George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.35
Bid: 0.30
Ask: 0.40
Change: 0.00 (0.00%)
Spread: 0.10 (33.333%)
Open: 0.35
High: 0.35
Low: 0.35
Prev. Close: 0.35
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Thorny River project development

28 Feb 2019 10:27

RNS Number : 4329R
Botswana Diamonds PLC
28 February 2019
 

28th February 2019

 

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Update on Thorny River project development

 

· Bulk sampling on track to commence in Q2 2019 subject to approvals.

· Eighteen drill holes completed to define the bulk sampling plan; kimberlite found in twelve.

· One hole hit a 4.5 metre kimberlite intersection, the thickest to date.

· A mantle xenolith was found, this is indicative of high diamond content.

· Further drilling will be undertaken on two adjacent sites which may contain kimberlite blows. A gravity survey is underway on these areas.

· Refurbishment of the nearby diamond processing plant is underway. This plant will process the Thorny River material.

 

Botswana Diamonds ("BOD") the AIM and BSE listed explorer is pleased to announce that the first phase of the intensification drilling programme on Thorny River has been concluded with drilling complete on the farm Hartbeesfontein. Eighteen holes have been drilled with twelve intersecting kimberlite. A bulk sampling target of 1.5 km of kimberlite fissure intersection has been identified.

 

The second phase of the drilling programme, taking place on the farm Frischgewaagt has commenced with three holes drilled so far, all of which intersected kimberlite. The third hole intersected 4.5m of kimberlite fissure down the hole, which is the thickest section intersected to date on the project. This hole also produced a mantle xenolith (eclogite) composed of clinopyroxene and garnet which is indicative of high diamond content.

 

The third and final phase of the drilling programme will commence once a detailed gravity survey has been concluded over two potential kimberlite blows on the same property.

 

The purpose of this drilling programme is to enable detailed planning for a bulk sampling programme, which will commence on completion of drilling activities and after the necessary regulatory approvals have been received (which are expected within the next two months). Refurbishment is currently underway of a nearby diamond processing plant to process the bulk sample kimberlite.

 

Work has commenced on potential secondary (alluvial) diamond deposits in the project area. The nearby and worked-out Marsfontein diamond mine was host to eluvial diamond deposits running at grades of 1,433 cpht.

 

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the Southern African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Metals and Mining (UK) and with over 33-years' experience in the diamond sector. 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014. The person who arranged for the release of this announcement on behalf of the Company was James Campbell, Director

 

A copy of this announcement is available on the Company's website, at www.botswanadiamonds.co.uk

ENDS

 

Enquiries:

Botswana Diamonds PLC John Teeling, Chairman

James Campbell, Managing Director

Jim Finn, Director

 

 

+353 1 833 2833

+27 83 457 3724

+353 1 833 2833

Beaumont Cornish - Nominated Adviser Michael Cornish

Roland Cornish

 

+44 (0) 020 7628 3396

SVS Securities Plc - Broker Tom Curran

Ben Tadd

 

+44 (0) 20 3700 0100

 

Blytheweigh - PRJulia TilleyFergus Cowan

+44 (0) 20 7138 3206

+44 (0) 207 138 3553

+44 (0) 207 138 3208

Teneo

Luke Hogg

Alan Tyrrell

 

+353 (0) 1 661 4055

+353 (0) 1 661 4055

 

 

www.botswanadiamonds.co.uk

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAEAPAADNEFF
Date   Source Headline
7th Oct 20157:00 amRNSExploration Update on Drilling in Orapa
11th Sep 20157:00 amRNSExploration Update
3rd Sep 20157:00 amRNSUpdate on Exploration in Botswana
19th Jun 20154:06 pmRNSCompany Presentation
18th Jun 20157:47 amRNSExploration Update - June 2015
1st May 201511:15 amRNSChange of Adviser
15th Apr 20157:00 amRNSCompany Expands Exploration with 3 New Licences
8th Apr 20152:53 pmRNSIssue of Shares and Directors' Dealings
31st Mar 201510:24 amRNSBotswana Diamonds Fundraising
27th Mar 20157:00 amRNSInterim Results
24th Mar 20157:00 amRNSNew Licence in Orapa, Botswana
11th Mar 20154:40 pmRNSSecond Price Monitoring Extn
11th Mar 20154:35 pmRNSPrice Monitoring Extension
5th Mar 20157:00 amRNSField Exploration Update - Orapa, Botswana
23rd Feb 20154:40 pmRNSSecond Price Monitoring Extn
23rd Feb 20154:35 pmRNSPrice Monitoring Extension
19th Dec 201412:39 pmRNSResult of AGM
24th Nov 20147:00 amRNSPreliminary Results for Year Ended 30 June 2014
2nd Oct 20147:00 amRNSDrilling Update at Orapa
18th Sep 20147:00 amRNSDrilling Update at Orapa
2nd Sep 201411:30 amRNSNon-Executive Director Appointment
13th Aug 20147:00 amRNSExploration in Orapa, Botswana
8th Aug 20147:00 amRNSDrilling Programme in Orapa
20th Jun 20147:00 amRNSIssue of Equity and Directors' Shareholding
5th Jun 20147:00 amRNSFirst results on PL117 exploration programme
2nd Jun 20147:00 amRNSLiquidation of Interest in Bugeco
27th May 20147:00 amRNSNew Licences awarded in Orapa region of Botswana
30th Apr 20147:00 amRNSInitial Outcome of Fieldwork at PL117 Licence
31st Mar 20147:00 amRNSInterim Results
26th Mar 20147:00 amRNSCompletion of initial fieldworks at PL117 licence
19th Feb 20147:00 amRNSAlrosa Geologists join Botswana team
4th Feb 201411:31 amRNSIssue of Equity
31st Jan 201410:03 amRNSTotal Voting Rights
30th Jan 20147:00 amRNSAppointment of Joint Broker
20th Jan 201412:11 pmRNSIssue of Equity
14th Jan 20147:00 amRNSPL117 Exploration Work Underway
2nd Jan 201410:50 amRNSTotal Voting Rights
20th Dec 201312:30 pmRNSResult of AGM
20th Dec 20137:00 amRNSAGM Statement
13th Dec 20137:00 amRNSFundraising of £740,000
22nd Nov 20137:00 amRNSPreliminary Results for the Year Ended 30 June 13
19th Aug 20137:00 amRNSJoint Venture in Botswana
7th Aug 20137:00 amRNSEversharp Investments Joint Venture Agreed
31st Jul 20137:00 amRNSBrightstone Joint Venture Agreed on 13 Licences
2nd May 20137:00 amRNSExtension of agreement on licences in Botswana
11th Apr 20137:00 amRNSOption agreement on prospecting licence
25th Mar 20137:00 amRNSInterim Results
19th Mar 20137:00 amRNSOption Agreement on two licences in Mozambique
12th Feb 20138:47 amRNSNew Broker in Botswana Appointed
5th Feb 20137:00 amRNSAgreement on 13 prospecting licences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.