If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.125    -0.01 (-7.41%)
Bid:
0.12
Ask:
0.13
Spread: 0.01 (8.333%)
Market Cap: £27.92m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Hope & Gorob Copper - Gold Project, Namibia Update

13 Jun 2024 07:00

RNS Number : 2282S
Bezant Resources PLC
13 June 2024
 

13 June 2024

 

Bezant Resources PLC

("Bezant Resources", "BZT" or "the Company")

Update for the Hope & Gorob Copper - Gold Project, Namibia

 

 

Bezant Resources ("Bezant" or the "Company") is pleased to provide an update on the Hope & Gorob Copper - Gold Project in Namibia. Letters of preparedness have been received from the main contractors responsible for future mining, processing plant construction and concentrate haulage and Letters of Intent and offers for financing of an off-grid hybrid renewable power supply for the Project. 

 

Whilst the mining licence is pending, the Company has progressed all other technical aspects of the Project including the finalisation of infrastructure, mine and pre-concentrator final designs, audit and costing for the repurposing of an existing flotation plant located within trucking distance of Hope & Gorob to process pre-concentrate from the new mine and the adoption of a renewable energy solution building on existing environmental initiatives included in plant design. Other environmental initiatives include, amongst others, minimising water consumption on site through the use of dry ore sorting as a pre-concentration step.

 

Highlights

 

· A leading contracting group has provided a final set of competitive unit costs for mining, ore haulage to the ore sorting plant, haulage of pre-concentrate and the transfer of a final concentrate to Walvis Bay for export. Individual unit costs are in line with costs used in financial modelling.

· An international engineering group has confirmed its' readiness for the construction and installation of the front-end crushing, ore sorting and conveying circuits. With offices and workshops located in Swakopmund, the group is well-placed to complete the project and provide continuous support and maintenance services.

· Preferred engineering, construction, and project management ("EPCM") supplier has been identified and proposal received for the upgrading and repurposing of the existing available flotation plant and Tailings Storage Facility ("TSF")

· Technical design and costing of a hybrid power supply solution including renewables for the mine site has been completed and discussions are underway to finalise a Power Purchase Agreement ("PPA") for the installation of the bulk power supply.

 

Commenting on progress, Colin Bird Chairman said "We are pleased we have completed the chain of contractor services that will make up the Hope & Gorob mining operation. We are delighted with the feedback and response from the contracting community, and we look forward to working with quality names in a quality jurisdiction on a quality project.

 

In essence all the components required to start a new project are in place and the Hope & Gorob has the makings of a pathfinder project for Bezant's mining aspirations in southern Africa.

 

The project will be launched with a modest and readily achievable output of copper together with a well-recognised potential to grow into a medium scale operation and accordingly we intend to divert cashflow into a significant exploration programme, the success of which will benefit all stakeholders".

 

For further information, please contact:

Bezant Resources Plc 

Colin Bird Executive Chairman

 

+44 (0) 20 3416 3695

Beaumont Cornish (Nominated Adviser) Roland Cornish / Asia Szusciak

+44 (0) 20 7628 3396

Novum Securities Limited (Joint Broker)

Jon Belliss

 

+44 (0) 20 7399 9400

Shard Capital Partners LLP (Joint Broker)

Damon Heath

 

+44 (0) 20 7186 9952

 

or visit http://www.bezantresources.com

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law pursuant to the Market Abuse (Amendment) (EU Exit) regulations (SI 2019/310).

 

Beaumont Cornish Limited ("Beaumont Cornish") is the Company's Nominated Adviser and is authorised and regulated by the FCA. Beaumont Cornish's responsibilities as the Company's Nominated Adviser, including a responsibility to advise and guide the Company on its responsibilities under the AIM Rules for Companies and AIM Rules for Nominated Advisers, are owed solely to the London Stock Exchange. Beaumont Cornish is not acting for and will not be responsible to any other persons for providing protections afforded to customers of Beaumont Cornish nor for advising them in relation to the proposed arrangements described in this announcement or any matter referred to in it.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFTMMTMTIBTII
Date   Source Headline
11th Jul 20252:46 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 20252:50 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 202511:14 amRNSMankayan Project Update
8th Jul 20258:03 amRNSHolding(s) in Company
2nd Jul 202511:08 amRNSMankayan Project Update
2nd Jul 20257:00 amRNSNotice of AGM
30th Jun 20257:00 amRNSFinal Results
27th Jun 20259:18 amRNSMankayan Project - Blackstone Shares & Corporate
26th Jun 20253:21 pmRNSHolding(s) in Company
25th Jun 20257:00 amRNSHope & Gorob Award of Mining Licence
18th Jun 20258:21 amRNSUpdate - Blackstone & IDM Merger Becomes Effective
17th Jun 20254:14 pmRNSMankayan Project Update - Blackstone & IDM Merger
10th Jun 20252:49 pmRNSMankayan Project Update - Blackstone & IDM Merger
21st May 20257:00 amRNSCompletion of disposal of Eureka Project
19th May 20257:00 amRNSIssue of Equity and TVR
1st May 202512:00 pmRNSProposed sale of Eureka Project in Argentina
16th Apr 202511:01 amRNSHolding(s) in Company
16th Apr 20257:02 amRNSProposed sale of Eureka Project in Argentina
3rd Apr 20255:04 pmRNSAward of Environmental Clearance Certificate
3rd Apr 202511:50 amRNSMankayan Project Update
2nd Apr 202510:27 amRNSHope & Gorob Approval of ECC
18th Mar 20255:20 pmRNSDirector/PDMR Shareholding
5th Mar 20259:11 amRNSMankayan Project Update - Visible Gold Discovered
27th Feb 20257:00 amRNSFunding Facility Repayment Extension
25th Feb 20257:45 amRNSProposed sale of Eureka Project in Argentina
21st Feb 20259:31 amRNSHolding(s) in Company
18th Feb 202510:40 amRNSHolding(s) in Company
12th Feb 20257:00 amRNSHope & Gorob Ore Sorting Optimisation
6th Feb 20258:44 amRNSMankayan Project Update
30th Jan 20257:00 amRNSHope & Gorob Mine Planning Update
2nd Jan 20253:31 pmRNSReplacement: Fundraising, Directors' Holdings, TVR
27th Dec 20247:00 amRNSReplacement: Fundraising, Directors' Holdings, TVR
24th Dec 202412:21 pmRNSFundraising, Directors' holdings, Fee shares, TVR
15th Nov 202411:04 amRNSHope & Gorob Mine Planning Update
7th Nov 20247:00 amRNSHope & Gorob Optimisation & Geotechnical Drilling
1st Nov 202410:10 amRNSHope & Gorob Gold Contribution Review
1st Nov 20249:30 amRNSTotal Voting Rights
30th Oct 20247:00 amRNSPCB Gold Project Update, Zambia
29th Oct 20249:11 amRNSHolding(s) in Company
16th Oct 20247:00 amRNSRe Granting of Mining Licence for Hope & Gorob
2nd Oct 20243:31 pmRNSFundraising, Issue of Equity and TVR
30th Sep 20247:00 amRNSUnaudited Interim Results
26th Sep 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
28th Aug 20247:00 amRNSHope & Gorob Copper-Gold Project Permitting Update
27th Aug 20247:00 amRNSGeophysical Surveying at Kanye Manganese Project
19th Aug 202411:26 amRNSDirector's Dealings
8th Aug 20247:00 amRNSPlacing Issue of Shares PDMR Shareholdings REPLACE
6th Aug 20242:16 pmRNSDirector's Dealings
31st Jul 20242:13 pmRNSResult of AGM
24th Jul 20247:45 amRNSLOI re sustainable energy supply for Hope & Gorob

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.