Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Mineral Resources Regulatory News (BMR)

  • There is currently no data for BMR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kabwe Dumps Acquisition Update

1 Oct 2009 07:00

RNS Number : 9940Z
Berkeley Mineral Resources PLC
01 October 2009
 



Berkeley Minerals Resources plc

("BMR" or the "Company")

Kabwe Dumps acquisition update

AIM-listed Berkeley Minerals Resources plc, the company developing mining projects in Zambia, announces that it is in the final stage of securing the rights to substantial additional surface dumps located at the Kabwe mine in Zambia. The dumps comprise large accumulations of metal-containing waste products derived from past mining and processing of the mine's zinc-lead ores. An aerial photograph showing the locations of the dumps appears on the Company's newly updated website at http://www.bmrplc.com.

The Company has already been granted the rights to Dump 57 by Zincorous Investment Ltd, a South African-owned, Zambia-based company. This contains an estimated 1.24m tons of Waeltz Kiln slag grading 5.49% combined Zn-Pb, equivalent to around 52,100t Zn and 16,100t Pb, worth approximately US$100m at current metal prices. 

The rights which BMR is in the final stages of finalising are to two other dumps (Dumps 21 & 22) which contain approximately 588,000t of Imperial Smelting Furnace (ISF) slag grading 9.65% zinc-lead, equivalent to around 46,040t of zinc and 10,701t lead and with a similar value to that of Dump 57, giving a total metal value in excess of $US200m.

According to the Company's latest projections, after refurbishment of the on-site gravitational and flotation plant, its Kabwe project should become cash-positive after six months, based on selling concentrates grading 55% combined zinc-lead. There is a ready market for this product in South Africa and in Asian markets. 

The Zambian government's Copperbelt Environment Project (CEP), supported by the World Bank and Nordic Development Fund, is in operation at Kabwe and is responsible for all past environmental problems arising from over 80 years of mining. In accordance with the CEP, after recovering the contained metals, BMR will be relocating the residues arising from its operations to another environmentally safe site. 

Masoud Alikhani, Chairman, Berkeley Mineral Resources plc, commented:

"The estimated value of metals in these dump materials indicates the potential of this project to become a meaningful cash generator and profit source for the Company. At the same time, we are helping to clean up the local environment and providing employment in an economically deprived region.

"We are presently involved in discussions to give us access to the nearby Kabwe base metals processing plant to treat the dumped material on a toll basis. This would enable BMR to produce a concentrate for its own account as opposed to the previous arrangement under which dumped material was shipped out of Zambia for processing by third parties. It would also allow us to offer toll treatment facilities to other parties which would further enhance the profitability of the project."

Notes to editors

BMR is a minerals company with a primary strategy of investing in tailings processing. By accessing dump deposits with known grades and metallurgy, it avoids exploration or mining costs, has a secure licence and fixed environmental criteria, and can produce concentrates according to viability at current market prices.

The Kabwe deposits, located approximately 110km north of the Zambian capital Lusaka, were discovered in 1902. The series of high-grade replacement ore bodies were characterised by coarse sulphide mineralisation (sphalerite/galena) surrounded by an oxidation halo comprising a variety of secondary zinc-lead minerals.

From 1906, Kabwe became one of the world's most important mines. By the time it closed in 1994 due to depletion of the massive sulphide mineralisation and lowered metal prices, it had produced about 1.8m tonnes of zinc, 800,000t of lead, 7,800t of vanadium pentoxide and lesser quantities of cadmium, silver and copper. After closure, most of the mine complex was sold off on a piecemeal basis. Berkeley's project is part of an overall plan to re-assemble the Kabwe site into a single entity operating under a single Large Scale Mining Licence.

Today, the waste dumps at Kabwe cover an area of about 1km2 and contain approximately 8m tonnes of various waste residues with an estimated combined metal content of 455,000t zinc and 368,500t lead.

BMR benefits from the existing infrastructure at Kabwe, including processing plant, good roads, water supply, ample power, local labour and direct on-site connection to overseas markets via international railways to South Africa and to Indian Ocean ports.

For further information please see the Company's website at http://www.bmrplc.com

The directors of Berkeley Mineral Resources accept responsibility for this announcement. 

1 October 2009

Contacts:

Masoud Alikhani, Chairman 020 7408 1181

Jonathan Wright, Seymour Pierce 020 7107 8050

Michael Padley / Ron Marshman, Lothbury Financial 020 7011 9411

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLMMATMMBJBBL
Date   Source Headline
26th Nov 20099:07 amRNSFinal Results
10th Nov 20097:00 amRNSPlacing
14th Oct 20097:00 amRNSDirector Shareholding
13th Oct 20097:00 amRNSFurther grant of mining rights
6th Oct 20099:00 amRNSDirector Shareholding
1st Oct 20097:00 amRNSKabwe Dumps Acquisition Update
31st Mar 20092:00 pmRNSInterim Results
30th Jan 200912:14 pmRNSAGM Statement
30th Dec 200812:00 pmRNSFinal Results
16th Dec 20087:00 amRNSPositive Assay Results
24th Jul 20081:36 pmRNSTotal Voting Rights
8th Jul 20087:00 amRNSZambian Mining & Processing R
27th Jun 20085:00 pmRNSStatement re: Share Price Mov
28th Mar 20087:01 amRNSInterim Results
6th Mar 200812:53 pmRNSChange of Name
13th Feb 20082:24 pmRNSGeneral Meeting
21st Dec 20073:22 pmRNSFinal Results
20th Nov 20072:04 pmRNSDirector/PDMR Shareholding
19th Nov 200710:22 amRNSHolding(s) in Company
9th Nov 20073:00 pmRNSHolding(s) in Company
9th Nov 20077:01 amRNSNew Activity / Funds raised
26th Oct 200710:35 amRNSHolding(s) in Company
5th Sep 20071:55 pmRNSHolding(s) in Company
20th Aug 20077:01 amRNSAIM Rule 26
30th Jul 200711:25 amRNSCompany Update
4th May 20071:57 pmRNSBoard Change
29th Mar 20071:14 pmRNSInterim Results
27th Mar 20071:50 pmRNSVoice Quality Software Stack
29th Dec 200611:25 amRNSPreliminary Results
22nd Dec 20069:59 amRNSTotal Voting Rights
24th Nov 20067:00 amRNSProduct Launch
23rd Nov 20067:00 amRNSConference Attendance
11th Sep 20067:01 amRNSVoice Quality Software
5th Jul 20068:00 amRNSICB Reclassification
31st Mar 20064:09 pmRNSInterim Results
6th Mar 200612:40 pmRNSSale of shareholding
21st Feb 20067:00 amRNSRe: Licensing Agreement
27th Jan 200611:12 amRNSAGM Statement
27th Jan 200611:09 amRNSRe: Placement of shares
23rd Dec 200512:03 pmRNSAnnual Report and Accounts
22nd Dec 200512:00 pmRNSFinal Results
29th Nov 20057:00 amRNSRe Joint Venture
3rd Oct 20057:00 amRNSContract Update
3rd Oct 20057:00 amRNSRe Contract
25th Jul 20054:02 pmRNSHolding(s) in Company
11th Jul 20057:00 amRNSIssue of Equity
27th Jun 20057:00 amRNSNew Contract Awarded
16th Jun 20057:00 amRNSC3 Product Delivery completed
10th Jun 200512:30 pmRNSGrant of Share Options
31st May 20059:00 amRNSTechnology Supply Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.