Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBNK.L Regulatory News (BNK)

  • There is currently no data for BNK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bankers - Palo Duro Update

14 Mar 2006 07:00

Bankers Petroleum Limited13 March 2006 BANKERS PETROLEUM LTD. ANNOUNCES PALO DURO UPDATE March 13, 2006 BNK: TSX BNK: AIM March 13, 2006, Calgary, Alberta - Bankers Petroleum Ltd. (TSX: BNK, AIM: BNK)is pleased to provide an update on the activities of its wholly owned subsidiaryBankers Petroleum (US) Inc., in the Palo Duro Basin. As previously announced inits February 16th, 2006 press release, the Company's first well of a five wellappraisal program, the Misener No. 1, reached total depth of 10,142 feet and wascased for completion and further evaluation. The preliminary calculationsundertaken by Schlumberger Limited, based solely on the suite of logs run in thewell, indicate 144 billion cubic feet of gas-in-place per section (640 acres) inthe Lower Pennsylvanian, Bend Group Interval, which is approximately 970 feetthick. The Company is also evaluating other secondary targets encountered in thewell. The cores taken in the well are currently undergoing analysis by CoreLaboratories after which it is anticipated a fracture stimulation program willbe designed and implemented. Bankers has joined a multi-company, geo-engineering study of gas shales beingundertaken by the Integrated Reservoir Solutions Division of Core LaboratoriesN.V. This project consists of the characterization and evaluation of numerousconventional cores taken from multiple, gas shale formations. Specifically, thegas shale reservoirs will be analyzed for their geological, petrophysical,geomechanical, geochemical, and production properties and will be integratedwith well logs, stimulation designs and production test information. Theseintegrated data sets and case histories from Banker's own wells as well as thedata sets from other basins should aid in understanding the critical parametersto help optimize the exploitation of its reservoirs. Bankers has committed tosupplying cores from three wells to the study. Over 28 companies have alreadyjoined the project. The triple drilling rig that the Company has contracted for one year, aspreviously announced, is rigging up on the second appraisal well, Jones #1. Thiswell will also target the Lower Pennsylvanian group of sands and shales atdepths of approximately 9,300 to 10,300 feet, as well as secondary targetsincluding the San Andres, Clear Fork, Wolfcamp, Upper Pennsylvanian, Strawn andMorrow formations. This second well is located 8 miles southeast of the MisenerNo. 1 well and the third well is expected to be drilled 10 miles southwest ofthe Misener No. 1, providing Bankers the opportunity to gather technical databroadly across the Basin. The most promising areas of the basin will be selectedfor either follow-up vertical wells to gain further technical knowledge or forpossible horizontal wells. On Behalf of the Board of Directors, "Richard Wadsworth" Richard Wadsworth, President For further information, please contact 604-685-2162 The TSX Venture Exchange has not reviewed and does not accept responsibility forthe adequacy or accuracy of this news release. Certain information respecting the Company and the Company's propertiesconstitutes forward-looking information. Such forward-looking information,including but not limited to statements with respect to the estimated timing ofthe Company's planned work program involve known and unknown risks,uncertainties and other factors which may cause the actual costs and results ofthe Company and its operations to be materially different from estimated costsor results expressed or implied by such forward-looking statements. Such factorsinclude, among others, general risks associated with petroleum operations andrisks associated with equipment procurement and equipment failure. Although theCompany has attempted to take into account important factors that could causeactual costs or results to differ materially, there may be other factors thatcause costs and timing of the Company's program or results not to be asanticipated, estimated or intended. There can be no assurance that suchstatements will prove to be accurate as actual results and future events coulddiffer materially from those anticipated in such statements. Accordingly,readers should not place undue reliance on forward-looking information. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
6th Jan 20097:00 amPRNDirector Shareholding
23rd Dec 20087:00 amPRNDirector Shareholding
24th Nov 20087:00 amPRNDirector Shareholding
19th Nov 20087:00 amPRNBankers Petroleum Ltd. - Director Shareholding
13th Nov 20081:00 pmPRNBankers Petroleum Announces Third Quarter Results
9th Oct 20081:00 pmPRNProvides operational and corporate update
2nd Oct 20087:00 amPRNBankers Petroleum Ltd. - Block Admission Return
28th Aug 20082:30 pmPRNBankers Petroleum updates website
28th Aug 20087:00 amPRNDirector Shareholding
26th Aug 20087:00 amPRNBankers Petroleum Ltd. - Director Shareholding
13th Aug 20081:09 pmPRNHalf-yearly Report
30th Jul 20081:00 pmPRNBankers Notified of Changes to Albanian Fiscal Terms
29th Jul 20081:10 pmPRNConsolidates Shares & Warrants
15th Jul 20081:00 pmPRNBankers Petroleum Completes Company Split
14th Jul 20087:01 amPRNDirector Shareholding
9th Jul 20087:00 amPRNBankers Petroleum gains Court Approval for Company Split
9th Jul 20087:00 amPRNDirector/PDMR Shareholding
4th Jul 20087:00 amPRNDirector Dealings
3rd Jul 20081:00 pmPRNBankers Acquires Remaining Interest in Kucova
3rd Jul 20087:09 amPRNDirectors Dealing
30th Jun 20087:01 amPRNBNK reports outcome of AGM
27th Jun 20087:00 amPRNDirector Shareholding
26th Jun 20087:00 amPRNDirector Shareholding
24th Jun 20087:00 amPRNDirector/PDMR Shareholding
20th Jun 20087:00 amPRNDirector Shareholding
19th Jun 20087:00 amPRNDirector/PDMR Shareholding
13th Jun 20087:00 amPRNDirector Shareholding
9th Jun 20087:00 amPRNDirector/PDMR Shareholding
6th Jun 20087:00 amPRNDirector/PDMR Shareholding
2nd Jun 20081:00 pmPRNBankers Petroleum Files Circular For AGM
23rd May 20087:00 amPRNBankers Petroleum Ltd. - Director Shareholding
14th May 20089:05 amPRNBankers Petroleum To Split Albanian And U.S. Operations
12th May 20081:00 pmPRN1st Quarter Results
23rd Apr 20087:00 amPRNBankers Petroleum Announces Joint Broker For AIM
15th Apr 20087:00 amPRNDirector/Shareholding
14th Apr 20087:00 amPRNBankers Petroleum Ltd. - Director Shareholding
11th Apr 20087:00 amPRNDirector/PDMR Shareholding
4th Apr 20087:00 amPRNBankers Petroleum Ltd. - Director Shareholding
31st Mar 20087:03 amPRNFinal Results
25th Mar 200812:00 pmPRNAnnounces Three-Year Plan
20th Mar 200812:00 pmPRNReserves Report
5th Mar 20087:00 amPRNCloses Second Tranche of Private Placement
13th Feb 20081:00 pmPRNDrilling Report
11th Feb 20087:00 amPRNCloses transaction
11th Feb 20087:00 amPRNBankers Petroleum Ltd. - Block Admission Return
8th Feb 20087:00 amPRNShareholder Notification
6th Feb 20081:00 pmPRNCloses first tranche of private placement
4th Feb 20087:00 amPRNDirector/PDMR Shareholding
31st Jan 20081:00 pmPRNPrivate Placement
30th Jan 20081:00 pmPRNAcquisition(s)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.