Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCleantech Lithium Regulatory News (CTL)

If you are a professional, HNW or sophisticated investor and want to learn more about the current investment opportunity in Peloton Minerals, please submit your details here.

Share Price Information for Cleantech Lithium (CTL)

Share Price is delayed by 15 minutes
Get Live Data
5.85    0.00 (0.00%)
Bid:
5.70
Ask:
6.00
Spread: 0.30 (5.263%)
Market Cap: £18.02m
CTL Live PriceLast checked at - London Stock Exchange

Intraday Cleantech Lithium Share Chart

Resource Upgrade

13 Sep 2022 10:49

RNS Number : 2793Z
CleanTech Lithium PLC
13 September 2022
 

13.09.22

 

CleanTech Lithium PLC ("CleanTech Lithium" or the "Company")

Resource Upgrade at Laguna Verde Project to 1.51 Million Tonnes of Lithium

 

CleanTech Lithium PLC (AIM:CTL), an exploration and development company advancing the next generation of sustainable lithium projects in Chile, announces an upgraded JORC resource estimate of 1.51 million tonnes of lithium carbonate equivalent ("LCE") at a grade of 206mg/L lithium at its Laguna Verde project, with the majority of the resource upgraded from Inferred to the higher confidence categories of Measured and Indicated.

The upgraded resource estimate provides the basis for undertaking a Pre-feasibility Study ("PFS") at Laguna Verde, planned to commence 4Q 2022, as the Company continues to develop its projects towards producing carbon neutral lithium for the EV market. The PFS is expected to evaluate a base case production rate of 20,000 tonnes per annum of battery grade lithium, with the resource of 1.51 million tonnes LCE providing the basis for a >30-year operation.

Highlights:

· Resource drill programme, comprising four holes, was completed 1H 2022 with the resource upgrade based on three of the four holes sampled prior to the Chilean winter break

· JORC compliant resource estimate increased by 22% to 1.51 million tonnes LCE at a grade of 206mg/L with 53% of the resource now in the Measured and Indicated category (0.803 million tonnes LCE)

· On track to be further upgraded as follows:

in Q4 2022 based on data from all four holes which is expected to increase both resource size and grade, and

in 1H 2023 from an infill drill programme planned to commence in the next few weeks

· The deepest hole in the programme recorded lithium grades up to 409mg/L at the bottom of the hole indicating drilling to depth provides further upside

· Laguna Verde is globally the shallowest lithium resource with a geothermal heat source with brine temperatures of 20oC - 30oC starting within 65m of the surface

· This is in the optimal temperature range for the direct lithium extraction ("DLE") adsorption process based on test-work by key technical partners SunResin and Beyond Lithium

· Heating brine can be a significant component of a DLE plant´s energy consumption and operating costs

· Feasibility studies will evaluate the impact of this geothermal influence on reducing operating costs and the environmental footprint of the project

· A Scoping Study for the project is expected to be completed in October/November 2022

· For the Company´s second project, Francisco Basin, a maiden Inferred resource estimate is expected in the coming weeks, based on the results of the first drill hole completed at the project, which had an average lithium grade of 305mg/L

Commenting, Aldo Boitano, Chief Executive Officer, of Cleantech Lithium PLC, said: "We are very pleased with this upgrade in the Laguna Verde resource estimate to 1.51 million tonnes of LCE with more than half of the resource now in the Measured + Indicated category, providing much higher confidence in the resource potential of the asset. The resource estimate now provides the basis for a Pre-feasibility Study with a base case production rate of 20,000 tonnes LCE per annum, expected to utilise 100% renewable energy for process power providing green lithium to the EV industry. Laguna Verde is unique in being a geothermal influenced brine resource starting from near surface, which we think will positively impact operating costs and reduce the environmental footprint.

"Further upgrades are planned in 4Q 2022 and 1H 2023 based on fieldwork to commence in the next few weeks. We look forward to continuing to update the market on our progress."

 

Please click on the following link to see the entire announcement:http://www.rns-pdf.londonstockexchange.com/rns/2793Z_1-2022-9-13.pdf

 

For further information contact:

 

 

 

CleanTech Lithium PLC

 

 

Aldo Boitano/Gordon Stein

Jersey office: +44 (0) 1534 668 321

Chile office: +562-32239222

Or via Celicourt

 

Celicourt Communications

+44 (0) 20 8434 2754

Felicity Winkles/Philip Dennis

 

 

cleantech@celicourt.uk

 

Beaumont Cornish Limited

(Nominated Adviser)

Roland Cornish

 

+44 (0) 207 628 3396

 

Fox-Davies Capital Limited

(Joint Broker)

Daniel Fox-Davies

 

Canaccord Genuity Limited

(Joint Broker)

James Asensio

Gordon Hamilton

 

 

+44 20 3884 8450

 

daniel@fox-davies.com

 

+44 (0) 207 523 4680

 

 

 

 

 

 

 

 

 

Competent Person

The information in this release relates to drilling results, geology, brine assays reports, sediment sampling / specific yield calculation and resource calculation are based on information compiled by Christian Gert Feddersen Welkner, who is an independent Qualified Person to the Company and is a Member of Comision Calificadora de Competencias en Recursos y Reservas Mineras Chile that is a 'Recognised Professional Organisation' (RPO). Mr Feddersen has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Feddersen consents to the inclusion in the press release of the matters based on his information in the form and context in which it appears.

 

The information communicated within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. Upon publication of this announcement, this inside information is now considered to be in the public domain. The person who arranged for the release of this announcement on behalf of the Company was Gordon Stein, Director and CFO.

 

Notes

 

CleanTech Lithium (AIM:CTL) is an exploration and development company, advancing the next generation of sustainable lithium projects in Chile. The Company's mission is to produce material quantities of battery grade lithium by 2024/2025, with near zero carbon emissions and low environmental impact, offering the EU EV market a green lithium supply solution.

 

CleanTech Lithium has two prospective lithium projects - Laguna Verde and Francisco Basin projects located in the lithium triangle, the world's centre for battery grade lithium production. They are situated within basins entirely controlled by the Company, which affords significant potential development and operational advantages. The projects have direct access to excellent infrastructure and renewable power. The Company has also further applied for an additional 119 exploration licences at Llamara, as a low cost and commitment greenfield project to complement the existing more advanced projects.

 

CleanTech Lithium is committed to using renewable power for processing and reducing the environmental impact of its lithium production by utilising Direct Lithium Extraction. Direct Lithium Extraction is a transformative technology which only removes lithium from brine, with higher recoveries and purities. The method offers short development lead times, low upfront capex, with no extensive site construction and no evaporation pond development so there is no water depletion from the aquifer or harm to the local environment.

 

**ENDS**

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLKXLBFLKLZBBX
Date   Source Headline
30th Jun 20257:05 amRNSUpdate to CEOL Appeal
30th Jun 20257:00 amRNSExtension to Loan Notes Maturity Date
12th Jun 202511:00 amRNSFinal Results
30th Apr 20257:00 amRNSUpdate to CEOL Application
23rd Apr 20257:00 amRNSUpdate to CEOL Process
17th Apr 20257:00 amRNS-RCollaboration with DuPont Water Solutions
10th Apr 20257:00 amRNSAppointment of CEO and Director
4th Apr 20257:00 amRNSCEOL Application Process Update
24th Mar 202512:47 pmRNSResult of GM Admission of Retail Offer Shares TVR
10th Mar 20257:00 amRNSResults of Retail Offer & Update on Broker Option
4th Mar 20254:45 pmRNSNotice of General Meeting and Posting of Circular
28th Feb 20256:17 pmRNSTotal Voting Rights
26th Feb 20257:00 amRNSASX Listing and CEO Designate
21st Feb 20257:00 amRNSExtension of Broker Option and Retail Offer
18th Feb 20257:00 amRNS-RInvestor Meet Company Spotlight Event
17th Feb 20257:00 amRNSRetail Offer to Shareholders
11th Feb 20257:28 amRNSResults of Placing, Issue of Equity and TVR
10th Feb 20254:52 pmRNSProposed interim fundraising and corporate update
20th Jan 20257:00 amRNSLaguna Verde Resource Update
15th Jan 20257:00 amRNSApplication for CEOL Submitted
14th Jan 20258:14 amRNSDownstream Process Produces Lithium Carbonate
31st Dec 20247:00 amRNSCEOL application and amended 2024 interim results
6th Dec 20247:00 amRNSIssue of Equity and TVR
28th Nov 20247:00 amRNSCorporate Update & Appointment of CEO Designate
26th Nov 20242:59 pmRNSResult of AGM, Share Consolidation and TVR
25th Nov 20245:35 pmRNSFurther information re share consolidation
21st Nov 20247:00 amRNSPilot-Scale Lithium Carbonate Production
15th Nov 20242:42 pmRNSHolding(s) in Company
5th Nov 20247:00 amRNSLaguna Verde Operational Update
1st Nov 202410:00 amRNSTotal Voting Rights
30th Oct 20241:34 pmRNSNotice of AGM
22nd Oct 20247:00 amRNSUpdate to Laguna Verde Licence Payment Terms
9th Oct 20247:04 amRNSResults of Placing, PDMR Dealing & TVR
8th Oct 20245:03 pmRNSProposed interim fundraising
30th Sep 20247:00 amRNSInterim Results
27th Sep 20247:00 amRNSCEOL Update
20th Sep 20247:00 amRNSUpdate on the ASX Listing
9th Sep 20247:00 amRNSASX-Listing Admission Process Update
2nd Sep 202412:29 pmRNSResults of General Meeting; Update on RFI Process
27th Aug 20244:10 pmRNSTransfer of Loan Notes at Regal Funds
27th Aug 20247:00 amRNSReplacement ASX Prospectus
13th Aug 20247:14 amRNSASX Prospectus, Proposed Fundraise & Notice of GM
22nd Jul 20247:00 amRNSDLE Pilot Plant First Stage Production & Results
2nd Jul 20247:00 amRNSPFS Plant Location Study Results
1st Jul 20247:00 amRNSBridging Loan & Termination Convertible Loan Notes
25th Jun 20247:00 amRNSExpressions of Interest Submitted
29th May 20247:00 amRNSInauguration of DLE Pilot Plant
23rd May 20247:00 amRNSOperations Update
21st May 20247:00 amRNSFinal Results
15th May 20247:00 amRNSInvestor Presentation via Investor Meet Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.