Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadogan Regulatory News (CAD)

Share Price Information for Cadogan (CAD)

Share Price is delayed by 15 minutes
Get Live Data
3.75    0.00 (0.00%)
Bid:
3.50
Ask:
4.00
Spread: 0.50 (14.286%)
Market Cap: £9.42m
CAD Live PriceLast checked at - London Stock Exchange

Intraday Cadogan Share Chart

Updated Reserves and Resources Report

23 Mar 2010 12:52

RNS Number : 0297J
Cadogan Petroleum PLC
23 March 2010
 



Cadogan Petroleum PLC

("Cadogan" or the "Company")

Updated Reserves and Resources Report

 

As advised during 2009, the Board commissioned an independent Reserves and Resources Evaluation of the Group's assets in Ukraine, as at 31 December 2009 (the "Report"). The Board received the Report on 22 March 2010 and the results of the Report are summarised in the tables below.

SUMMARY OF RESERVES

AS OF 31 DECEMBER 2009

Working interest basis

Gas

bcf

Condensate

mmbbl

Oil

mmbbl

Proved and Probable Reserves at 1 January 2009

330.5

22.7

0.8

Revisions

(318.5)

(22.1)

(0.8)

Production

(0.5)

-

-

Proved and Probable Reserves at 31 December 2009

11.5

0.6

-

Possible Reserves at 1 January 2009

284.0

21.2

0.9

Revisions

(264.5)

(19.7)

(0.9)

Possible Reserves at 31 December 2009

19.5

1.5

-

 

SUMMARY OF CONTINGENT RESOURCES

AS OF 31 DECEMBER 2009

 

Working interest basis

Gas

bcf

Condensate

mmbbl

Oil

mmbbl

Total

mmboe

Contingent Resources at 1 January 2009

1,583.2

48.0

1.5

334.4

Revisions

904.8

(60.1)

(1.5)

221.5

Contingent Resources at 31 December 2009

2,488.0

108.1

-

555.9

The most significant change in the Group's Reserves and Resources, as compared to 1 January 2009, is the reclassification of most of the Reserves in the Pirkovskoe field as Contingent Resources. Additionally, best estimate Prospective Resources of 237 bcf gas and 8.4 mmbbl of condensate are attributed to the Pokrovskoe prospect.

Despite the re-classification, the Group retains a significant level of Reserves and Contingent and Prospective Resources. Successful operations in the future (based on in-house studies underway or completed) should enable some of these Resources to be re-classified as Reserves.

The reason for this re-classification is the disappointing results of the drilling campaign conducted by the Group during 2008 and the first part of 2009, under the previous management. Although petrophysical analysis of the well log data provided very promising results, the test results failed to meet expectations. This could be a function of either reservoir characteristics or poor drilling and testing practices. At that time, the Group relied upon low-cost Ukrainian drilling rigs and testing technology, and as a result wells drilled lack mechanical integrity. During testing, the procedures applied and tools utilised were frequently insufficient to adequately perforate and stimulate the reservoir intervals. This was a conclusion of the independent report on well testing commissioned by the new management team in 2009, which was critical of and questioned many of the previous well testing practices.

There have also been some revisions to the Resource estimates in Pirkovskoe and Zagoryanska based on a preliminary interpretation of the 3D seismic data. This interpretation was carried out by the local contractor, Ukrgeofizika, and was considered to be inaccurate, as it relied heavily on the structural model based on pre-conceived geological concepts. An in-house interpretation of the 3D seismic and well data is currently being prepared.

In the new Report, Reserves are only assigned to the currently producing fields, specifically Pirkovskoe, Debeslavetska and Cheremkhivske. Sloboda Rungurske field is excluded, as production is currently considered uneconomical, pending further analysis.

Contingent Resources are assigned to Pirkovskoe, Zagoryanska, Boryna and Bitlya fields, where development is contingent on further appraisal. The positive revision of 904.8 bcf in the Contingent Resources category comprises 583 bcf of reclassified 3P reserves from Pirkovskoe field plus 321.8 bcf of additional contingent resources from the Boryna field and the Zagoryanska field.

Prospective Resources are attributed to Pokrovskoe, where there has not yet been a production test.

The Board is considering how the report will impact the Group's financial statements, which it expects to issue in April 2010. In line with earlier announcements the Board also continues to evaluate alternative methods of maximizing value for shareholders and expects to make a recommendation early in Q2 2010.

-ENDS-

Enquiries:

Cadogan Petroleum

+44 20 7245 0801 

Ian Baron

Stefan Bort

 

Pelham Bell Pottinger

 

Evgeniy Chuikov

+44 20 7337 1513

Phillip Dennis

+44 20 7337 1516

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRLLFSFVDIVFII
Date   Source Headline
19th Nov 20197:00 amPRNMonastyretska license
15th Nov 20194:50 pmPRNSale of Astroinvest Ukraine
15th Nov 20193:45 pmPRNResult of General Meeting, new CEO and new Chairman
4th Nov 20194:11 pmPRNOperations Update
1st Nov 20196:29 pmPRNExtension of the CEO mandate
21st Oct 20195:22 pmPRNGeneral Meeting
8th Oct 20197:00 amPRNTrading Update
2nd Oct 20199:51 amPRNReceipt of notice of requisition of general meeting
1st Oct 20194:29 pmPRNSale of Gazvydobuvannya
30th Sep 20197:00 amPRNIntention to requisition a general meeting
27th Aug 20197:00 amPRNHalf-year Report
20th Aug 201910:13 amPRNHolding(s) in Company
20th Aug 201910:07 amPRNHolding(s) in Company
29th Jul 20193:17 pmPRNProger Update
18th Jul 201910:00 amPRNDirectorate Change
3rd Jul 20192:56 pmPRNLicense Application
19th Jun 20192:00 pmPRNResult of AGM
30th May 20197:00 amPRNWell Update
21st May 20192:31 pmPRNReport on Payments to Governments
17th May 20192:38 pmPRNAnnual Financial Report and Notice of AGM
30th Apr 20199:36 amPRNWell Update
25th Apr 201912:05 pmPRNWell Update
24th Apr 20197:00 amPRNAnnual Financial Report
18th Apr 20192:05 pmRNSSecond Price Monitoring Extn
18th Apr 20192:00 pmRNSPrice Monitoring Extension
18th Apr 201911:05 amRNSSecond Price Monitoring Extn
18th Apr 201911:00 amRNSPrice Monitoring Extension
9th Apr 20194:09 pmPRNOperational Update
8th Apr 20194:41 pmRNSSecond Price Monitoring Extn
8th Apr 20194:35 pmRNSPrice Monitoring Extension
27th Feb 20199:05 amRNSSecond Price Monitoring Extn
27th Feb 20199:00 amRNSPrice Monitoring Extension
26th Feb 20194:34 pmPRNCorrection:Loan and related call-option agreement
26th Feb 201910:01 amPRNExecution of a loan and related call-option agreement
16th Jan 20197:00 amPRNOperational Update
16th Nov 20182:02 pmPRNOperational Update
12th Nov 20189:58 amPRNExit from the shale gas project in Ukraine
8th Nov 201810:48 amPRNWell Update
27th Sep 201810:02 amPRNOperational Update
21st Aug 20182:00 pmPRNHalf Yearly Report for the Six Months ended 30 June 2018
7th Aug 201810:01 amPRNCadogan Ukraine ISO Certification
21st Jun 20187:00 amPRNResult of AGM
30th May 20187:00 amPRNSuccessful Workover Campaign Increases Production
17th May 20183:30 pmPRNAnnual Financial Report and Notice of AGM
15th May 20184:48 pmPRNDelayed approval of the application to renew
8th May 20187:00 amPRNReport on Payments to Governments
26th Apr 20187:29 amPRNAnnual Financial Report
23rd Mar 201811:08 amPRNOperations Update
22nd Feb 201811:07 amPRNOperations Update
24th Jan 20189:58 amPRNOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.