Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCGH.L Regulatory News (CGH)

  • There is currently no data for CGH

Update on Definitive Feasibility Study

26 Mar 2014 07:00

RNS Number : 1838D
Chaarat Gold Holdings Ltd
26 March 2014
 

Chaarat Gold Holdings Limited

("Chaarat" or the "Company")

 

Update on Definitive Feasibility Study

 

Road Town, Tortola, British Virgin Islands (26th March 2014)

 

Chaarat (AIM - CGH), the AIM quoted exploration and development company with assets in the Kyrgyz Republic, is pleased to provide an progress update on the Definitive Feasibility Study ("DFS") for the Chaarat Project ("the Project").

 

Highlights

· Contractors have been selected to complete all components of the DFS

· Gustavson Associates ("Gustavson") will be project managers for the DFS as well as preparing the geology, mineral resource and mine design sections

· Resource Development Inc ("RDi") appointed as metallurgical consultants

· Golder Associates (UK) Ltd ("Golder") will provide the geotechnical, hydrological and environmental studies

· GBM Minerals Engineering Consultants Limited ("GBM") will undertake the process and infrastructure engineering for the Project as well as the study on logistics

· DFS on schedule for completion by the end of 2014 and on budget

 

Having completed a rigorous and competitive tender process, the team of consultants to deliver the DFS for the Chaarat Project is now in place. The team will work closely with Mac DeGuire, the Director responsible for the DFS, and with Gustavson, who assisted in the tender process.

 

The resource and reserve model is being updated by Gustavson. The drilling programme completed in the 2013 season will be incorporated into the new model, which is aimed at upgrading the JORC resource from inferred to the indicated and measured categories. Gustavson will also undertake the open pit and underground mine planning.

 

RDi has worked with Chaarat since the Prefeasibility Study which was completed in 2011. They have an unrivalled knowledge of the characteristics of the ore at the Chaarat Project and the results of their work will determine the optimal process plant design and estimates of metallurgical recovery for the mine optimisation and economic analyses. GBM will design the appropriate plant for the process and associated infrastructure for the Project.

 

Golder will undertake in depth investigations of the geotechnical and hydrological data collected to date, and commission additional drilling as required, to underpin the parameters for the mine design to be undertaken by Gustavson, the tailings management facility (to be designed by Golder) and the production facility (to be designed by GBM). The Environmental and Social Impact Assessment ("ESIA") will be prepared by Golder to local and International Finance Corporation ("IFC") standards.

 

Dekel Golan, Chief Executive Officer of Chaarat commented: "Mac DeGuire and Gustavson have assembled a highly experienced and professional team to ensure the DFS is of the quality that the Chaarat Deposit merits. The new team members will be visiting site as soon as it opens at the end of April. We will keep the market updated as work on the DFS progresses.

 

I am pleased that a number of projects in the Kyrgyz Republic have shown progress in recent weeks, as a sign of confidence in the country, following the positive progress made in the resolution of differences between the Kyrgyz Government and Centerra concerning the Kumtor mine.

 

We are looking forward to finalising the Chaarat DFS, moving towards permitting, construction and commencing the building of the next major gold mine in central Asia."

 

Enquiries:

 

Chaarat Gold Holdings Limited

+ 44 23 800 11747/+ 44 20 7499 2612

c/o Central Asia Services Limited

info@chaarat.com

Dekel Golan CEO

Linda Naylor FD

 

Numis Securities Limited

+44 (0) 20 7260 1000

John Prior, Stuart Skinner (NOMAD)

James Black (Broker)

 

 

Further information is available at www.chaarat.com

 

NOTES TO EDITORS:

About Chaarat Gold

 

Chaarat Gold is an exploration and development company operating in the Kyrgyz Republic with a large, high grade resource which is capable of generating low cost gold production - the Chaarat Gold Project.

 

The Company's key objective is to become a low cost gold producer targeting annual production of 200,000 ounces from the development of the Chaarat Gold Project. Chaarat is fully funded to complete a Definitive Feasibility Study (DFS) and continue its active community engagement programme to optimise the value of the Chaarat investment proposition.

Chaarat has several other promising prospects also located within the Kyrgyz Republic.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUBUWUPCGRA
Date   Source Headline
30th Mar 202012:02 pmRNSPrice Monitoring Extension
27th Mar 20207:00 amRNSCOVID-19 response update
5th Mar 20207:00 amRNSAppointment of Joint Broker & Director Holding
26th Feb 20207:00 amRNSManagement Changes
26th Feb 20207:00 amRNSChaarat reinforces management team
24th Feb 20207:00 amRNSDirector/PDMR Shareholding
24th Feb 20207:00 amRNSGrant of waiver
19th Feb 20207:01 amRNSIncrease in Reserves at Tulkubash
19th Feb 20207:00 amRNSFY 2019 Production, Operational & Financial Update
12th Feb 20207:00 amRNSDate Notification
3rd Feb 20207:00 amRNSTotal Voting Rights
20th Jan 20207:00 amRNSIssue of shares, holding in Company & waiver grant
6th Jan 20207:00 amRNSNotification of transactions of directors
27th Dec 20197:00 amRNSStabilization agreement with the Kyrgyz Government
19th Dec 20197:00 amRNSHolding(s) in Company
17th Dec 20197:00 amRNSHolding in Company
16th Dec 20197:00 amRNSHolding(s) in Company
12th Dec 20197:00 amRNSHolding(s) in Company
11th Dec 20197:00 amRNSHolding(s) in Company
9th Dec 20197:00 amRNSHolding in Company
19th Nov 20197:00 amRNSHolding(s) in Company
14th Nov 20197:00 amRNSCompletion of US$5.8 million Equity Capital Raise
11th Nov 20197:00 amRNSKapan Mine Revised Mine Plan and Reserves Update
8th Nov 20197:00 amRNSHolding(s) in Company
8th Nov 20197:00 amRNSHolding(s) in Company
5th Nov 20197:00 amRNSHolding(s) in Company
4th Nov 20197:00 amRNSHolding(s) in Company
4th Nov 20197:00 amRNSExercise of warrants
30th Oct 20197:02 amRNSHolding(s) in Company
29th Oct 20197:00 amRNSHolding(s) in Company
28th Oct 20197:00 amRNSHolding(s) in Company
24th Oct 20197:00 amRNSHolding(s) in Company
21st Oct 20197:01 amRNSQ3 2019 Production and Operational Update
21st Oct 20197:00 amRNSHolding(s) in Company
18th Oct 20197:00 amRNSHolding(s) in Company
16th Oct 20197:00 amRNSNotification of transactions of directors/ PDMRs
15th Oct 20197:00 amRNSTulkubash Exploration & Drilling Program Complete
14th Oct 20197:00 amRNSHoldings in Company
11th Oct 20197:01 amRNSHolding(s) in Company
11th Oct 20197:00 amRNSCorrection to Holdings in Company
8th Oct 20197:00 amRNSDirector/PDMR Shareholding
8th Oct 20197:00 amRNSGrant of waiver
7th Oct 20197:00 amRNSHolding(s) in Company
4th Oct 20197:00 amRNSHolding(s) in Company
1st Oct 20197:00 amRNSHolding(s) in Company
27th Sep 20197:00 amRNSHolding(s) in Company
26th Sep 20197:00 amRNSHolding in Company
23rd Sep 20197:00 amRNSHolding(s) in Company
20th Sep 20197:00 amRNSGrant of share awards & options & Issue of Equity
20th Sep 20197:00 amRNSIssuance of shares in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.