Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update, Trinidad

22 May 2015 07:00

RNS Number : 9902N
LGO Energy PLC
22 May 2015
 

For Immediate Release, 7 am

22 May 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update, Trinidad

 

LGO is today pleased to announce that well GY-673, which was spudded on 1 May 2014, has reached total depth and that well GY-674 has now been spudded and drilling ahead at over 166 feet. Electric log interpretation from both the Goudron and C-sand intervals in GY-673 confirms the presence of recoverable hydrocarbons; the net oil pay in the Goudron Sandstone is estimated to be over 650 feet and net hydrocarbon pay in the C-sand main target is estimated at 140 feet.

 

Drilling Operations:

 

Well GY-673 is the second of seven wells currently planned for 2015. The Goudron Sandstone was encountered between 530 and 1,710 feet measured depth ("MD") with an estimated net oil pay totaling 657 feet. The oil and gas bearing C-sand interval was encountered at a depth of 2,670 feet MD and the total depth ("TD") of the well was 3,193 feet MD. Net hydrocarbon bearing pay in the C-sand interval has been provisionally estimated as 140 feet. The observed net pay is in line with the prognosis for this well.

 

Well GY-674 is being drilled from the same drilling pad (Pad 4) and is planned to reach a total depth of 3,550 feet MD and is targeting a C-sand reservoir interval approximately 500 feet to the south of the surface location. The top Gros Morne sandstone reservoir (upper C-sand) is anticipated at 2,570 feet MD (2,350 feet TVD sub-sea). It is anticipated that additional data will be gathered in well GY-674, including the cutting of a 30-foot core in the C-sand reservoir, to assist in longer-term field development planning, and enhanced oil recovery.

 

Following the drilling of GY-674 Well Services Rig 70 will be moved to Pad 5 where it is expected that four further C-sand wells will be drilled.

 

Neil Ritson, LGO's Chief Executive, commented:

"Our 2015 drilling campaign is now in full swing and we are seeing results in line with our plans. First production from these three Pad 4 wells is now anticipated to be achieved in June. Additional drill pads for the drilling of further C-sand wells are now being prepared and additional environmental approvals are being sought that will allow the current 30 well program to be expanded to at least 60 wells."

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 20 7440 0645

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

 

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

TVD

true vertical depth; the depth of a well projected on to a vertical line below the surface location

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGZKRMMGKZM
Date   Source Headline
3rd May 20177:00 amRNSGroup Operational Update
2nd May 20174:20 pmRNSTotal Voting Rights
2nd May 20177:00 amRNS2016 Results and Investor Briefing
18th Apr 20177:00 amRNSWell GY-683 on initial production at 80 bopd
6th Apr 20177:00 amRNSSecond successful infill well, GY-683, Goudron
5th Apr 20177:00 amRNSAppointment of Joint Broker
3rd Apr 20177:05 amRNSResult of Offer via PrimaryBid
3rd Apr 20177:00 amRNSSpud of Well GY-683, Goudron Field, Trinidad
31st Mar 20175:59 pmRNSFundraising of £2.5 million
22nd Mar 20177:00 amRNSWell GY-682 production, Goudron Field
13th Mar 20177:00 amRNSSuccessful well GY-682,Goudron Field
9th Mar 20172:12 pmRNSShare Payments to Directors and TVR
8th Mar 201711:52 amRNSCapital re-organisation and TVR
7th Mar 20172:23 pmRNSResult of General Meeting, Capital Re-organisation
6th Mar 20177:00 amRNSSpud of well GY-682, Goudron Field Trinidad
27th Feb 20177:00 amRNSDrilling Update, Trinidad
15th Feb 20179:30 amRNSNotice of GM
13th Feb 20177:00 amRNSOperational Update, Trinidad
9th Feb 20177:00 amRNSUpdate La Lora Concession, Spain
30th Jan 20177:00 amRNSLa Lora Concession, Spain
24th Jan 20177:00 amRNSOperational Update
13th Jan 20174:15 pmRNSUpdate, Spain
10th Jan 20177:00 amRNSDirectorate Change
4th Jan 20177:00 amRNSDrilling Update, Goudron Field, Trinidad
21st Dec 20165:18 pmRNSDirector/PDMR dealings
21st Dec 20168:16 amRNSCorporate Update
14th Dec 20164:44 pmRNSHolding(s) in Company
13th Dec 20167:00 amRNSPlacing to raise £1.18 m, total voting rights
12th Dec 20167:00 amRNSDrilling Update, Goudron Field Trinidad
9th Dec 20161:27 pmRNSFirst Close with Lind Partners
7th Dec 20165:57 pmRNSHolding(s) in Company
7th Dec 20168:33 amRNSLoan repayment and signing new funding agreement
29th Nov 20167:00 amRNSSale of Oil in Spain
22nd Nov 20165:59 pmRNSHolding(s) in Company
4th Nov 20167:00 amRNSOperational Update and 3Q Production
6th Oct 20163:24 pmRNSHolding(s) in Company
4th Oct 201611:45 amRNSWebinar, Friday 7 October
30th Sep 20165:15 pmRNSTotal Voting Rights
29th Sep 201610:01 amRNSHolding(s) in Company
28th Sep 20167:00 amRNSHalf-year Report
27th Sep 20167:00 amRNSAdditional Recompletion Wells GY-668 and GY-288
23rd Sep 201611:28 amRNSPlacing and TVR
7th Sep 20166:33 pmRNSHolding(s) in Company
31st Aug 20165:50 pmRNSTotal Voting Rights
22nd Aug 20167:00 amRNSSuccessful recompletion of GY-277, Goudron Field
18th Aug 20162:59 pmRNSIssue of Shares for Services, Total Voting Rights
28th Jul 201610:41 amRNSRecompletion of Well GY-673, Goudron Field
18th Jul 20167:00 amRNSUpdated Resource Assessment, Goudron Field
4th Jul 20162:53 pmRNSResult of AGM
1st Jul 20165:35 pmRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.