Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Field Update

29 Sep 2014 10:00

RNS Number : 8410S
Leni Gas & Oil PLC
29 September 2014
 



For Immediate Release

29 September 2014

 

 

Leni Gas & Oil PLC

("LGO" or the "Company")

 

Goudron Field Update

LGO is pleased to announce that well GY-667 at the Goudron Field in Trinidad has undergone a series of initial production tests after perforating a 44-foot interval in the Lower Cruse Sandstones resulting in a calculated open-hole flow rate of 540 barrels of oil per day ("bopd"). The well is presently producing 40 degree API gravity water-free oil at a rate of 142 bopd through a 7/32-inch choke with a well-head flowing pressure of 420 psi. Higher rates up to over 220 bopd have been successfully tested, however, temporary field-wide production constraints are in place until the additional sales capacity is on-stream in the next week.

 

Neil Ritson, LGO's Chief Executive, commented:

 

"The results from GY-667, the Company's first completion in the Lower Cruse reservoir, have far exceeded our initial estimates of 60 bopd. We have yet to confidently locate the thickest zone of Lower Cruse Sandstones and therefore we are excited that a relatively thin interval is producing so prolifically. This is very encouraging for further potential in the Lower Cruse within the field."

 

The shallower primary Gros Morne reservoir in GY-667, with 219 feet of net oil pay, will be completed for production at a later date.

 

In addition, LGO confirms that initial production tests have been conducted on GY-666 and GY-668 resulting in a calculated open-hole flow rates of 300 bopd and 330 bopd respectively. Further clean-up work is required on these two wells to optimize flow rates. These wells are currently producing oil with trace water at 34.5 and 29 degree API respectively. Further optimization work will be performed after the new 2,000 barrel sales tank is commissioned.

 

LGO has now completed the first five of its planned 30 well initial redevelopment at Goudron and the next well, GY-669, is expected to spud imminently.

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

Leni Gas & Oil plc

David Lenigas

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

Mark Antelme

 +44 (0) 20 7861 3232

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reach-ed

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

Compl-etion Date

Completion Formation

Completed Interval (feet)

Calculated Open-hole Initial Production Rate

(bopd)

1

GY-664

28 April

4212

13 May

192

300

79

30 May

Gros Morne

278

490

2

GY-665

27 May

2750

8 June

195

256

np

15 Sept

Gros Morne

256

700

3

GY-666

16 June

3357

1 July

185

209

28

18 Sept

Gros Morne

156

300

4

GY-667

10 July

4006

30 July

187

219

28

27 Sept

Lower Cruse

44

540

5

GY-668

9 Aug

3026

27 Aug

191

254

np

23 Sept

Gros Morne

271

330

All depths are quoted as measured depth in feet below Rotary Table

np = not penetrated

 

Glossary:

API: American Petroleum Institute

Calculated

open-hole flow rate: A mathematically derived theoretical maximum flow rate that a well could deliver with zero back-pressure at the middle of the perforated interval

pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

psi: pounds per square inch

MD: Measured Depth

TD: Total Depth

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUBPBUPCURB
Date   Source Headline
31st Aug 20107:00 amRNSTotal Voting Rights
25th Aug 20107:00 amRNSSpain Hontomin Well Spud
6th Aug 20104:10 pmRNSShareholding
6th Aug 20104:05 pmRNSShareholding
6th Aug 20104:01 pmRNSShareholding
5th Aug 20107:00 amRNSSpain Hontomin Well Spud Update
27th Jul 20103:44 pmRNSAdditional Listing/Directors' shareholdings
20th Jul 20109:23 amRNSPlacement
13th Jul 201010:31 amRNSUS Gulf Coast Acreage Expansion
7th Jul 20103:23 pmRNSResult of AGM
28th Jun 20107:00 amRNSSpain Seismic Program with Ciuden commences
14th Jun 20107:00 amRNSAccounts and Notice of AGM
28th May 201011:01 amRNSProduction Update
11th May 20107:00 amRNSBusiness Update
6th May 20107:00 amRNSSpain Production Offtake Heads of Agreement - BP
6th Apr 20107:00 amRNSPortfolio Update - Gulf of Mexico
5th Mar 20101:29 pmRNSPortfolio Resources Status Update
25th Jan 20107:00 amRNSCorporate Activity & Production Update - December
23rd Dec 20092:09 pmRNSReplacement Corporate Activity & Production Update
22nd Dec 200910:44 amRNSCorporate Activity & Production Update
25th Nov 20097:00 amRNSCorporate Activity & Production Update - October
17th Nov 20097:00 amRNSCorporate Activity & Production Update - September
11th Nov 20094:38 pmRNSShareholding
11th Nov 20094:35 pmRNSShareholding
19th Oct 20097:00 amRNSGoM Direct Ownership and Production Agreement
5th Oct 20091:22 pmRNSHungary Investment Update
30th Sep 200911:20 amRNSGoM Direct Ownership & Production Agreement Update
30th Sep 20097:00 amRNSHalf Yearly Results
28th Sep 20097:00 amRNSHungary - Pen?szlek Development Expansion
24th Sep 20097:00 amRNSCorporate Activity & Production Update - August
15th Sep 20098:47 amRNSHungary - Pen?szlek Development Update
14th Sep 20097:00 amRNSAppointment of New Technical Service Providers
2nd Sep 20097:19 amRNSHungary - Pen?szlek Development Update
26th Aug 200911:50 amRNSCorporate Activity & Production Update - July
21st Aug 20097:00 amRNSGulf of Mexico - Award of Four New Leases
20th Jul 20097:00 amRNSMonthly Production Update
11th Jun 20092:49 pmRNSStatement re Leed Purchase and Sale Agreement
9th Jun 20097:00 amRNSMonthly Production Update
29th May 200912:43 pmRNSResult of AGM
15th May 20097:00 amRNSMonthly Production Update
13th May 20097:00 amRNSGulf of Mexico - Awarding of Six New Leases
11th May 200911:51 amRNSGulf of Mexico Production Update
11th May 20098:16 amRNSLeed Petroleum's RNS statement re possible offer
5th May 200911:25 amRNSHungary - Increased Production & Resources
29th Apr 20094:28 pmRNSReport and Notice of AGM
29th Apr 200910:17 amRNSSpain Production Increase
27th Apr 20091:21 pmRNSAnnual Financial Report
20th Apr 20097:00 amRNSHungary - Production Development Success
16th Apr 20091:31 pmRNSGulf of Mexico Acquisition
14th Apr 20097:00 amRNSMonthly Production Update - March

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.