Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Drilling Update

29 Oct 2014 09:46

RNS Number : 5769V
Leni Gas & Oil PLC
29 October 2014
 



For Immediate Release

29 October 2014

 

 

Leni Gas & Oil PLC

("LGO" or the "Company")

 

Goudron Drilling Update

 

LGO is today pleased to announce that well GY-670, the seventh of its planned 30 new development wells at the Goudron Field in Trinidad, and the second well from the third drill pad, was spudded yesterday and is drilling ahead in the Goudron Sandstones at a depth of approximately 220 feet.

 

Well GY-670 is planned to test the Goudron and Gros Morne Sandstone reservoirs to a total depth ("TD") of at least 3,100 feet TVDss (equivalent to 3,305 feet measured depth ("MD")) and will be deviated approximately 600 feet northwest from the surface location.

 

The sixth new Goudron well, GY-669, reached a TD of 3,505 feet MD and has been electric logged. The well was drilled to a depth slightly less than prognosed since it was considered that all sand-prone intervals had been penetrated at that location. The final section of the well, which was drilled in 8 ½-inch hole, has now been successfully cased to TD and the well is ready for completion as a production well.

 

A total of over 400 feet of net hydrocarbon pay have been identified in GY-669. Analysis of the electric logs is not yet complete however the presence of higher than previously identified reservoir pressure near the base of the well suggests a different fault block has been penetrated than in earlier wells. Age dating of the intervals penetrated by the well is also ongoing in order to ensure the correct identification of the boundary between the Gros Morne and underlying Lower Cruse reservoirs, and the attribution of the identified pay intervals to the appropriate formations.

 

The completion of GY-669 will be undertaken when Well Services Rig 20 is moved from the drill pad; which is currently anticipated to occur in late 2014.

 

Neil Ritson, LGO's Chief Executive, commented:

"Well seven is now underway and we are analyzing the results of well number six, GY-669, which is another successful well with considerable net pay. Reservoir pressures of up to 2,580 psi were measured near TD; the highest we have yet seen, and this may have major benefits for future production from this part of the field."

 

A summary of the drilling program results to date is given in the Appendix below.

 

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

Leni Gas & Oil plc

Neil Ritson

+44 (0)20 7440 0645

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Pelham Bell Pottinger

Financial PR

Mark Antelme

 +44 (0) 20 7861 3232

Henry Lerwill

 

 

Appendix:

Well

Name

Spud

Date

Total Depth

(MD feet)

Date Total Depth Reached

Goudron

Net Oil Pay

(feet)

Gros Morne

Net Oil Pay

(feet)

Lower Cruse Net Oil Pay

(feet)

1

GY-664

28 April

4212

13 May

192

300

79

2

GY-665

27 May

2750

8 June

195

256

np

3

GY-666

16 June

3357

1 July

185

209

28

4

GY-667

10 July

4006

30 July

187

219

28

5

GY-668

9 August

3026

27 August

191

254

np

6

GY-669

5 October

3505

24 October

227

na

na

7

GY-670

28 October

All depths are quoted as measured depth in feet below Kelly bushing

na = not yet available

np = not penetrated

 

Glossary:

Pay: A reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.

MD: Measured Depth

psi: pounds per square inch

TD: Total Depth

TVDss: True Vertical Depth sub sea

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUKSKRSOARURA
Date   Source Headline
18th Sep 20157:00 amRNSUnaudited Interim Results
7th Sep 201510:30 amRNSDrilling update, Trinidad
28th Aug 20159:00 amRNSInitial production rates Pad-5, Goudron
21st Aug 20157:00 amRNSSPA signed in 2014, Tabaquite Block, Trinidad
20th Aug 20157:00 amRNSInitial Production Rate Well GY-675, Goudron Field
17th Aug 20157:00 amRNSDrilling Update, Trinidad
12th Aug 20157:00 amRNSDrilling Update, Trinidad
6th Aug 20153:06 pmRNSTotal Voting Rights
29th Jul 20157:01 amRNSOperational Update
16th Jul 201510:17 amRNSGoudron Pad 4 Testing Update, Trinidad
9th Jul 201510:01 amRNSCedros Peninsula Update, Trinidad
7th Jul 20151:42 pmRNSResult of AGM
6th Jul 20157:00 amRNSGoudron Drilling Update
29th Jun 20157:00 amRNSGoudron Pad 4 Testing
24th Jun 20157:00 amRNSUpgraded Resource Assessment, Trinidad
17th Jun 20157:00 amRNSGoudron Pad 4 Testing and Infrastructure
15th Jun 201510:44 amRNSGoudron Pad 5 Drilling Update, Trinidad
11th Jun 20159:46 amRNSGoudron Drilling Update, Trinidad
2nd Jun 20157:00 amRNSReport and Accounts and Notice of AGM
28th May 20159:23 amRNSChange of Registered Office
22nd May 20157:00 amRNSGoudron Drilling Update, Trinidad
30th Apr 20158:00 amRNSGoudron Drilling and Field Update
15th Apr 20157:00 amRNSGoudron Drilling and Field Update
31st Mar 20154:18 pmRNSTotal Voting Rights
17th Mar 201510:13 amRNSUS$11.78 million drawn, and Goudron Field update
24th Feb 20158:00 amRNSIssue of Debt
24th Feb 20157:37 amRNSIssue of Equity
23rd Feb 20154:56 pmRNSProposed placing to raise at least £4m (US$6m)
19th Feb 201510:01 amRNSFTG Survey Completion
18th Feb 20159:46 amRNSGoudron Operational Update
26th Jan 201510:00 amRNSFlow rate of well GY-669 and Goudron Field update
15th Jan 20157:00 amRNS£1 million raised for Goudron, and Cedros update
6th Jan 20157:00 amRNSGroup Production and Goudron Field Update
5th Jan 20157:00 amRNSAppointment of Joint Broker
31st Dec 20148:00 amRNSTotal Voting Rights
22nd Dec 20147:00 amRNSBoard appointment
15th Dec 20147:00 amRNSFlow rate of Goudron well GY-670 exceeds 1,000bopd
8th Dec 20147:00 amRNSDrilling Update, Rig Secured and CPR Commissioned
4th Dec 201411:18 amRNSGroup Production Update
1st Dec 20148:00 amRNSDirector Option Awards and Share Issue
27th Nov 20149:47 amRNSAgreement to acquire BOLT deep rights
24th Nov 20147:00 amRNSGoudron Drilling and Production Update, Trinidad
19th Nov 20147:00 amRNSGoudron Drilling Update, Trinidad
11th Nov 201410:59 amRNSReplacement: Goudron Drilling Update
11th Nov 20147:00 amRNSGoudron Drilling Update
4th Nov 20142:25 pmRNSChange of Name
30th Oct 20146:17 pmRNS£2.3 million raised for Cedros, Trinidad
30th Oct 20149:48 amRNSSurvey and Cedros Update, Trinidad
29th Oct 20149:46 amRNSGoudron Drilling Update
20th Oct 201410:47 amRNSGoudron Drilling Update, GY-669

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.