Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

  • This share is currently suspended. It was suspended at a price of 1.90

Share Price Information for Caspian Sunrise (CASP)

Share Price is delayed by 15 minutes
Get Live Data
1.90    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £44.77m
CASP Live PriceLast checked at - London Stock Exchange

Intraday Caspian Sunrise Share Chart

BNG Operational Update

14 Dec 2017 07:00

RNS Number : 2876Z
Caspian Sunrise plc
14 December 2017
 

 

Caspian Sunrise PLC

("Caspian Sunrise" or the "Company")

 

BNG Operational Update

 

Introduction

 

Caspian Sunrise the Central Asian oil and gas company, with a focus on Kazakhstan, is pleased to update the market with news at the BNG Contract Area of progress at its Deep Wells A5, 801, A6 & A8 and at the Shallow Well 146 on the MJF structure.

 

Deep Wells

 

Deep Well A5

 

For 15 days before the formal start of the 90-day flow test the well flowed at the rate of approximately 3,800 bopd using a 10 mm choke. Following a decline in pressure, believed to be caused by drilling fluid in the well, the 10mm choke was replaced with a 4mm choke the production rate fell to approximately 1,000 bopd.

 

This reduced flow rate is materially less than would otherwise be the case without the drilling fluid in the well. If we continued with the formal 90-day flow test without clearing the well and the choke it would unnecessarily restrict the reserves attributable to the well and the income from sales of oil.

 

Accordingly, Caspian Sunrise announces a pause to the independent 90-day flow test at Deep Well A5 to allow further drilling fluid to be cleared from the well and from the choke, with a view to materially improving the final result.

 

We plan to clear the well, possibly with the use of coil tubing equipment, which is on the way to the site. The delay is not expected to be significant and we expect to resume the formal 90-day flow test before the end of the year.

 

Deep Well 801

 

As previously announced Deep Well 801 has 90 meters of stuck pipe at a depth of some 4,752 - 4,842 meters.

 

Work to allow a 200 meter side-track to be drilled from a depth of approximately 4,700 meters is now almost complete and the side-track drilling is expected to commence in the next 10 days, with an expected drilling phase of 30 days.

 

This is the same operation that allowed Deep Well A5 to flow but at 801 the operation is expected to be easier and quicker as the distances to drill are shorter.

 

Deep Well A6

 

Once the drilling pipes to be used at Deep Well 801 become free we plan to recomplete the bottom of Deep Well A6, making the floor of the well watertight and then re-perforate up to 100 meters of potential oil using more powerful explosive charges than before. This work is now expected to commence in January 2018.

 

Deep Well A8

 

The equipment required to spud Deep Well A8 is on site and spudding of this, the fourth deep well at BNG, remains on course for before the end of the year.

 

Shallow Wells

 

Well 146

 

Caspian Sunrise also announces that Well 146, our sixth well on the shallow MJF structure, which was spudded in September 2017, has tested at the rate of 70 bopd using a 3 mm choke.

 

This makes well 146 the sixth commercial well drilled on the MJF structure, which in aggregate now has a production capacity of approximately 4,000 bopd.

 

However, our expectations based on the core samples taken from this well and the performance of other wells on the MJF structure - in particular well 142, is for a significantly higher rate of production from this well. We believe the issue to be connected to the perforation of this well and accordingly plan to re-perforate and re test the well before the end of the year.

 

 

 

Clive Carver, Executive Chairman, Caspian Sunrise comments:

 

"The initial results from Well A5 are very encouraging.

 

The incidence of drilling fluid in the well is not entirely unexpected given the well's history.

 

By briefly pausing the formal 90-day flow test now to clean out the well we avoid reporting unnecessarily low reserve numbers and preserve our ability to sell the higher quantities of oil expected when the well and the choke are clear of the hard-set drilling fluids

 

The early results of the test demonstrate the steady production volumes and the maintenance of a strong pressure in the well."

 

 

Caspian Sunrise PLC

 

Clive Carver

Executive Chairman

+7 727 375 0202

 

 

WH Ireland, Nominated Adviser & Broker

 

James Joyce

Jessica Cave

James Sinclair-Ford

 

+44 (0) 207 220 1666

Yellow Jersey PR

Tim Thompson

+44 (0) 203 735 8825

 

 

 

Qualified Person

 

Mr. NurlybekOspanov, Caspian Sunrise PLC's Chief Geologist / Technical Director who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This announcement has been posted to:

www.caspiansunrise.com/investors

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDUORBRBNAUAAA
Date   Source Headline
8th Jan 20137:00 amRNS$40 million equity investment
5th Dec 20127:00 amRNSFirst Production From Munaily
4th Dec 20127:00 amRNSGalaz Spudding NK-12
21st Nov 201212:32 pmRNSUpdate on BNG/KNOC farm-out
31st Oct 20127:00 amRNSUpdate on BNG / KNOC farm-out
27th Sep 20127:00 amRNSInterim Results
13th Sep 20127:00 amRNSOilBarrel Presentation
4th Sep 20127:00 amRNSOperational update
15th Aug 20127:00 amRNSOperational update
18th Jul 20128:03 amRNSOperational Update
27th Jun 20127:00 amRNSOperational Update
21st Jun 20129:10 amRNSOperational Update
11th Jun 20125:10 pmRNSResults of General Meeting and AGM
1st Jun 20127:00 amRNSOperational Update
29th May 20127:00 amRNSOperational Update
23rd May 20127:00 amRNSOperational update
14th May 20127:00 amRNSShareholder Circular and Notice of General Meeting
14th May 20127:00 amRNSAnnual Report and Accounts and Notice of AGM
8th May 20127:00 amRNSPreliminary Results
26th Apr 20127:00 amRNSOperational Update
11th Apr 20127:00 amRNSOperational update
20th Mar 20127:00 amRNSBNG Farm-out
8th Mar 20127:00 amRNSOperational Update
8th Feb 201212:36 pmRNSOperational Update
23rd Jan 20127:01 amRNSNW Konys Commences Pilot Production
3rd Jan 20127:00 amRNSNW Konys Pilot Production Consent Update
22nd Dec 20111:25 pmRNSOil Well Spudding
19th Dec 20117:00 amRNSSpudding of BNG Well 136
15th Dec 201112:38 pmRNSREPLACEMENT - Award of options
15th Dec 20117:00 amRNSAward of options
7th Dec 20117:00 amRNSGas Flaring Consent Update
29th Nov 20117:01 amRNSNK-10 Well Spudded 28 November 2011
22nd Nov 20117:00 amRNSOperational Update
18th Nov 201110:01 amRNSDirector/PDMR Shareholding
9th Nov 20115:00 pmRNSHolding(s) in Company
2nd Nov 201112:51 pmRNSHolding(s) in Company
1st Nov 20117:00 amRNSOperational Update
31st Oct 20111:15 pmRNSDirector/PDMR Shareholding
20th Oct 20117:00 amRNSOperational Update
17th Oct 201111:28 amRNSDirector/PDMR Shareholding
29th Sep 20118:51 amRNSReplacement of New Debt Facility
29th Sep 20117:00 amRNSNew debt facility
26th Sep 20117:00 amRNSInterim Results
8th Sep 201112:09 pmRNSShare Price Movement
18th Jul 20117:00 amRNSOperational Update
27th Jun 201111:21 amRNSResult of AGM
27th Jun 20117:00 amRNSBNG Operational Update
6th Jun 20117:00 amRNSAppointment of Nominated Adviser and Broker
27th May 20117:00 amRNSAnnual Report and Accounts and Notice of AGM
20th May 20117:00 amRNSPreliminary Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.