rock with many small veins or nests irregularly grouped

t: tonne

vein: material which was chemically deposited by fluids within a rock fracture; veins exhibit a range of textures and minerals, depending primarily on the temperature, depth, and composition of the fluid and host rock; may also contain a small amount (

Copyright Business Wire 2014

Date   Source Headline
23rd Apr 202411:48 amRNSResult of AGM
23rd Apr 20247:02 amRNSAGM Statement
18th Apr 20247:05 amRNSSalary Sacrifice, Admission of Shares and TVR
8th Apr 20247:06 amRNSCreswick drill results indicate larger ore bodies
2nd Apr 20247:00 amRNSAnnual Report & Audited Results YE 30th Sept 2023
14th Mar 20247:04 amRNSPlacing raises £585,000 & Joint Broker Appointed
14th Mar 20247:02 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
15th Feb 20241:36 pmRNSBoard Changes
5th Feb 20249:55 amRNSPreliminary findings from Creswick drilling
23rd Jan 20247:03 amRNSBoard Change
15th Jan 202412:46 pmRNSFurther re the sale of Non-Core Assets
10th Jan 20247:04 amRNSReview of Lolworth Project
18th Dec 20237:05 amRNSSale of Non-Core Assets
14th Dec 20237:01 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
12th Dec 202310:50 amRNSDrilling Underway at the Creswick Project
11th Dec 20237:04 amRNSUpdate on Planned Drilling at Creswick
1st Dec 20237:18 amRNSSalary Sacrifice Share Admission and TVR
24th Nov 20231:18 pmRNSECR Board members attending Mines and Money
20th Nov 20237:04 amRNSLolworth Results Suggest Extended Mineralisation
16th Nov 202310:55 amRNSCorrection - Director Share Agreements
16th Nov 20237:36 amRNSUpdate on Drilling & Director Share Agreements
31st Oct 20237:05 amRNSGold Bearing Quartz Veins Discovered at Lolworth
23rd Oct 20237:04 amRNSEncouraging Gold Results from Lolworth Project
20th Oct 20235:09 pmRNSCancellation of Share Options
20th Oct 20234:56 pmRNSTermination of option to acquire Hurricane Project
6th Oct 20234:08 pmRNSResult of General Meeting & Total Voting Rights
5th Oct 20237:05 amRNSHurricane: Final Rock Chip Results & Prospectivity
2nd Oct 20237:04 amRNSHurricane Option Extension & Rock Chip Results
27th Sep 202311:07 amRNSAdditional License Application at Kondaparinga
25th Sep 20239:18 amBUSExtended Gold Prospectivity and Niobium Bullseye Discovery at the Lolworth Project
21st Sep 202310:34 amBUSAsset Overview and Evaluation
19th Sep 20237:34 amBUSPosting of Circular, Notice of GM, Directors Share Agreements & PDMR Dealing
18th Sep 20237:04 amBUSConditional Fundraise of £580,000 & Proposed General Meeting
15th Sep 20231:12 pmBUSBoard and Management Changes
15th Aug 20233:09 pmBUSGold & Niobium Rock Chip Results from the Lolworth Project
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.