Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBNK.L Regulatory News (BNK)

  • There is currently no data for BNK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bankers - Palo Duro Update

14 Mar 2006 07:00

Bankers Petroleum Limited13 March 2006 BANKERS PETROLEUM LTD. ANNOUNCES PALO DURO UPDATE March 13, 2006 BNK: TSX BNK: AIM March 13, 2006, Calgary, Alberta - Bankers Petroleum Ltd. (TSX: BNK, AIM: BNK)is pleased to provide an update on the activities of its wholly owned subsidiaryBankers Petroleum (US) Inc., in the Palo Duro Basin. As previously announced inits February 16th, 2006 press release, the Company's first well of a five wellappraisal program, the Misener No. 1, reached total depth of 10,142 feet and wascased for completion and further evaluation. The preliminary calculationsundertaken by Schlumberger Limited, based solely on the suite of logs run in thewell, indicate 144 billion cubic feet of gas-in-place per section (640 acres) inthe Lower Pennsylvanian, Bend Group Interval, which is approximately 970 feetthick. The Company is also evaluating other secondary targets encountered in thewell. The cores taken in the well are currently undergoing analysis by CoreLaboratories after which it is anticipated a fracture stimulation program willbe designed and implemented. Bankers has joined a multi-company, geo-engineering study of gas shales beingundertaken by the Integrated Reservoir Solutions Division of Core LaboratoriesN.V. This project consists of the characterization and evaluation of numerousconventional cores taken from multiple, gas shale formations. Specifically, thegas shale reservoirs will be analyzed for their geological, petrophysical,geomechanical, geochemical, and production properties and will be integratedwith well logs, stimulation designs and production test information. Theseintegrated data sets and case histories from Banker's own wells as well as thedata sets from other basins should aid in understanding the critical parametersto help optimize the exploitation of its reservoirs. Bankers has committed tosupplying cores from three wells to the study. Over 28 companies have alreadyjoined the project. The triple drilling rig that the Company has contracted for one year, aspreviously announced, is rigging up on the second appraisal well, Jones #1. Thiswell will also target the Lower Pennsylvanian group of sands and shales atdepths of approximately 9,300 to 10,300 feet, as well as secondary targetsincluding the San Andres, Clear Fork, Wolfcamp, Upper Pennsylvanian, Strawn andMorrow formations. This second well is located 8 miles southeast of the MisenerNo. 1 well and the third well is expected to be drilled 10 miles southwest ofthe Misener No. 1, providing Bankers the opportunity to gather technical databroadly across the Basin. The most promising areas of the basin will be selectedfor either follow-up vertical wells to gain further technical knowledge or forpossible horizontal wells. On Behalf of the Board of Directors, "Richard Wadsworth" Richard Wadsworth, President For further information, please contact 604-685-2162 The TSX Venture Exchange has not reviewed and does not accept responsibility forthe adequacy or accuracy of this news release. Certain information respecting the Company and the Company's propertiesconstitutes forward-looking information. Such forward-looking information,including but not limited to statements with respect to the estimated timing ofthe Company's planned work program involve known and unknown risks,uncertainties and other factors which may cause the actual costs and results ofthe Company and its operations to be materially different from estimated costsor results expressed or implied by such forward-looking statements. Such factorsinclude, among others, general risks associated with petroleum operations andrisks associated with equipment procurement and equipment failure. Although theCompany has attempted to take into account important factors that could causeactual costs or results to differ materially, there may be other factors thatcause costs and timing of the Company's program or results not to be asanticipated, estimated or intended. There can be no assurance that suchstatements will prove to be accurate as actual results and future events coulddiffer materially from those anticipated in such statements. Accordingly,readers should not place undue reliance on forward-looking information. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Mar 201212:00 pmPRNBankers Petroleum 2011 Results
14th Mar 20123:16 pmPRNHolding(s) in Company
5th Mar 20127:00 amPRNBankers Petroleum Ltd. Block Admission Return
24th Feb 20127:00 amPRNBankers Petroleum Ltd. Director Dealing
20th Feb 20127:00 amPRNUpdated Corporate Presentation
13th Feb 201212:30 pmPRNBankers Petroleum 2011 Reserves
20th Jan 20124:05 pmPRNDirector/PDMR Shareholding
16th Jan 20127:00 amPRNDirector and Executive Officer Shareholding
16th Jan 20127:00 amPRNBankers Petroleum announces management update
9th Jan 20121:00 pmPRNOperational Update Q4 2011
6th Jan 20125:18 pmPRNHolding(s) in Company
20th Dec 20111:00 pmPRN2012 Capital Budget and Work Program
14th Nov 20117:00 amPRN3rd Quarter Results
25th Oct 20117:00 amPRNHolding(s) in Company
4th Oct 20117:00 amPRNBankers Petroleum Operational Update For Q3 2011
14th Sep 20117:00 amPRNDirector/PDMR Shareholding
12th Sep 20117:00 amPRNBlock Admission Return
9th Sep 20117:00 amPRNDirector/PDMR Shareholding
12th Aug 20117:00 amPRNHalf-yearly Report
13th Jul 20117:00 amPRNDirector Shareholding
6th Jul 20117:00 amPRNBankers Petroleum Operational Update
1st Jun 20117:00 amPRNBankers Petroleum Ltd. - Director Shareholding
18th May 20117:00 amPRNDirector Shareholding
13th May 20111:00 pmPRN2011 First Quarter Financial and Operational Results
18th Apr 20111:00 pmPRNBankers Petroleum Ltd. Director Shareholders
11th Apr 20111:00 pmPRNBoard and Management Appointments
31st Mar 20111:00 pmPRNBankers Petroleum Announces Agreement with Albpetrol
22nd Mar 201112:00 pmPRNFinal Results
9th Mar 20111:00 pmPRNBankers Petroleum Announces 2010 Reserves Report
9th Mar 20117:00 amPRNBankers Petroleum Block Admission Report to February 28
25th Feb 20111:00 pmPRNBankers Petroleum Implements 2012 Oil Hedging Contracts
24th Jan 20117:00 amPRNDirector and Executive Officer Shareholding
20th Jan 20117:00 amPRNDirector Shareholding
19th Jan 20117:00 amPRNDirector Shareholding
17th Jan 20117:00 amPRNDirector Shareholding
11th Jan 201112:00 pmPRNRecord Production in the Fourth Quarter of 2010
21st Dec 20104:14 pmPRNDirector/PDMR Shareholding
16th Dec 20101:00 pmPRNBANKERS PETROLEUM ANNOUNCES 2011 CAPITAL BUDGET
7th Dec 20106:05 pmPRNTransaction in Own Shares
6th Dec 20105:55 pmPRNBankers Petroleum on Flooding in Albania
6th Dec 20107:00 amPRNDirector Shareholding
11th Nov 20101:00 pmPRNBankers Petroleum Third Quarter Financial Results
7th Oct 20101:00 pmPRNBANKERS PETROLEUM OPERATIONAL AND CORPORATE UPDATE
13th Sep 20101:00 pmPRNBankers Petroleum Corporate Presentation And Webcasts
13th Aug 201012:30 pmPRNHalf-yearly Report
15th Jul 20102:24 pmPRNIssue of Equity
23rd Jun 20102:07 pmPRNBankers Petroleum announces bought-deal financing
23rd Jun 20107:00 amPRNDirector/PDMR Shareholding
1st Jun 20107:00 amPRNBankers Petroleum Ltd. Director Shareholding
28th May 20107:00 amPRNDirector Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.