Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCNG.L Regulatory News (CNG)

  • There is currently no data for CNG

Pakrut Update

11 Aug 2009 07:00

11 August 2009 Kryso Resources plc (`Kryso' or `the Company') Appointment of Beijing General Research Institute of Mining & Metallurgy to Complete Bankable Feasibility Study for the Pakrut Gold Project

Kryso Resources plc is pleased to announce that it has appointed the Beijing General Research Institute of Mining & Metallurgy (`the BGRIMM') to complete the Pakrut gold project bankable feasibility study (`the BFS'). The BFS is targeted for completion before the end of 2009.

About the BGRIMM

The BGRIMM is a highly reputable Chinese consulting group active in the fields of mining engineering, mineral processing and metallurgy, and has completed substantial work for well known international companies including Kazakhmys, El Dorado Gold, SinoGold, ArcelorMittal and Griffin Mining. The BGRIMM is ISO9000 certified.

In completing the Pakrut project BFS the BGRIMM will build on work previously completed by other consultants to Kryso including GeoLogix Mineral Resource Consultants (resources), GBM Minerals Engineering Consultants (metallurgical test work review and preliminary process design), Prime Resources (social and environmental), Scott Wilson Group (tailings dam design), SGS Group (metallurgical test work) and Turgis Mining Consultants (mining and infrastructure).

Trevor Davenport, Non-Executive Chairman and acting Managing Director of Kryso Resources plc, comments:

`The appointment of the BGRIMM, which has an excellent track record of assisting with the development of significant mining projects in a wide range of countries, will enable Kryso to complete a high quality BFS for Pakrut project in a timely and cost effective manner.'

About the Pakrut Gold Project

A bankable feasibility study for the Pakrut gold project based on a mining operation producing in excess of 100,000oz Au per annum with cash costs of approximately US$300/oz Au is currently in progress, and is targeted for completion before the end of 2009. First gold production at Pakrut is targeted for 2011. An internal pre-feasibility study for the project was completed in early 2008, with highly positive results. Estimated cash costs under the internal pre-feasibility study were US$291/oz Au.

The Pakrut gold project's total JORC Code-compliant resources comprise: resources of 21,383,902t estimated across Ore Zones 1, 2, 3 and 7 at an average grade of 2.53g/t for 1,739,029oz Au, assuming a cut-off grade of 0.5g/t; and resources of 5,015,285t estimated across Ore Zones 5, 6, 7, 14 and 16 at an average grade of 1.52g/t for 245,243oz Au, assuming a cut-off grade of 0.5g/t. Total contained gold is therefore estimated to be 1,984,272oz Au.

Total JORC Code-compliant resources of 13,412,109t at an average grade of 2.71g /t for 1,167,789oz Au, assuming a cut off grade of 0.5g/t, fall into the JORC Measured and Indicated categories.

The total resources of the Pakrut gold project under the Russian classification system stand at 26,211,495t at an average grade of 2.44g/t for 2,055,047oz Au, assuming a cut-off grade of 0.5g/t. This includes total reserves of 14,910,748t at an average grade of 2.65g/t for 1,257,454oz Au, assuming a cut-off grade of 0.5g/t.

For further information please contact:

Dr. Trevor Davenport/Craig Brown, Kryso Resources plc.

Tel: 020 7371 0600

Brett Miller, Ruegg & Co Limited.

Tel: 020 7448 4498

Christian Dennis, Orbis Equity Partners Ltd.

Tel: 0203 137 1902

Jason Bahnsen, Fox-Davies Capital Ltd.

Tel: 020 7936 5200

vendor
Date   Source Headline
8th May 20137:36 amBUSIntroduction of a New Aim-Listed Holding Company, Incorporated in the Cayman Islands
18th Feb 20137:00 amBUSUPDATE ON CONSTRUCTION OF PAKRUT GOLD PROJECT
8th Feb 20137:00 amBUSIssue of Equity
3rd Jan 201310:53 amBUSIssue of Shares
25th Oct 20126:13 pmBUSIssue of Shares
28th Sep 20122:27 pmBUSIssue of Shares
28th Sep 20122:01 pmBUSIssue of Shares
28th Sep 201212:23 pmBUSIssue of Options
19th Sep 20127:00 amBUSHalf-yearly Report
13th Sep 20124:29 pmBUSIssue of Shares
24th Aug 201211:20 amBUSMINE CONSTRUCTION AGREEMENT AWARDED
8th Aug 20126:00 pmBUSIssue of Equity
18th Jul 201212:14 pmBUSIssue of Equity
29th Jun 201211:22 amBUSResults of AGM, Changes to Directors' Offices
7th Jun 20127:00 amBUSFinal Results and Notice of AGM
25th May 20127:00 amBUSConfirmation of Debt Financing and Takeover Code
9th May 20127:00 amBUSTotal JORC Mineral Resource passes 5,000,000 oz Au
2nd Apr 20127:00 amBUSFurther Positive Drilling Results from the Pakrut Licensed Area
29th Mar 20121:53 pmBUSChange of Name of Nominated Advisor
2nd Mar 201210:58 amBUSIssue of Shares
14th Feb 20121:47 pmBUSPakrut Project Debt Financing Approved by Export - Import Bank of China
9th Jan 20127:00 amBUSIssue of Licence/Issue of Shares
23rd Dec 20117:00 amBUSIssue of Shares/Directors Dealing
11th Nov 20114:50 pmBUSIssue of Shares
10th Nov 20117:00 amBUSGovernment Approves Issue of Pakrut Mining Licence
9th Nov 20112:42 pmBUSIssue of Equity
8th Nov 20117:00 amBUSChange of Adviser
27th Oct 201111:57 amBUSHolding(s) in Company
19th Oct 201112:10 pmBUSHolding(s) in Company
18th Oct 201110:18 amBUSHolding(s) in Company
17th Oct 20117:00 amBUSIssue of Shares
14th Oct 201111:58 amBUSHolding(s) in Company
27th Sep 201111:10 amBUSHalf-yearly Report
1st Sep 201112:16 pmBUSOperational Update
9th Aug 201110:40 amBUSIssue of Equity
8th Jul 201112:37 pmBUSIssue of Shares
8th Jul 201111:41 amBUSIssue of Incentive Options
4th Jul 201111:39 amBUSChange of Registered Office
30th Jun 20111:21 pmBUSResult of AGM
24th Jun 20111:17 pmBUSIssue of Equity
9th Jun 20117:00 amBUSFinal Results
5th May 20112:27 pmBUSIssue of Equity
15th Apr 20117:00 amBUSTotal JORC Resources Increased
8th Apr 20117:00 amBUSChange of Nomad
31st Mar 20112:46 pmBUSTotal Voting Rights
24th Mar 20117:00 amBUSUpdate on progress and appointment of COO
22nd Mar 20117:00 amBUSDrilling Report
15th Mar 201112:42 pmBUSIssue of Shares
8th Mar 20117:00 amBUSOffer of Finance
4th Mar 20113:14 pmBUSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.