Operational Update

30 Oct 2017 07:00

RNS Number : 9042U
Cabot Energy PLC
30 October 2017
 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

30 October 2017

Cabot Energy Plc

("Cabot Energy" or "the Company")

Operational update

New corporate presentation

Cabot Energy (AIM: CAB), the AIM quoted oil and gas company focused on production led growth balanced with high impact exploration and appraisal opportunities, provides the following update on the Company's drilling operations in Canada.

16-05 side track well - well tested at significantly higher rates than forecast

§ The side track of the 16-05 well in the Rainbow area has been drilled, completed and is on production to the 13-36 facility through an existing pipeline

§ Following completion of the well, it was tested for a 24 hour period which saw near virgin reservoir pressure and natural flow:

- total oil produced during the 24 hour period, while restricted by a 9.5 millimetre (24/64 inch) choke, was 573 barrels of oil

- the well was producing at a rate of 680 barrels of oil per day ("bopd") by the end of the test period as the well flow cleaned up

§ The side track was drilled out from the original vertical well at a subsurface depth of 1,420 metres

- approximately 200 metres of the new deviated well bore intersected the targeted higher permeability section of the reservoir and was completed open hole to maximise reservoir productivity

§ The well is producing under natural flow and, following pump installation next week, is planned to be produced at a restricted rate of 200 to 225 bopd to best manage the longer term production potential of the reservoir

Remaining operations for 2017 - second side track to be drilled and dual completion well to be brought online

§ The drilling rig used for the 16-05 side track will be moved to the next planned side track well once the ground has become sufficiently frozen to enable heavy traffic

- this is expected to occur by early December 2017 and the well brought into production before the year end, assuming successful operations

§ The regulatory approval process to inject water down the 13-33 well, which was dual completed as part of the summer work programme, is almost complete

- this is planned to be equipped and brought into production during November at a forecast 40 to 50 bopd

§ Planning for the 2018 winter work programme is advanced with up to four further side track locations being assessed for drilling in addition to a well workover campaign of up to ten candidates

The Company is on track to achieve its forecast exit production rate of 800 to 1,000 bopd, of which Cabot Energy owns 75 per cent.

 

Keith Bush, Chief Executive Officer of Cabot Energy, commented:

"The 16-05 side track result exceeded our expectations and strongly supports our technical view on the potential of the Canadian assets. The Company's existing Rainbow and Virgo acreage has many future side track candidates and high grading this inventory to provide low risk production growth at competitive investment metrics is the current priority.

"The subsurface and operational work undertaken during 2017 has greatly advanced our understanding of the Canadian assets and the true potential of the position, and we look forward to creating further low cost production growth via our 2018 winter work programme."

 

A new corporate presentation will be made available on the Company's website later today.

 

- Ends-

For further information please contact:

 

Cabot Energy Plc

+44 (0)20 7469 2900

Keith Bush, Chief Executive Officer

Nick Morgan, Finance Director

SP Angel Corporate Finance LLP

+44 (0)20 3470 0470

Nominated Adviser and Joint Broker

Richard Morrison, Richard Redmayne, Stephen Wong

FirstEnergy Capital LLP

+44 (0)20 7448 0200

Joint Broker

Jonathan Wright

FTI Consulting

+44 (0)20 3727 1000 

Financial PR

Edward Westropp

 

 

In Accordance with AIM Rules - Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and signed off by the CEO of Cabot Energy, Mr Keith Bush, who has 25 years' experience as a petroleum engineer. He has read and approved the technical disclosure in this regulatory announcement. The technical disclosure in this announcement complies with the SPE standard.

 

Note to Editors:

Cabot Energy is an oil and gas company focused on production led growth. The Company is undertaking a redevelopment and production project in north west Alberta and has a broader portfolio of exploration and appraisal opportunities in countries of relatively low political risk, primarily Italy. Comprehensive information on Cabot Energy and its oil and gas operations, including press releases, annual reports and interim reports are available from Cabot Energy's website: www.cabot-energy.com

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDLFFVLIALAFID
Date   Source Headline
23rd Jul 20072:00 pmPRNOttoland Well Testing - Progress Statement
11th Jul 20077:30 amPRNOttoland Progress Report
11th Jul 20077:02 amPRNHolding(s) in Company
11th Jul 20077:01 amPRNHolding(s) in Company
11th Jul 20077:00 amPRNHolding(s) in Company
3rd Jul 20077:00 amPRNOperations Update
28th Jun 20077:00 amPRNDirector/PDMR Shareholding
27th Jun 200711:09 amPRNResult of AGM
25th Jun 20079:34 amPRNAward of Two Offshore Licences
20th Jun 20077:00 amPRNOttoland Oil Drilling Successful
6th Jun 20077:00 amPRNNotification of Shareholding
31st May 20077:05 amPRNNotice of AGM
31st May 20077:00 amPRNTotal Voting Rights
24th May 20078:43 amPRNNotification of Shareholding
23rd May 20079:31 amPRNNotification of Shareholding
21st May 20078:16 amPRNAdditional Listing
16th May 20077:00 amPRNFinal Results
10th May 20072:30 pmPRNNotice of Results
8th May 200710:00 amPRNAppointment of Exploration and Technical Director
4th May 20077:00 amPRNNotification of Shareholding
30th Apr 200711:06 amPRNUtrecht Exploration Licence Awarded
30th Apr 20077:05 amPRNTotal Voting Rights
30th Apr 20077:00 amPRNNotification of Shareholding
27th Apr 200710:16 amPRNCorrection : Additional Listing
27th Apr 200710:11 amPRNNotification of Shareholding
27th Apr 20079:38 amPRNAdditional Listing
25th Apr 200710:24 amPRNNotification of Shareholding
23rd Apr 200711:01 amPRNNotification of Shareholding
23rd Apr 20077:00 amPRNAgreements with Dyas BV worth EUR32 million
18th Apr 200712:38 pmPRNCorrection : Notification of Shareholding
18th Apr 200711:23 amPRNNotification of Shareholding
3rd Apr 200712:00 pmPRNDirector Shareholding
2nd Apr 20077:00 amPRNWaalwijk Gas Storage Agreement with Star Energy
30th Mar 20077:00 amPRNAward of Exploration Licence and Drilling Update
27th Mar 20077:00 amPRNPurchase of Waalwijk Licence Interest
9th Mar 20074:18 pmPRNNotification of Shareholding
2nd Mar 200712:06 pmPRNNotification of Shareholding
1st Mar 20077:00 amPRNDirector/PDMR Shareholding
26th Feb 20077:00 amPRNFinal Decree of Three Offshore Italian licences
15th Feb 20073:00 pmPRNNetherlands - Development Update
6th Feb 200712:30 pmPRNNotification of Shareholding
17th Jan 200711:29 amPRNNetherlands Drilling Rig Contract Signed
11th Jan 20077:00 amPRNNotification of Shareholding
22nd Dec 20068:28 amPRNTotal Voting Rights
4th Dec 20067:00 amPRNNotification of Shareholding
28th Nov 200610:00 amPRNSeismic survey enhances offshore Sicily projects
13th Nov 20061:36 pmPRN
6th Nov 20061:14 pmPRNIssue of Warrants
1st Nov 20062:56 pmPRNAdditional Listing
31st Oct 20068:00 amPRNProvision of Finance Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.