Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCERP.L Regulatory News (CERP)

  • There is currently no data for CERP

Goudron Development Update, Trinidad

19 May 2014 07:00

RNS Number : 4128H
Leni Gas & Oil PLC
19 May 2014
 

For Immediate Release, 7 am 19 May 2014

 

LENI GAS AND OIL PLC

("LGO" or the "Company")

Goudron Development Update, Trinidad.

 

LGO today provides an update on its Goudron Field redevelopment activities in Trinidad. Well GY-664, the first of 30 planned development wells, has now been logged and cased to total depth. The second planned well, expected to be designated GY-665, will be spudded shortly. 

After provisional analysis of the full electronic logs, GY-664 has penetrated over 1,500 feet of gross sand in three formations; the Goudron, Gros Morne and Lower Cruse, with a calculated total net oil pay of 571 feet. After analysis of the logs it has been decided to complete the well as a Gros Morne production well.

The following provisional analysis of the electric logs summarises the reservoirs encountered in the well:

Formation

Gross interval with oil shows (feet)

Net Oil Pay (feet)

Goudron

354

192

Gros Morne

1140

300

Lower Cruse

95

79

Total

1589

571

 

It is now intended to perforate a total of between 270 to 300 feet of Gros Morne oil pay in GY-664 in order to optimise production from the overall gross sandstone interval. Simultaneous production of the Lower Cruse and Gros Morne is not possible due to the different pressures encountered and the possibility of cross-flow between the higher and lower pressured formations. Perforation will be by means of tubing conveyed guns (TCP) at a rate of 6 shots per foot.

During the drilling phase mud weights were controlled to significantly below the historic levels used in the offset wells and it is therefore expected that formation damage, typically associated with the old wells, will have been minimised. The combination of less formation damage and improved perforation techniques are expected to contribute to production rates which have historically been constrained by the practices available at the time.

The Lower Cruse was found to be in a poorer depositional setting in GY-664 than had been prognosed. Although producible oil is shown to be present on the logs and wells in similar facies have produced commercial quantities of oil in the past, the greater production potential of the Gros Morne is seen to be most appropriate objective for the completion of this well.

Once the casing operations have been fully completed at GY-664 Well Services Rig 20 will be move a short distance to the GY-665 drilling location. Work-over rig Altech-2 will be used to perforate the planned interval of Gros Morne reservoir and run a completion for production. Rig-20 will independently commence drilling of GY-665.

Well H18E-H6, which is expected to be designated as GY-665, has a total planned depth of 3,500 feet and is anticipated to intersect with all three prospective reservoir intervals and to encounter the Lower Cruse at around 3,000 feet. Wells GY-664 and GY-665 are separated by a known fault zone with the reservoir formations anticipated to be structurally shallower in GY-665.

Neil Ritson, LGO Chief Executive, commented:

"Completion of the extensive oil pay in the Gros Morne in GY-664 presents the best production potential in the first well. The Goudron Sands can be completed at a later date. The next well, GY-665, will be drilled to at least 3,500 feet and will investigate the Lower Cruse in a different structural setting. Production from GY-664 is expected to commence shortly."

Competent Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Leni Gas & Oil Plc, who has over 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers (SPE), an Active Member of the American Association of Petroleum Geologists (AAPG) and is a Fellow of the Geological Society of London.

Enquiries:

Leni Gas & Oil plc

David Lenigas

Neil Ritson

+44 (0) 20 7440 0645

 

 

 

Beaumont Cornish Limited

Nomad and Joint Broker

Rosalind Hill Abrahams

Roland Cornish

+44(0) 20 7628 3396

 

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

+44(0) 20 7493 8188

 

Bell Pottinger

Financial PR

Mark Antelme

+44 (0) 20 7861 3232

Henry Lerwill

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFLFETITLIS
Date   Source Headline
1st Jul 201610:54 amRNSHolding(s) in Company
14th Jun 20167:00 amRNSFinancing and Goudron Field Update
9th Jun 20164:26 pmRNSIssue of shares for services and TVR
9th Jun 20161:38 pmRNSAnnual Report and Accounts and Notice of AGM
25th May 20169:53 amRNSHolding(s) in Company
18th May 20166:07 pmRNSHolding(s) in Company
13th May 20165:23 pmRNSHolding(s) in Company
13th May 20165:18 pmRNSHolding(s) in Company
12th May 20165:41 pmRNSHolding(s) in Company
12th May 201612:52 pmRNSHolding(s) in Company
12th May 20167:00 amRNSWell GY-50 and first quarter 2016 production
10th May 20166:04 pmRNSHolding(s) in Company
10th May 201612:42 pmRNSHolding(s) in Company
4th May 20165:17 pmRNS£3.25million Fundraising, Loan Restructuring & TVR
27th Apr 20167:00 amRNSRecompletion of Well GY-671, Goudron
20th Apr 20167:00 amRNSGoudron Operational Update
18th Apr 20163:28 pmRNSResult of Meeting, Issue of Equity, TVR
6th Apr 20169:36 amRNSUpdate Goudron Workover Program
1st Apr 20164:13 pmRNSTotal Voting Rights
31st Mar 20167:00 amRNSNotice of General Meeting
24th Mar 20167:00 amRNSGoudron Overriding Royalty Rates Reduced
16th Mar 20167:00 amRNS£1.95 million Share Issues
14th Mar 20167:00 amRNSUpdate Goudron production investment
9th Mar 20167:00 amRNSTermination of Offer Period and Goudron update
4th Mar 20167:00 amRNSBanking Update
25th Feb 20162:49 pmRNSREPLACEMENT Form 8.3 - LGO Energy PLC
25th Feb 201610:01 amRNSForm 8.3 - LGO Energy PLC
24th Feb 20167:00 amRNSCorporate and Operations Update
4th Feb 20162:05 pmRNSForm 8 (OPD) LGO Energy Plc (Replacement)
1st Feb 201612:23 pmRNSTotal Voting Rights
29th Jan 20164:25 pmRNSForm 8.3 - LGO Energy PLC
22nd Jan 20167:00 amRNSIssue of Shares, TVR and Rule 2.10
19th Jan 20166:00 pmRNSConference Presentation
31st Dec 20157:00 amRNSTotal Voting Rights
24th Dec 201512:23 pmRNSUpdate on Trinity-Inniss
17th Dec 20154:38 pmRNSForm 8.3 - LGO Energy PLC
14th Dec 201511:57 amRNSForm 8.3 - [LGO Energy PLC]
14th Dec 20157:00 amRNSIssue of Equity, TVR and Rule 2.10 Announcement
11th Dec 20153:03 pmRNSForm 8 (OPD) LGO Energy plc
8th Dec 20152:46 pmRNSShares Issued and Rule 2.10 Announcement
7th Dec 20158:00 amRNSStrategic review and commencement of Offer Period
7th Dec 20157:00 amRNSTabaquite Block, Trinidad
4th Dec 201510:09 amRNSSettlements with Various Creditors
26th Nov 201512:20 pmRNSBanking update and board change
3rd Nov 20157:00 amRNSCorporate and Operational Update
19th Oct 20157:00 amRNSUpdate Goudron Field well GY-678, Trinidad
12th Oct 20157:00 amRNSAcquisition of 25% stake in Bolt
5th Oct 20157:00 amRNS£1 million raised for further Goudron investment
24th Sep 20157:00 amRNSGoudron Sandstone oil production
22nd Sep 20152:42 pmRNSPresentation at First Energy Conference

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.