Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCNG.L Regulatory News (CNG)

  • There is currently no data for CNG

Pakrut Update

11 Aug 2009 07:00

11 August 2009 Kryso Resources plc (`Kryso' or `the Company') Appointment of Beijing General Research Institute of Mining & Metallurgy to Complete Bankable Feasibility Study for the Pakrut Gold Project

Kryso Resources plc is pleased to announce that it has appointed the Beijing General Research Institute of Mining & Metallurgy (`the BGRIMM') to complete the Pakrut gold project bankable feasibility study (`the BFS'). The BFS is targeted for completion before the end of 2009.

About the BGRIMM

The BGRIMM is a highly reputable Chinese consulting group active in the fields of mining engineering, mineral processing and metallurgy, and has completed substantial work for well known international companies including Kazakhmys, El Dorado Gold, SinoGold, ArcelorMittal and Griffin Mining. The BGRIMM is ISO9000 certified.

In completing the Pakrut project BFS the BGRIMM will build on work previously completed by other consultants to Kryso including GeoLogix Mineral Resource Consultants (resources), GBM Minerals Engineering Consultants (metallurgical test work review and preliminary process design), Prime Resources (social and environmental), Scott Wilson Group (tailings dam design), SGS Group (metallurgical test work) and Turgis Mining Consultants (mining and infrastructure).

Trevor Davenport, Non-Executive Chairman and acting Managing Director of Kryso Resources plc, comments:

`The appointment of the BGRIMM, which has an excellent track record of assisting with the development of significant mining projects in a wide range of countries, will enable Kryso to complete a high quality BFS for Pakrut project in a timely and cost effective manner.'

About the Pakrut Gold Project

A bankable feasibility study for the Pakrut gold project based on a mining operation producing in excess of 100,000oz Au per annum with cash costs of approximately US$300/oz Au is currently in progress, and is targeted for completion before the end of 2009. First gold production at Pakrut is targeted for 2011. An internal pre-feasibility study for the project was completed in early 2008, with highly positive results. Estimated cash costs under the internal pre-feasibility study were US$291/oz Au.

The Pakrut gold project's total JORC Code-compliant resources comprise: resources of 21,383,902t estimated across Ore Zones 1, 2, 3 and 7 at an average grade of 2.53g/t for 1,739,029oz Au, assuming a cut-off grade of 0.5g/t; and resources of 5,015,285t estimated across Ore Zones 5, 6, 7, 14 and 16 at an average grade of 1.52g/t for 245,243oz Au, assuming a cut-off grade of 0.5g/t. Total contained gold is therefore estimated to be 1,984,272oz Au.

Total JORC Code-compliant resources of 13,412,109t at an average grade of 2.71g /t for 1,167,789oz Au, assuming a cut off grade of 0.5g/t, fall into the JORC Measured and Indicated categories.

The total resources of the Pakrut gold project under the Russian classification system stand at 26,211,495t at an average grade of 2.44g/t for 2,055,047oz Au, assuming a cut-off grade of 0.5g/t. This includes total reserves of 14,910,748t at an average grade of 2.65g/t for 1,257,454oz Au, assuming a cut-off grade of 0.5g/t.

For further information please contact:

Dr. Trevor Davenport/Craig Brown, Kryso Resources plc.

Tel: 020 7371 0600

Brett Miller, Ruegg & Co Limited.

Tel: 020 7448 4498

Christian Dennis, Orbis Equity Partners Ltd.

Tel: 0203 137 1902

Jason Bahnsen, Fox-Davies Capital Ltd.

Tel: 020 7936 5200

vendor
Date   Source Headline
29th Jun 20157:00 amBUSOperational Update
20th Apr 20153:28 pmBUSResignation of Non-Executive Chairman and Director
16th Apr 20157:00 amBUSOperational Update
31st Mar 20155:13 pmBUSChange of Adviser
19th Mar 20157:00 amBUSIssue of Equity
18th Feb 20157:00 amBUSDirectors' Dealings
17th Feb 20157:00 amBUSDirectors' Dealings
9th Feb 20157:00 amBUSOperational Update
28th Jan 20152:06 pmBUSHong Kong Listing Update
19th Jan 20157:00 amBUSDirectors' Dealings
6th Jan 20151:04 pmBUSHong Kong Listing Update
6th Nov 20144:40 pmRNSSecond Price Monitoring Extn
6th Nov 20144:35 pmRNSPrice Monitoring Extension
28th Oct 20141:13 pmBUSResult of AGM
6th Oct 20147:00 amBUSChina Nonferrous Gold Limited Notice of AGM, Proposals in Relation to Hong Kong Listing and Posting of Delisting Circular
2nd Oct 20143:55 pmBUSIssue of Equity
10th Sep 20142:11 pmBUSInterim Results for the Six-Month Period Ended 30 June 2014
10th Sep 20141:38 pmBUSFiling of Application Proof Prospectus and Update
2nd Sep 20143:23 pmBUSAward of Consultancy Contracts
7th Aug 20141:57 pmBUSHKEx Listing Update
30th Jun 20147:00 amBUSFinal Results
27th Jun 20149:10 amBUSExternal Power Supply Construction Contract
24th Jun 20141:59 pmBUSMine Construction Agreement
13th Jun 20149:43 amBUSDirectorate Change
12th May 20141:54 pmBUSTermination of Option
17th Apr 201411:59 amBUSExploration Licence
9th Apr 20147:00 amBUSIssue of Shares
11th Mar 20147:00 amBUSOperational Update
7th Mar 201412:15 pmBUSResult of Meeting
17th Feb 20147:00 amBUSPosting of Circular
18th Dec 20137:00 amBUSGrant of Options
21st Nov 20137:00 amBUSChange of Name Update
1st Nov 20137:00 amBUSChange of Name Update
29th Oct 20131:27 pmBUSResult of General Meeting and Change of Name
28th Oct 20137:00 amBUSAppointment of Sponsor for Proposed Hong Kong Listing
11th Oct 20139:19 amBUSChange of Name, Notice of General Meeting
30th Sep 20132:55 pmBUSProposed Change of Name and Board Changes
27th Sep 20137:00 amBUSInterim Results for the Six-Month Period Ended 30 June 2013
14th Aug 201310:43 amBUSAWARD OF CONTRACTS FOR FLOTATION CELLS, CRUSHERS AND BALL MILLS - Replacement
14th Aug 20139:35 amBUSMiscellaneous
8th Aug 201310:13 amBUSAWARD OF EXTERNAL POWER SUPPLY CONSTRUCTION CONTRACT
31st Jul 20138:00 amBUSAdmission to Trading on AIM
30th Jul 201312:56 pmBUSCourt Sanction of Scheme
30th Jul 20137:30 amRNSSuspension - Kryso Resources Plc
29th Jul 20139:53 amBUSTemporary Suspension
1st Jul 20137:00 amBUSResult of AGM
17th Jun 20137:00 amBUSSRK’s Independent Technical Report Endorses Updated BFS Compiled by BGRIMM
7th Jun 20135:10 pmBUSFinal Results
24th May 20131:18 pmBUSResults of Voting at Court Meeting and General Meeting
20th May 20131:55 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.