SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q3 2019 Operations Update

8 Oct 2019 07:00

RNS Number : 0471P
Central Asia Metals PLC
08 October 2019
 

8 October 2019

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q3 2019 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q3 2019 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

Highlights

- Production on track to meet full year guidance for copper, zinc and lead

- Q3 2019 Kounrad

§ Copper produced, 4,039 tonnes

- Q3 2019 Sasa

§ Zinc in concentrate produced, 6,186 tonnes

§ Lead in concentrate produced, 7,362 tonnes

 

CAML production summary

Metal production (tonnes)

Q3 2019

9m 2019

9m 2018

Copper

4,039

10,633

10,686

Zinc

6,186

17,703

16,762

Lead

7,362

21,718

21,988

 

Nigel Robinson, Chief Executive Officer, commented:

"I am pleased that we have once again delivered on track production from Sasa and Kounrad, and to report that we have had no lost time injuries at either operation during Q3 2019."

Kounrad

Kounrad Q3 2019 copper production of 4,039 tonnes brings output for the first nine months of 2019 to 10,633 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 93,107 tonnes.

Total copper recovered from the Western Dumps in 2019 so far is 7,219 tonnes, equating to approximately 68% of the amount plated.

During Q3 2019, preparations for the forthcoming winter operating period were substantially completed. Capital works focussed on the extension of collector trenches around Dump 22, and modifications to the diameter of pipelines transferring solutions from the Western Dumps to the solvent extraction facility.

Copper sales during Q3 2019 were 3,614 tonnes, bringing the total for the first nine months of the year to 10,075 tonnes.

Sasa

In Q3 2019, mined and processed ore totalled 207,016 tonnes and 210,237 tonnes respectively, bringing the total for the first nine months of 2019 to 607,267 tonnes of ore mined and 614,777 tonnes of ore processed. The average head grades for the quarter were 3.37% zinc and 3.71% lead, and for the first nine months of 2019 were on average 3.31% and 3.74% respectively. The average 2019 metallurgical recoveries to 30 September were 86.9% for zinc and 94.4% for lead.

Sasa produces a zinc concentrate and a separate lead concentrate. In Q3 2019, 12,385 tonnes of concentrate containing 50.0% zinc and 10,245 tonnes of concentrate containing 71.9% lead were produced. Total production for the first nine months of 2019 was 35,690 tonnes of zinc concentrate at an average grade of 49.6% and 29,965 tonnes of lead concentrate at an average grade of 72.5%.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2019 payable production of zinc was 5,195 tonnes and of lead was 6,993 tonnes, bringing total 2019 payable production to 30 September to 14,847 tonnes of zinc and 20,632 tonnes of lead. Given that deliveries from Sasa to the smelters occur on a regular basis, payable base metal in concentrate sales for the nine-month period were similar at 14,831 tonnes of zinc and 20,649 tonnes of lead.

During the first nine months of 2019, Sasa sold 254,617 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.

During Q3 2019, the construction and lining of Tailings Storage Facility 4 ('TSF4') were completed.

 

Units

 Q3 2019

9m 2019

9m 2018

Ore mined

t

207,016

607,267

597,338

Plant feed

t

210,237

614,777

599,619

Zinc grade

%

3.37

3.31

3.31

Zinc recovery

%

87.3

86.9

84.5

Lead grade

%

3.71

3.74

3.91

Lead recovery

%

94.4

94.4

93.7

Zinc concentrate

t (dry)

12,385

35,690

34,282

- Grade

%

50.0

49.6

48.9

- Contained zinc

t

6,186

17,703

16,762

Lead concentrate

t (dry)

10,245

29,965

30,167

- Grade

%

71.9

72.5

72.9

- Contained lead

t

7,362

21,718

21,988

 

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson, CEO

 

Gavin Ferrar, CFO

 

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

 

 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

 

James Bavister

 

David McKeown

 

 

 

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Jeff Couch

 

Thomas Rider

 

Neil Elliot

 

 

 

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

 

Camilla Horsfall

 

Megan Ray

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia.

For further information, please visit: www.centralasiametals.com and https://twitter.com/CamlMetals

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDEDLFBKBFEFBE
Date   Source Headline
11th Jun 20265:40 pmRNSTR-1: Form for notification of major holdings
10th Jun 20267:00 amRNSTrading Update and Outlook
9th Jun 20265:14 pmRNSTR-1: Notification of major holdings
9th Jun 20267:00 amRNSTR-1: Notification of major holdings
8th Jun 202612:25 pmRNSShare Purchase by a Director
2nd Jun 20269:36 amRNSTR-1: Notification of major holdings
2nd Jun 20267:06 amRNSProposed acquisition of Cygnus Metals Limited
29th May 20266:03 pmRNSTR-1: Notification of major holdings
20th May 202612:14 pmRNSTR-1: Notification of major holdings
19th May 20265:47 pmRNSTR-1: Notification of major holdings
18th May 20262:37 pmRNSResults of 2026 Annual General Meeting (AGM)
11th May 202612:03 pmRNSShare Premium Cancellation Effective
6th May 20266:00 pmRNSTR-1: Notification of major holdings
5th May 202610:59 amRNSTR-1: Notification of major holdings
1st May 20263:24 pmRNSTR-1: Notification of major holdings
30th Apr 202611:32 amRNSChange of registered office address
16th Apr 20267:00 amRNSQ1 2026 Operations Update
15th Apr 20269:17 amRNSAnnual Report and Accounts 2025 and Notice of AGM
15th Apr 20267:00 amRNSPublication of 2025 Sustainability Report
10th Apr 20261:14 pmRNSTR-1: Notification of major holdings
31st Mar 202612:49 pmRNSTotal Voting Rights
30th Mar 202611:40 amRNSResults of Extraordinary General Meeting
30th Mar 20268:28 amRNSTR-1: Notification of major holdings
19th Mar 20267:00 amRNS2025 Full-Year Results
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
10th Mar 20267:00 amRNSProposed Share Premium Cancellation and EGM Notice
5th Mar 20267:00 amRNSTransaction in Own Shares
4th Mar 20267:00 amRNSTransaction in Own Shares
3rd Mar 20267:00 amRNSSasa Mineral Resource and Ore Reserve Statement
3rd Mar 20267:00 amRNSNotice of Results
3rd Mar 20267:00 amRNSTransaction in Own Shares
2nd Mar 20267:00 amRNSTransaction in Own Shares
27th Feb 20265:43 pmRNSTotal Voting Rights
18th Feb 20267:00 amRNSTransaction in Own Shares
17th Feb 20267:00 amRNSTransaction in Own Shares
16th Feb 20267:00 amRNSTransaction in Own Shares
13th Feb 20267:00 amRNSTransaction in Own Shares
12th Feb 20267:00 amRNSTransaction in Own Shares
6th Feb 20265:04 pmRNSTR-1: Notification of major holdings
5th Feb 20267:00 amRNSTransaction in Own Shares
4th Feb 20267:00 amRNSTransaction in Own Shares
3rd Feb 20267:00 amRNSTransaction in Own Shares
2nd Feb 20267:00 amRNSTransaction in Own Shares
30th Jan 20265:46 pmRNSTotal Voting Rights
28th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
22nd Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
19th Jan 20267:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.