Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCloudified Holdings Limited Regulatory News (CHL)

  • This share is currently suspended. It was suspended at a price of 2.25

Share Price Information for Cloudified Holdings Limited (CHL)

Share Price is delayed by 15 minutes
Get Live Data
2.25    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £334.79k
CHL Live PriceLast checked at - London Stock Exchange

Intraday Cloudified Holdings Limited Share Chart

Project Update

27 May 2008 07:00

RNS Number : 2384V
Churchill Mining plc
27 May 2008
 



27th May 2008 AIM:CHL

CHURCHILL MINING PLC

("Churchill" or "the Company")

CHURCHILL RAISES COAL RESERVE TARGET BY 50% AT EAST KUTAI COAL PROJECT

Highlights

Coal reserve target at East Kutai project increased by 50% to 150 Mt

1st potential mine-pit area drilling expected to be completed in 3 months

Annual drilling programme ahead in terms of metres drilled versus results gained

Review of total initial coal resource target underway

Scoping study on schedule for completion end of June 2008

Churchill Mining (AIM: CHL) is pleased to announce that as part of the ongoing review of the drilling and exploration programme at its East Kutai Coal Project (EKCP), the company has lifted its overall project initial coal reserve target by 50% from 100 Mt to 150 Mt. 

A review of the total initial coal resource target is also being conducted and Churchill will advise the market of the result in due course.

The Company, under guidance from its coal-competent advisors, is now deploying 2 of its rigs to concentrate on an intensive drilling programme covering an area approximately 6 kms by 2 kms, which has the potential to form part of the project's first mine-pit. The mine-pit target drilling is in an area that includes part of the new blocks added to the project in April, 2008. The 6,200m of drilling in the mine-pit target area is expected to be completed in 3 months, enabling calculations on the mining reserve to be brought forward. 

The drilling programme is well ahead in terms of metres-drilled versus results-gained with 9,000 metres drilled to date against the annual plan to drill 65,000 metres.

A third rig continues drilling at the southern extension of the current drilling area at EKCP, expanding the coal resource and determining potential areas for any further mine-pits. A fourth rig is expected to be added in due course.

Trans Tek Engineering is in the process of completing the General Scoping Study on the EKCP, with emphasis on the transportation and infrastructure requirements from mine-site to portThe results of the Study are expected to be completed at the end of June and no technical hurdles have arisen that would prevent a coal mine from being developed. 

Paul G. Mazak, Churchill's Managing Director, commented:

 "Churchill is still ahead of schedule and ahead of budget in its exploration programme. The Company is very focused on getting to a mining reserve as quickly as possible so that we can move to mine construction and production". 

ENDS

Enquiries:

Churchill Mining Plc

Managing Director - Paul G. Mazak

+62 81510539186 / + 62 21 39832398 

paul.mazak@churchillmining.com

Blue Oar Securities 

Romil Patel

+44(0)20 7448 4000

Olly Cairns

+61 (0)8 6430 1631

Pelham Public Relations

Candice Sgroi

+44 (0)207 743 6376

Candice.Sgroi@pelhampr.com

In accordance with the AIM Guidelines, Mr Brett Gunter, of PT GMT Services, is the qualified person that has reviewed the technical information contained in this release.

Notes to editors

Churchill Mining Plc listed on AIM in April 2005. 

East Kutai Coal Project

In May 2007 Churchill announced a sales agreement had been entered into to purchase a 75% interest in the East Kutai Coal Project from PT Techno Coal Utama. Churchill has now extended the size of the project by 200 square kilometres by acquiring a 75% interest in the abutting tenements to the west of EKCP from the Investmine Group of IndonesiaExploration and resource drilling continue along with scoping and pre-feasibility work

This initial JORC Resource Statement defining 250 Mt of coal resources more than doubled the amount of coal expected by the end of Q1 2008 and a review of the target coal resource is being completed to see if the goal of 500Mt of coal by the end of 2008 should be increased. 

Drilling now continues to define the 1st potential mining area at the project.

Sendawar - CBM 

The Sendawar CBM project in KalimantanIndonesia, covers more than 800 square kilometres of prospective ground and lies in close proximity to two operating open-cut coal mines. The project is located approximately 50km from the Mahakam River

During Churchill's coal exploration programme, data collected during geophysical and resitivity work, along with data collected from previous oil and gas exploration in the area, indicated that the area was highly prospective for Coal Bed Methane. Churchill (70% of the CBM project) along with its Indonesian partner RMU (30%) were granted Indonesia's first CBM JEA license in September 2007. The CBM project has the potential to host Gas-in-Place of 5.6 trillion cubic feet. Churchill is currently conducting further studies on the CBM project before starting detailed field work.

South Woodie Woodie

Given the increased prospectivity of South Woodie Woodie and Churchill's increasing focus on its Indonesian coal and coal bed methane projects, the Company sold 80% of the project to Australian company Spitfire Resources Limited ("Spitfire").

Spitfire, which listed on the ASX on the 12th December 2007, has the option to purchase the remaining equity in the project but must spend AUD$1.5 million on exploration. Aside from its large shareholding in Spitfire, Churchill also retains a price-indexed mining royalty over the South Woodie Woodie project.  

The South Woodie Woodie project covers approximately 490 square kilometres (with a further 899 square kilometres under application) in the East Pilbara region of Western Australia, and sits approximately 400km southeast of Port Hedland in the highly prospective Pilbara manganese province. Spitfire has identified multiple drill targets and shall begin its new drill programme shortly.

In March 08 Spitfire announced that it had secured the strategic support of the diversified Norwegian-based industrial, trading and metals & alloys group, Tinfos AS ("Tinfos"), as its new major shareholder via a share placement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIIFFTESIRFIT
Date   Source Headline
29th Nov 20167:00 amRNSICSID Arbitration Update
16th Nov 20164:41 pmRNSSecond Price Monitoring Extn
16th Nov 20164:35 pmRNSPrice Monitoring Extension
16th Nov 20162:28 pmRNSICSID Arbitration Update
7th Nov 20167:40 amRNSHolding(s) in Company
7th Nov 20167:40 amRNSHolding(s) in Company
3rd Nov 201610:41 amRNSDirector Shareholding
2nd Nov 20168:00 amRNSPosting of Annual Report and AGM Notice
19th Oct 20162:24 pmRNSFinal Results
11th Oct 20168:57 amRNSBlock Listing Six Monthly Return
6th Oct 20167:00 amRNSBlock Listing Six Monthly Return
15th Sep 20168:00 amRNSBlock listing six monthly return
12th Sep 201612:37 pmRNSICSID Arbitration Update
12th Aug 20169:12 amRNSDirector/PDMR Shareholding
29th Jul 20167:00 amRNSTotal Voting Rights
1st Jul 20163:00 pmRNSIssue of Shares
23rd Jun 20168:00 amRNSBlock listing six monthly return
21st Jun 20169:53 amRNSFurther re forgery dismissal application timing
17th Jun 201612:03 pmRNSUpdate on forgery dismissal application
6th May 20169:30 amRNSResult of General Meeting
5th May 20161:30 pmRNSUpdate on Indonesia's default in ICSID proceedings
29th Apr 201610:00 amRNSTotal Voting Rights
20th Apr 201612:39 pmRNSUpdate on Indonesia's default in ICSID proceedings
14th Apr 20164:40 pmRNSSecond Price Monitoring Extn
14th Apr 20164:35 pmRNSPrice Monitoring Extension
14th Apr 20167:00 amRNSNotice of General Meeting
13th Apr 20164:35 pmRNSPrice Monitoring Extension
13th Apr 201612:05 pmRNSIndonesia defaults in ICSID proceedings
7th Apr 20167:00 amRNSBlock listing six monthly return
4th Apr 20162:00 pmRNSIssue of equity and warrants
31st Mar 201611:00 amRNSTotal Voting Rights
22nd Mar 201612:45 pmRNSHalf Yearly Report
14th Mar 201611:32 amRNSHolding(s) in Company
11th Mar 20167:00 amRNSIssue of Equity and Warrants
2nd Mar 20167:00 amRNSCompany update
1st Feb 20168:20 amRNSTotal Voting Rights
6th Jan 201610:45 amRNSIssue of shares
23rd Dec 20159:15 amRNSResult of AGM and grant of options
23rd Dec 20159:15 amRNSArbitration update
23rd Dec 20157:00 amRNSBlock listing six monthly return
2nd Dec 20158:15 amRNSArbitration update
27th Nov 20155:30 pmRNSPosting of Annual Report and AGM Notice
17th Nov 201511:15 amRNSFinal Results
2nd Nov 201510:00 amRNSTotal Voting Rights
6th Oct 20159:00 amRNSHolding(s) in Company
2nd Oct 20157:00 amRNSIssue of Equity and Warrants
25th Aug 20151:00 pmRNSDirectorate Change
14th Aug 20157:00 amRNSArbitration update
1st Jul 201510:13 amRNSResult of GM
1st Jul 20157:00 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.