If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update, Trinidad

22 May 2015 07:00

RNS Number : 9902N
LGO Energy PLC
22 May 2015
 

For Immediate Release, 7 am

22 May 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update, Trinidad

 

LGO is today pleased to announce that well GY-673, which was spudded on 1 May 2014, has reached total depth and that well GY-674 has now been spudded and drilling ahead at over 166 feet. Electric log interpretation from both the Goudron and C-sand intervals in GY-673 confirms the presence of recoverable hydrocarbons; the net oil pay in the Goudron Sandstone is estimated to be over 650 feet and net hydrocarbon pay in the C-sand main target is estimated at 140 feet.

 

Drilling Operations:

 

Well GY-673 is the second of seven wells currently planned for 2015. The Goudron Sandstone was encountered between 530 and 1,710 feet measured depth ("MD") with an estimated net oil pay totaling 657 feet. The oil and gas bearing C-sand interval was encountered at a depth of 2,670 feet MD and the total depth ("TD") of the well was 3,193 feet MD. Net hydrocarbon bearing pay in the C-sand interval has been provisionally estimated as 140 feet. The observed net pay is in line with the prognosis for this well.

 

Well GY-674 is being drilled from the same drilling pad (Pad 4) and is planned to reach a total depth of 3,550 feet MD and is targeting a C-sand reservoir interval approximately 500 feet to the south of the surface location. The top Gros Morne sandstone reservoir (upper C-sand) is anticipated at 2,570 feet MD (2,350 feet TVD sub-sea). It is anticipated that additional data will be gathered in well GY-674, including the cutting of a 30-foot core in the C-sand reservoir, to assist in longer-term field development planning, and enhanced oil recovery.

 

Following the drilling of GY-674 Well Services Rig 70 will be moved to Pad 5 where it is expected that four further C-sand wells will be drilled.

 

Neil Ritson, LGO's Chief Executive, commented:

"Our 2015 drilling campaign is now in full swing and we are seeing results in line with our plans. First production from these three Pad 4 wells is now anticipated to be achieved in June. Additional drill pads for the drilling of further C-sand wells are now being prepared and additional environmental approvals are being sought that will allow the current 30 well program to be expanded to at least 60 wells."

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 20 7440 0645

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

 

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

TVD

true vertical depth; the depth of a well projected on to a vertical line below the surface location

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGZKRMMGKZM
Date   Source Headline
15th Oct 20187:00 amRNSConditional placing to raise £2.5m
12th Oct 20184:46 pmRNSHolding(s) in Company
12th Oct 20184:22 pmRNSHolding(s) in Company
10th Oct 20187:00 amRNSBusiness, Operational and Financial Update Q3
8th Oct 20187:00 amRNSCompletion of Steeldrum Acquisition
27th Sep 20187:00 amRNSUnaudited Interim Results
10th Sep 20187:00 amRNSCory Moruga Block: Snowcap Licence Extension
6th Sep 20187:00 amRNSHolding(s) in Company
29th Aug 201810:24 amRNSPetrotin Restructuring
14th Aug 20188:34 amRNSIssue of Equity, TVR
13th Jul 20185:16 pmRNSResult of AGM
13th Jul 20187:00 amRNSAcquisition, New Convertible and Business Update
2nd Jul 20187:03 amRNSUpdate on Director remuneration and options
25th Jun 20187:00 amRNSSPA signed for 50% Interest in Icacos Field
12th Jun 20187:00 amRNSAccounts for year to 31 Dec 2017 and Notice of AGM
25th Apr 20187:00 amRNSHolding(s) in Company
16th Apr 20187:25 amRNSPotential acquisition of a 50% interest in Icacos
9th Apr 20188:25 amRNSQ1 Business, Operational and Financial Update
29th Mar 20187:00 amRNSUpdate on La Lora Concession
26th Mar 20187:00 amRNSBusiness Update - La Lora Concession in Spain
19th Mar 20187:00 amRNSRenegotiation of BOLT Transaction
22nd Feb 20187:00 amRNSBusiness update - La Lora Concession in Spain
5th Feb 20187:00 amRNSHolding(s) in Company
18th Jan 20187:00 amRNSHolding(s) in Company
17th Jan 20189:00 amRNSPrice Monitoring Extension
12th Jan 20187:00 amRNSHolding(s) in Company
27th Dec 20177:00 amRNSHolding(s) in Company
21st Dec 20177:00 amRNSOperational, Financial and Management Update
8th Nov 20174:26 pmRNSIssue of Equity and TVR
2nd Nov 20177:00 amRNSResult of Open Offer and Total Voting Rights
16th Oct 20177:00 amRNSHolding(s) in Company
16th Oct 20177:00 amRNSPosting of Open Offer Circular
10th Oct 20177:00 amRNSIssue of Equity and TVR
9th Oct 20177:00 amRNSPlacing, Subscription and Open Offer
29th Sep 20175:42 pmRNSTotal Voting Rights
19th Sep 20177:00 amRNSIssue of Equity and TVR
14th Sep 20172:10 pmRNSResult of AGM
13th Sep 20177:00 amRNSInterim Results for 6 months ended 30 June 2017
12th Sep 20177:00 amRNSGoudron Water Injection Pilot "A" - CEC issued
11th Sep 20177:00 amRNSRe-negotiation of Convertible Security Funding
1st Aug 20177:00 amRNSBoard Change, Notice of AGM and of Interim Results
10th Jul 20177:00 amRNSOperational and Business Update
15th Jun 20177:01 amRNSCompany Update
15th Jun 20177:00 amRNSDirectorate Change, Appointment of CFO
14th Jun 20174:54 pmRNSUpdate on Columbus Energy Resources plc
13th Jun 201712:34 pmRNSChange of name to Columbus Energy Resources plc
8th Jun 20172:45 pmRNSColumbus Energy Resources Launch Event
10th May 20177:00 amRNSDirectorate change, proposed company name change
5th May 20177:00 amRNSAnnual Financial Report
4th May 20177:00 amRNSInvestor Strategy Briefing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.