Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update, Trinidad

22 May 2015 07:00

RNS Number : 9902N
LGO Energy PLC
22 May 2015
 

For Immediate Release, 7 am

22 May 2015

 

LGO ENERGY PLC

("LGO" or the "Company")

 

Goudron Drilling Update, Trinidad

 

LGO is today pleased to announce that well GY-673, which was spudded on 1 May 2014, has reached total depth and that well GY-674 has now been spudded and drilling ahead at over 166 feet. Electric log interpretation from both the Goudron and C-sand intervals in GY-673 confirms the presence of recoverable hydrocarbons; the net oil pay in the Goudron Sandstone is estimated to be over 650 feet and net hydrocarbon pay in the C-sand main target is estimated at 140 feet.

 

Drilling Operations:

 

Well GY-673 is the second of seven wells currently planned for 2015. The Goudron Sandstone was encountered between 530 and 1,710 feet measured depth ("MD") with an estimated net oil pay totaling 657 feet. The oil and gas bearing C-sand interval was encountered at a depth of 2,670 feet MD and the total depth ("TD") of the well was 3,193 feet MD. Net hydrocarbon bearing pay in the C-sand interval has been provisionally estimated as 140 feet. The observed net pay is in line with the prognosis for this well.

 

Well GY-674 is being drilled from the same drilling pad (Pad 4) and is planned to reach a total depth of 3,550 feet MD and is targeting a C-sand reservoir interval approximately 500 feet to the south of the surface location. The top Gros Morne sandstone reservoir (upper C-sand) is anticipated at 2,570 feet MD (2,350 feet TVD sub-sea). It is anticipated that additional data will be gathered in well GY-674, including the cutting of a 30-foot core in the C-sand reservoir, to assist in longer-term field development planning, and enhanced oil recovery.

 

Following the drilling of GY-674 Well Services Rig 70 will be moved to Pad 5 where it is expected that four further C-sand wells will be drilled.

 

Neil Ritson, LGO's Chief Executive, commented:

"Our 2015 drilling campaign is now in full swing and we are seeing results in line with our plans. First production from these three Pad 4 wells is now anticipated to be achieved in June. Additional drill pads for the drilling of further C-sand wells are now being prepared and additional environmental approvals are being sought that will allow the current 30 well program to be expanded to at least 60 wells."

 

Qualified Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for LGO Energy plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

 

Enquiries:

LGO Energy plc

+44 (0) 20 7440 0645

Neil Ritson

Fergus Jenkins

Beaumont Cornish Limited

+44(0) 20 7628 3396

Nomad

Rosalind Hill Abrahams

Roland Cornish

FirstEnergy Capital LLP

+44(0) 20 7448 0200

Joint Broker

Jonathan Wright

David van Erp

 

Bell Pottinger

+44 (0) 20 3772 2500

Financial PR

Henry Lerwill

 

Glossary:

C-sand

sandstone reservoirs below the pre-Mayaro unconformity and above the pre-Lower Cruse unconformity encompassing sandstones of equivalent age to both the Gros Morne and the Lower Cruse formations

pay

a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

MD

measured depth; the depth of a well measured along the length of the borehole

TD

total depth

TVD

true vertical depth; the depth of a well projected on to a vertical line below the surface location

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGZKRMMGKZM
Date   Source Headline
22nd Jun 20202:17 pmRNSForm 8 (OPD) - Bahamas Petroleum Company PLC
22nd Jun 20202:02 pmRNSForm 8 (OPD) Columbus Energy Resources PLC
22nd Jun 202010:24 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
19th Jun 202010:41 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
19th Jun 202010:35 amRNSInterview on merger with Bahamas Petroleum
18th Jun 202010:15 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
17th Jun 20203:03 pmRNSForm 8.3 - [Columbus Energy Resources plc]
17th Jun 20209:33 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
17th Jun 20207:00 amRNSIssuance of Lind and Contractor Shares
16th Jun 20202:47 pmRNSForm 8.3 - [Columbus Energy Resources plc]
16th Jun 20209:52 amGNWForm 8.5 - Columbus Energy Resources Plc
15th Jun 202010:33 amGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
15th Jun 202010:08 amRNSInterview and Investor Presentation
12th Jun 20204:39 pmGNWForm 8.5 (EPT/RI) - Columbus Energy Resources Plc
12th Jun 20203:13 pmRNSForm 8.3 - [Columbus Energy Resources plc]
11th Jun 202011:58 amRNSRe 2.7 Recommended all-share merger
11th Jun 202011:49 amRNSRecommended all share merger - 2.7
3rd Jun 20202:05 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:00 pmRNSPrice Monitoring Extension
1st Jun 20207:00 amRNSOperational Update - Phase 2 CO2 Trinity Inniss
29th May 20203:11 pmRNSTotal Voting Rights
28th May 20207:00 amRNSSaffron 2 - drilling application to Ministry
18th May 20201:21 pmRNSHolding(s) in Company
13th May 20207:00 amRNSUpdate and Total Voting Rights
11th May 20204:42 pmRNSSecond Price Monitoring Extn
11th May 20204:36 pmRNSPrice Monitoring Extension
7th May 202011:06 amRNSSecond Price Monitoring Extn
7th May 202011:00 amRNSPrice Monitoring Extension
5th May 202011:06 amRNSSecond Price Monitoring Extn
5th May 202011:00 amRNSPrice Monitoring Extension
5th May 20209:06 amRNSSecond Price Monitoring Extn
5th May 20209:00 amRNSPrice Monitoring Extension
4th May 202011:05 amRNSSecond Price Monitoring Extn
4th May 202011:00 amRNSPrice Monitoring Extension
4th May 20207:00 amRNSTotal Voting Rights
27th Apr 20204:40 pmRNSSecond Price Monitoring Extn
27th Apr 20204:36 pmRNSPrice Monitoring Extension
27th Apr 20207:00 amRNSSaffron Discoveries - Lower Cruse and Middle Cruse
15th Apr 20207:00 amRNSCorporate Update and response to COVID-19
14th Apr 20205:01 pmRNSHolding(s) in Company
6th Apr 20207:00 amRNSOperations Update - Goudron Renewal
31st Mar 20201:00 pmRNSUpdate on Inniss-Trinity CO2 Project
31st Mar 202011:06 amRNSSecond Price Monitoring Extn
31st Mar 202011:00 amRNSPrice Monitoring Extension
31st Mar 20207:00 amRNSOperations update - Goudron renewal
17th Mar 20207:00 amRNSCorporate Update
3rd Mar 20209:19 amRNSTotal Voting Rights
20th Feb 20207:00 amRNSDirector/PDMR Shareholding
20th Feb 20207:00 amRNSDirector/PDMR Shareholding
17th Feb 202011:18 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.