The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCRC.L Regulatory News (CRC)

  • There is currently no data for CRC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

7 Feb 2006 07:00

0700hrs 7th February 2006 COPPER RESOURCES CORPORATION ("CRC") COMPLETION OF 25% OF HINOBA-AN (PHILIPPINES) INFILL DRILLING PROGRAMME POINTS TO 10% IMPROVEMENT IN OVERALL GRADE COPPER RESOURCES CORPORATION ("CRC") HighlightsThe 15 holes thus far completed of the infill drilling programme on the DJPor-phyry Copper Deposit, which represent almost 25% of the total of 62 to bedrilled, were chosen to test the central portion of the deposit containing thebest copper grades. Assay results show that: * mineralisation continuity and limits along completed sections generally confirms results of the 1998 scoping study; * top of mineralisation is at a depth of 6-9 metres, which is an improvement on the results of the scoping study in which the first 15 metres below the surface was discounted and not assayed; * overall improvement in the scoping study grades in the vicinity of the new holes could be in the order of 10%, which will be verified by modelling and resource estimations when approximately half the programme is completed in approximately six weeks; and the entire infill drilling programme is expected to be completed by the end of May. Drilling ResultsFinal assay results have now been received for holes CDD-005 to CDD-014 andCDD-016, with approximately 25% of the planned programme of 62 holes now beingcompleted. Intersections from these holes, in addition to those from holesCDD-001 to CDD-004 as released earlier are listed in Table 1 below.These holes have been collared near the centre of the DJ Porphyry CopperDeposit, and are part of a programme of 11,800m in 62 holes designed to infillthe 59,000 metres of earlier drilling. The holes are being drilled at 50mcenters along grid east-west section lines intermediate to the 100m spacedlines of previous workers, to give a final drillhole spacing of approximately50m x 50mOne of the purposes of the current drilling is to confirm the continuity,limits and grade of mineralisation as interpreted from previous work. To datedrilling has been completed on two cross sections, 1550N and 1650N, bothlocated near the centre of the DJ mineralisation, with drilling continuing onadjacent sections.The results from holes on the completed sections support the interpretations ofprevious work, confirming that the western and eastern margins of the systemare diffuse with a gradual reduction in copper grade, with the base of themineralisation being faulted and exhibiting a sharp grade cut-off. Coppergrades within the porphyry mineralisation exhibit good continuity.A preliminary analysis indicates that generally Cu assay results are at leastas good as, and in some cases an improvement on calculated grades on thesesections. It is possible that the resource grade may be increased by up to 10%,however no definite conclusion can be made until modelling and preliminarygrade estimation work is carried out when approximately half the drillingprogramme is completed.More notable intersections in the current programme include 207m at 0.50% Cufrom 3m in hole CDD-001, 165m at 0.49% Cu from surface in hole CDD-004, 189m at0.55% Cu from 9m in hole CDD-007, 210m at 0.45% Cu from 6m in hole CDD-008 and174m at 0.50% Cu from 3m in hole CDD-010.Previous work on the deposit generally discounted the top 15 metres, withassaying generally not being carried out in this zone. One of the aims of thecurrent work programme is to ascertain the potential of this zone; the latestresults indicate that from approximately six to nine metres below the surfacemineralisation is present and continuous.Table 1: Cu IntersectionsHole Interval Length Cu% CDD-001(1) 3m to 210m 207 0.50 including(2) 24m to 39m 15 0.86 including(2) 45m to 60m 15 0.65 including(2) 156m to 171m 15 0.73 including(2) 177m to 195m 18 0.63 CDD-002(1) 6m to 141m 135 0.44 including(2) 57m to 96m 39 0.71 CDD-003(1) 9m to 126m 117 0.45 CDD-003(1) 144m to 174m 30 0.33 CDD-004(1) 0m to 165m 165 0.49 including(2) 3m to 30m 27 0.70 including(2) 51m to 66m 15 0.61 including(2) 111m to 153m 42 0.62 CDD-005(1) 9m to 66m 57 0.46 CDD-005(1) 78m to 219m 141 0.44 including(2) 87m to 153m 66 0.51 including(2) 162m to 177m 15 0.53 CDD-006(1) 15m to 54m 39 0.83 including(2) 15m to 51m 36 0.87 including(3) 15m to 21m 6 1.81 CDD-006(1) 69m to 204m 135 0.47 including(2) 69m to 99m 30 0.55 including(2) 171m to 189m 18 0.62 CDD-007(1) 9m to 198m 189 0.55 including(2) 9m to 27m 18 0.66 including(2) 39m to 96m 57 0.61 including(2) 120m to 183m 63 0.66 CDD-008(1) 6m to 216m 210 0.45 including(2) 6m to 27m 21 0.67 including(2) 39m to 57m 18 0.54 including(2) 108m to 123m 15 0.60 including(2) 159m to 192m 33 0.51 CDD-009(1) 15m to 108m 93 0.26 CDD-009(1) 141m to 189m 48 0.24 CDD-010(1) 3m to 177m 174 0.50 including(2) 3m to 30m 27 0.65 including(2) 48m to 93m 45 0.67 including(2) 105m to 132m 27 0.56 CDD-012(1) 3m to 63m 60 0.45 including(2) 3m to 36m 33 0.58 CDD-012(1) 72m to 114m 42 0.47 CDD-013(1) 3m to 57m 54 0.53 including(2) 6m to 27m 21 0.71 CDD-014(1) 42m to 78m 36 0.30 CDD-016(1) 6m to 66m 60 0.40 CDD-016(1) 99m to 141m 42 0.46 including(2) 111m to 141m 30 0.54 (1) Calculated using a 0.20% Cu cutoff(2) Calculated using a 0.50% Cu cutoff(3) Calculted using a 1% Cu cutoffFuture ProgrammeThe Bankable Feasibility Study which sets out a programme of 62 holes to amaximum depth of 300m is on schedule to be completed by December 2006.This press release is based on information compiled by Mr. Mark Gordon, a fulltime employee of CRC and a Member of the Australasian Institute of Mining andMetallurgy who qualifies as a Competent Person as defined in the 2004 editionof "The Australasian Code for Reporting of Exploration Results, MineralResources and Ore Reserves". Mr. Gordon has given consent to the inclusion inthis press release of matters based on this information in the form and contextin which they appear.Aged 49, Mr. Bru has over 20 years wide-ranging experience in finance andaccount-ing in a variety of industries in Australia, Asia and Africa. Mr. Bruis conversant in both English andChris Jordinson, CRC's CEO, stated: "Elia Crespo has done an excellent job, butwith projects in Congo, Namibia and the Philippines, the time differenceFor further information please contact: Copper Resources Nabarro Wells & Westhouse GTH Corporation Co. Securities Communications Mitchell Alland Keith Smith Richard Morrison Toby Hall Executive Vice Chairman +44 (0) +44 (0) +44(0) +44 (0) 77 4801 8690 20 7710 7400 20 7601 6100 20 7153 8035 COPPER RESOURCES CORPORATION
Date   Source Headline
13th Apr 20177:00 amRNSValuation and Trading update
7th Dec 20167:00 amRNSHalf-year Report
3rd Oct 20167:00 amRNSAgreement of new lease with Compass Group
22nd Sep 20161:27 pmRNSResult of AGM
26th Aug 20167:00 amRNSNotice of AGM
23rd Aug 20167:00 amRNSResults for the four months to 31 March 2016
27th Jun 201612:04 pmRNSAgreement of £50 million facility with RBS
12th May 20167:00 amRNSTrading Update and Dividend Declaration
14th Mar 20169:35 amRNSAdmission of ordinary shares
16th Feb 20167:00 amRNSAdmission to AIM and First Day of Dealings
24th Feb 200912:38 pmPRNCancellation of Admission to Trading on AIM
10th Feb 20099:16 amPRNStatement re CRC announcement & further cautionary
10th Feb 20097:00 amRNSCircular re General Meeting
6th Feb 200910:50 amRNSMining Title Licence Review
6th Feb 20097:00 amRNSStatement re Financial and Operational Update
29th Jan 200911:08 amPRNBoard Resignation
24th Dec 200810:27 amRNSChange of Adviser
12th Dec 20084:02 pmPRNOperational and Financial Update
11th Dec 20081:53 pmRNSComment re Copper Resources Corporation
10th Dec 200812:21 pmRNSFurther re CAMEC's shareholding
27th Nov 20087:56 amPRNAnnual General Meeting Statement
6th Nov 20088:31 amPRNNotice of Annual General Meeting
30th Sep 20086:15 pmPRNUnaudited Interim Report
1st Jul 20087:00 amPRNProject Finance Facility
30th Jun 20085:36 pmPRNFinal Results
30th Jun 20083:26 pmPRNDirectorate Change
14th May 200812:13 pmPRNEXERCISE OF OPTIONS
2nd May 20088:02 amPRNChange in Shareholdings
1st May 20087:01 amRNSIncreased Interest in CRC
30th Apr 200812:04 pmPRNCorrection: Change in Shareholdings
30th Apr 200811:29 amPRNChange in Shareholdings
30th Apr 20088:00 amPRNAcquisition of additional interest in CRC
22nd Apr 200810:18 amPRNChange in Shareholdings
6th Mar 20081:40 pmPRNEXERCISE OF OPTIONS
4th Mar 20089:36 amPRNEXERCISE OF OPTIONS
3rd Mar 20089:51 amPRNCOPPER RESOURCES CORPORATION
27th Feb 20082:32 pmPRNCorrection: Board Changes
27th Feb 20081:47 pmPRNBoard Changes
19th Feb 200810:19 amPRNEXERCISE OF OPTIONS
7th Feb 20082:00 pmPRNEXERCISE OF OPTIONS
22nd Jan 20088:50 amPRNOffer Lapsed
21st Jan 20082:39 pmPRNCRC Offer Lapsed
21st Jan 20088:40 amPRNFurther re Offer
16th Jan 200811:09 amPRNDirectorship Appointment
9th Jan 20087:00 amPRNFurther re offer
8th Jan 20089:02 amPRNOffer Update and Offer extended
31st Dec 200711:51 amRNSFurther re Offer
31st Dec 20077:00 amPRNOffer Update and Offer Extended
7th Dec 20075:09 pmPRNFurther re Offer
6th Dec 20079:38 amPRNDoc re Offer for Copper Resources Corporation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.