The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.325
High: 0.33
Low: 0.325
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Thorny River Project - Grade & Volume update

25 Jan 2018 07:00

RNS Number : 8518C
Botswana Diamonds PLC
25 January 2018
 

25th January 2018

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Thorny River Project - Grade & Volume update

 

The board of Botswana Diamonds (AIM: BOD) is pleased to provide an update on its Thorny River Project which is part of the Vutomi earn-in arrangement in South Africa.

 

Highlights:

· Estimated Total Content grade range of 46 - 74 carats per hundred tonnes (cpht)

· Kimberlite dyke system estimated to contain between 1.20 - 2.1 M tons

 

John Teeling, chairman, commented:

"We have made rapid progress at Thorny River with the generation of volume and grade estimates following intensive exploration field work.  We recovered insufficient diamonds, particularly the bigger sizes, to produce a valuation which could be used in economic modelling. This will be addressed. The next work programme will include options to determine the economic viability of the resource."

 

Further Detail:

The Thorny River Project area consists of the farms Frischgewaagt, Hartbeesfontein and Doornrivier, which are located within the Limpopo Province of South Africa. The Project area encompasses the eastern extent of a kimberlite pipe/dyke complex, along which the former Marsfontein and current mothballed Klipspringer diamond mines occur. Both operations were previously mined by De Beers and SouthernEra in a joint venture and are currently owned by ASA Resources plc and are in the process of being disposed of.

 

A sample equivalent to 305.38 dry tons of kimberlite and host rock was taken late last year from a 42-metre trench on Frischgewaagt, along the strike of the dyke. 512 diamonds weighing 62.883 carats were recovered from this sample following treatment through an independent integrated processing facility, which comprised crushing and re-crush circuits, a Dense Media Separation ('DMS') plant and grease and x-ray technology for final recovery.

 

The data generated from the sample was assessed together with the results of the 2015 sampling campaign, as well as last year's microdiamond work, to derive an estimated (modelled) macro grade. The modelling, which was undertaken by Interlaced Consulting, considered host rock dilution, metallurgical process efficiencies and the various diamond size frequency distributions; the result is an estimated Total Content grade range of 46-74 cpht (at a bottom cut-off ('BCOS') of +1 mm). Modelling work was also undertaken by Busiswe Carol Ringane Pr.Sci.Nat and Dr Kurt Petersen, with consistent results. These correlate with the published resource grade of the neighbouring Klipspringer Mine of 49 cpht (BCOS of +1mm).

 

The valuation of the diamonds recovered, which was undertaken by international diamantaire Ray Ferraris, indicated the parcel average to be US$89/ct in the +11 diamond sieve class, which compares favourably with US$77/ct achieved in the same diamond sieve class from the 2015 sampling campaign. The average published diamond values achieved by Klipspringer were US$130/ct (at a BCOS of +1mm). However, the diamonds recovered were insufficient to produce a modelled diamond valuation; therefore the 2016 modelled diamond value of US$259/ct (at a BCOS of +2mm) continues to apply.

 

Gem quality diamonds comprised approximately two thirds of the value of the parcel. Less than 40% of the parcel illustrated medium or high fluorescence and less than 10% of the stones were chipped or broken. Yellow stones were also present and there was a small population of unusual colours which were near fancy. Large stones were expected. Their absence is being investigated.

 

The overall kimberlite volume has been modelled at 450,000 m3 - 470,000 m3 with additional potential volumes of 250,000 m3 - 330,000 m3 on which work is currently being undertaken. This equates to between 1.2 M tons - 2.1 M tons using an assessed density of 2.67t/m3.

 

The trenching exercise allowed for the verification of drilling and geophysical work. More geological work will be conducted at Thorny River to further refine grade and revenue estimates and extend volume estimates. The processed concentrates produced by the DMS will also be subject to further work. We will do more work to tighten the grade range, to expand the volume to find out where the large stones are and to examine economic development opportunities.

 

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the South African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Minerals and Mining with over 32-years' experience in the diamond sector.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

ENDS

 

 

 

Enquiries:

 

Botswana Diamonds PLC

John Teeling, Chairman

+353 1 833 2833

James Campbell, Managing Director

+27 83 457 3724

Jim Finn, Director

Northland Capital Partners Limited

David Hignell/Gerry Beaney (Corporate Finance)

+44 (0) 203 861 6625

John Howes (Broking)

Blytheweigh

+44 (0) 207 138 3204

Camilla Horsfall

+44 (0) 781 784 1793

Nick Elwes

+44 (0) 783 185 1855

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

www.botswanadiamonds.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDUSSBRWNAAUAR
Date   Source Headline
30th Mar 20209:00 amRNSPrice Monitoring Extension
25th Mar 202010:56 amRNSInterim Statement and Financial Results
18th Mar 20207:00 amRNSBulk sampling to commence on Marsfontein
2nd Mar 20205:01 pmRNSTotal Voting Rights
24th Feb 202012:27 pmRNSKimberlite intersected on Marsfontein
11th Feb 20201:13 pmRNSDrilling on Thorny River & Marsfontein Concessions
5th Feb 20202:51 pmRNSAppointment of Joint Broker
28th Jan 20207:00 amRNSPlacing to raise £250,000
12th Dec 201912:30 pmRNSResult of AGM
29th Nov 20194:54 pmRNSTotal Voting Rights
28th Nov 20197:00 amRNSZimbabwe Update
18th Nov 20194:49 pmRNSExercise of Warrants
15th Nov 20197:00 amRNSAnnual Results for the Year Ended 30 June 2019
12th Nov 201911:18 amRNSFirst diamonds recovered from Marsfontein Permit
28th Oct 20197:00 amRNSMarsfontein Mining Permit Granted
24th Sep 20192:05 pmRNSSecond Price Monitoring Extn
24th Sep 20192:00 pmRNSPrice Monitoring Extension
24th Sep 20197:00 amRNSMarsfontein Mining Contract Signed
12th Sep 20197:00 amRNSEnvironmental Authorisation - Marsfontein Gravels
2nd Sep 20197:00 amRNSKimberlite Pipe Potential at Thorny River
22nd Aug 20197:00 amRNSStrategic Licences Extended in Botswanan Kalahari
5th Aug 20195:04 pmRNSChange of adviser (broker)
1st Aug 20193:30 pmRNSTotal Voting Rights
18th Jul 20199:49 amRNSPlacing to raise £250,000
11th Jun 201910:30 amRNSDiamonds recovered from Thorny River Bulk Sampling
4th Apr 20197:00 amRNSUpdate on Thorny River project development
25th Mar 20197:00 amRNSInterim Results for the 6 Months Ended 31 Dec 18
28th Feb 201910:27 amRNSUpdate on Thorny River project development
18th Feb 201910:12 amRNSIntensification drilling on Thorny River
14th Feb 20192:50 pmRNSMarange Diamond Fields Grant of Right to Mine
23rd Jan 20197:00 amRNSPlacing to raise £370,000
3rd Jan 20197:00 amRNSChange of Nominated Adviser
14th Dec 20183:31 pmRNSVast Resources plc - Marange Diamond Field
14th Dec 201812:45 pmRNSBotswana Diamonds PLC - Results of AGM
28th Nov 20183:25 pmRNSHolding(s) in Company
19th Nov 20187:00 amRNSAnnual Results for the Year Ended 30 June 2018
15th Nov 20187:00 amRNSUpdate on Sunland Minerals JV
7th Nov 20187:00 amRNSAdvancements Towards Diamond Production
30th Oct 20183:33 pmRNSHolding in Company
17th Oct 20187:00 amRNSInitial assessment of the T1A Marange concession
4th Oct 20187:38 amRNSDiamond Concession Development Agreement Reached
25th Sep 20187:00 amRNSFree State Kimberlite Exploration Project Update
23rd Aug 20189:30 amRNSAccess Awarded for Diamond Concession in Zimbabwe
31st Jul 20187:00 amRNSUpdate on South African Exploration Projects
11th Jul 20189:20 amRNSKalahari Desert Exploration Update
6th Jun 20187:00 amRNSUpdate on South African Exploration Projects
1st May 20187:00 amRNSMoU for Exploitation of Diamonds in Zimbabwe
21st Mar 20187:00 amRNSInterim Results for the 6 Months Ended 31 Dec 17
13th Mar 20187:00 amRNSDrilling commenced on Ontevreden Kimberlite Pipe
15th Feb 20187:00 amRNSThorny River Project - Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.