If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCNG.L Regulatory News (CNG)

  • There is currently no data for CNG

Pakrut Update

11 Aug 2009 07:00

11 August 2009 Kryso Resources plc (`Kryso' or `the Company') Appointment of Beijing General Research Institute of Mining & Metallurgy to Complete Bankable Feasibility Study for the Pakrut Gold Project

Kryso Resources plc is pleased to announce that it has appointed the Beijing General Research Institute of Mining & Metallurgy (`the BGRIMM') to complete the Pakrut gold project bankable feasibility study (`the BFS'). The BFS is targeted for completion before the end of 2009.

About the BGRIMM

The BGRIMM is a highly reputable Chinese consulting group active in the fields of mining engineering, mineral processing and metallurgy, and has completed substantial work for well known international companies including Kazakhmys, El Dorado Gold, SinoGold, ArcelorMittal and Griffin Mining. The BGRIMM is ISO9000 certified.

In completing the Pakrut project BFS the BGRIMM will build on work previously completed by other consultants to Kryso including GeoLogix Mineral Resource Consultants (resources), GBM Minerals Engineering Consultants (metallurgical test work review and preliminary process design), Prime Resources (social and environmental), Scott Wilson Group (tailings dam design), SGS Group (metallurgical test work) and Turgis Mining Consultants (mining and infrastructure).

Trevor Davenport, Non-Executive Chairman and acting Managing Director of Kryso Resources plc, comments:

`The appointment of the BGRIMM, which has an excellent track record of assisting with the development of significant mining projects in a wide range of countries, will enable Kryso to complete a high quality BFS for Pakrut project in a timely and cost effective manner.'

About the Pakrut Gold Project

A bankable feasibility study for the Pakrut gold project based on a mining operation producing in excess of 100,000oz Au per annum with cash costs of approximately US$300/oz Au is currently in progress, and is targeted for completion before the end of 2009. First gold production at Pakrut is targeted for 2011. An internal pre-feasibility study for the project was completed in early 2008, with highly positive results. Estimated cash costs under the internal pre-feasibility study were US$291/oz Au.

The Pakrut gold project's total JORC Code-compliant resources comprise: resources of 21,383,902t estimated across Ore Zones 1, 2, 3 and 7 at an average grade of 2.53g/t for 1,739,029oz Au, assuming a cut-off grade of 0.5g/t; and resources of 5,015,285t estimated across Ore Zones 5, 6, 7, 14 and 16 at an average grade of 1.52g/t for 245,243oz Au, assuming a cut-off grade of 0.5g/t. Total contained gold is therefore estimated to be 1,984,272oz Au.

Total JORC Code-compliant resources of 13,412,109t at an average grade of 2.71g /t for 1,167,789oz Au, assuming a cut off grade of 0.5g/t, fall into the JORC Measured and Indicated categories.

The total resources of the Pakrut gold project under the Russian classification system stand at 26,211,495t at an average grade of 2.44g/t for 2,055,047oz Au, assuming a cut-off grade of 0.5g/t. This includes total reserves of 14,910,748t at an average grade of 2.65g/t for 1,257,454oz Au, assuming a cut-off grade of 0.5g/t.

For further information please contact:

Dr. Trevor Davenport/Craig Brown, Kryso Resources plc.

Tel: 020 7371 0600

Brett Miller, Ruegg & Co Limited.

Tel: 020 7448 4498

Christian Dennis, Orbis Equity Partners Ltd.

Tel: 0203 137 1902

Jason Bahnsen, Fox-Davies Capital Ltd.

Tel: 020 7936 5200

vendor
Date   Source Headline
4th Feb 20112:51 pmBUSIssue of Equity
21st Jan 20112:10 pmBUSDirectorate Change
11th Jan 201110:35 amBUSKryso Signs Agreement with China Non-Ferrous Metals International Mining Co. Ltd. ("CNMIM")
10th Jan 20117:00 amBUSUpdate
9th Dec 20102:25 pmBUSDirectorate Change
30th Nov 20109:55 amBUSTotal Voting Rights
3rd Nov 20104:27 pmBUSIssue of Equity
1st Nov 20103:51 pmBUSPosting of Circular
29th Oct 20102:41 pmBUSTotal Voting Rights
28th Oct 20103:29 pmBUSCNMIM receives PRC consent for placing
27th Oct 20102:54 pmBUSNotice of change in shareholdings
20th Oct 201012:46 pmBUSIssue of Equity
14th Oct 201011:17 amBUSPakrut Bankable Feasibility Study Results
11th Oct 20108:14 amPRNIssue of Shares
1st Oct 201010:10 amBUSBFS publication date comfirmed
28th Sep 20106:02 pmBUSExtension of CNMIM Transaction Long Stop Date
24th Sep 20109:09 amPRNIssue of Equity
22nd Sep 20101:35 pmPRNInterim Results
17th Sep 201010:11 amPRNApproval of Kryso Subscription Agreement
15th Sep 20108:49 amPRNIssue of Equity
3rd Sep 20107:39 amPRNExercise of Warrants
2nd Sep 20107:36 amPRNUpdate on Proposed Issue of Equity
5th Aug 20107:00 amPRNDirectorate Change
5th Aug 20107:00 amPRNDirectorate Change
30th Jul 201012:28 pmPRNTotal Voting Rights
30th Jul 201012:28 pmPRNTotal Voting Rights
28th Jul 20107:00 amPRNProposed Issue of Equity and potential project finance
16th Jul 201011:18 amRNSQuarterly Activity Report
6th Jul 20107:45 amPRNExercise of Warrants
2nd Jul 20104:24 pmPRNDirectorate Change
2nd Jul 20104:08 pmPRNDirectorate Change
29th Jun 20107:05 amPRNUpdate to Exclusivity Period
28th Jun 20107:00 amPRNTotal JORC Resources at Pakrut increased
23rd Jun 20102:28 pmPRNNatasa's Request for Board Representation
23rd Jun 201010:24 amRNSFurther re: Kryso board representation
22nd Jun 20107:00 amPRNExclusivity Period
21st Jun 20104:21 pmPRNIssue of Equity
15th Jun 201010:32 amPRNDirectorate Change
11th Jun 20104:03 pmPRNHolding(s) in Company
11th Jun 20101:36 pmRNSAcquisition of significant stake in Kryso
10th Jun 20108:28 amPRNProgress Update
7th Jun 20102:41 pmPRNFinal Results
21st May 20103:10 pmPRNDirectorate Change
20th Apr 201012:25 pmPRNFurther Excellent Drill Intersections from Pakrut
13th Apr 20107:45 amPRNExercise of Warrants
31st Mar 20101:14 pmPRNPakrut Bankable Feasibility Study Update
30th Mar 201011:51 amPRNHolding(s) in Company
18th Mar 20107:41 amPRNExercise of Warrants
9th Mar 201010:36 amPRNHolding(s) in Company
4th Mar 20104:22 pmPRNIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.