Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Mineral Resources Regulatory News (BMR)

  • There is currently no data for BMR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kabwe Dumps Acquisition Update

1 Oct 2009 07:00

RNS Number : 9940Z
Berkeley Mineral Resources PLC
01 October 2009
 



Berkeley Minerals Resources plc

("BMR" or the "Company")

Kabwe Dumps acquisition update

AIM-listed Berkeley Minerals Resources plc, the company developing mining projects in Zambia, announces that it is in the final stage of securing the rights to substantial additional surface dumps located at the Kabwe mine in Zambia. The dumps comprise large accumulations of metal-containing waste products derived from past mining and processing of the mine's zinc-lead ores. An aerial photograph showing the locations of the dumps appears on the Company's newly updated website at http://www.bmrplc.com.

The Company has already been granted the rights to Dump 57 by Zincorous Investment Ltd, a South African-owned, Zambia-based company. This contains an estimated 1.24m tons of Waeltz Kiln slag grading 5.49% combined Zn-Pb, equivalent to around 52,100t Zn and 16,100t Pb, worth approximately US$100m at current metal prices. 

The rights which BMR is in the final stages of finalising are to two other dumps (Dumps 21 & 22) which contain approximately 588,000t of Imperial Smelting Furnace (ISF) slag grading 9.65% zinc-lead, equivalent to around 46,040t of zinc and 10,701t lead and with a similar value to that of Dump 57, giving a total metal value in excess of $US200m.

According to the Company's latest projections, after refurbishment of the on-site gravitational and flotation plant, its Kabwe project should become cash-positive after six months, based on selling concentrates grading 55% combined zinc-lead. There is a ready market for this product in South Africa and in Asian markets. 

The Zambian government's Copperbelt Environment Project (CEP), supported by the World Bank and Nordic Development Fund, is in operation at Kabwe and is responsible for all past environmental problems arising from over 80 years of mining. In accordance with the CEP, after recovering the contained metals, BMR will be relocating the residues arising from its operations to another environmentally safe site. 

Masoud Alikhani, Chairman, Berkeley Mineral Resources plc, commented:

"The estimated value of metals in these dump materials indicates the potential of this project to become a meaningful cash generator and profit source for the Company. At the same time, we are helping to clean up the local environment and providing employment in an economically deprived region.

"We are presently involved in discussions to give us access to the nearby Kabwe base metals processing plant to treat the dumped material on a toll basis. This would enable BMR to produce a concentrate for its own account as opposed to the previous arrangement under which dumped material was shipped out of Zambia for processing by third parties. It would also allow us to offer toll treatment facilities to other parties which would further enhance the profitability of the project."

Notes to editors

BMR is a minerals company with a primary strategy of investing in tailings processing. By accessing dump deposits with known grades and metallurgy, it avoids exploration or mining costs, has a secure licence and fixed environmental criteria, and can produce concentrates according to viability at current market prices.

The Kabwe deposits, located approximately 110km north of the Zambian capital Lusaka, were discovered in 1902. The series of high-grade replacement ore bodies were characterised by coarse sulphide mineralisation (sphalerite/galena) surrounded by an oxidation halo comprising a variety of secondary zinc-lead minerals.

From 1906, Kabwe became one of the world's most important mines. By the time it closed in 1994 due to depletion of the massive sulphide mineralisation and lowered metal prices, it had produced about 1.8m tonnes of zinc, 800,000t of lead, 7,800t of vanadium pentoxide and lesser quantities of cadmium, silver and copper. After closure, most of the mine complex was sold off on a piecemeal basis. Berkeley's project is part of an overall plan to re-assemble the Kabwe site into a single entity operating under a single Large Scale Mining Licence.

Today, the waste dumps at Kabwe cover an area of about 1km2 and contain approximately 8m tonnes of various waste residues with an estimated combined metal content of 455,000t zinc and 368,500t lead.

BMR benefits from the existing infrastructure at Kabwe, including processing plant, good roads, water supply, ample power, local labour and direct on-site connection to overseas markets via international railways to South Africa and to Indian Ocean ports.

For further information please see the Company's website at http://www.bmrplc.com

The directors of Berkeley Mineral Resources accept responsibility for this announcement. 

1 October 2009

Contacts:

Masoud Alikhani, Chairman 020 7408 1181

Jonathan Wright, Seymour Pierce 020 7107 8050

Michael Padley / Ron Marshman, Lothbury Financial 020 7011 9411

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLMMATMMBJBBL
Date   Source Headline
20th Jan 20177:00 amRNSVanadium Update
10th Jan 20177:00 amRNSKashitu, Kabwe Prospect Geological Update
6th Jan 20177:00 amRNSWarrant exercise period
29th Dec 20167:00 amRNS2016 Final Results and AGM Notice
6th Dec 20167:00 amRNSKabwe Update and OPEX Costs
29th Nov 201612:40 pmRNSUpdate Re Metal Tiger
28th Nov 201612:00 pmRNSRe Metal Tiger plc
25th Nov 20164:20 pmRNSStatement re. Possible Offer & R 2.9 announcement
17th Nov 201611:00 amRNSExclusive Option Agreement
17th Nov 20169:00 amRNSKabwe Plant Construction Update
14th Nov 20167:11 amRNSOption to Acquire Interest in Ester Project
14th Nov 20167:00 amRNSOption to Acquire Interest in Ester Project
31st Oct 20163:53 pmRNSHolding(s) in Company
28th Oct 20167:00 amRNSPlacing to raise £620,000
3rd Oct 20167:00 amRNSISF Slag Laboratory Tests Completed
28th Sep 20167:00 amRNSWaelz Kiln Slag (WKS) Update
27th Sep 20168:36 amRNSHolding(s) in Company
26th Sep 20162:19 pmRNSHolding(s) in Company
23rd Sep 20167:00 amRNS$5.2m Project Construction&Trade Finance Facility
16th Aug 20167:00 amRNSExclusive Option Agreement
8th Aug 20167:00 amRNSOff-take Agreement and General Update
1st Aug 20167:00 amRNSOfftake Agreement
30th Jun 20167:00 amRNSKabwe Project Update and Activities
1st Jun 20167:00 amRNSPilot Plant Update with Letter of Intent
31st May 20167:00 amRNSExpected costings: Kabwe Pilot Plant construction
17th May 20167:00 amRNSSubmission of Environmental Project Brief to ZEMA
6th May 20167:00 amRNSConfirmation of ZEMA approval
22nd Apr 20167:00 amRNSPlacing and appointment of Joint Broker
24th Mar 20167:00 amRNSInterim Results
24th Feb 20167:00 amRNSConfirmation of ZEMA public hearing
23rd Feb 20164:40 pmRNSHolding(s) in Company
18th Feb 20167:00 amRNSResult of Open Offer
10th Feb 201612:00 pmRNSResult of AGM
28th Jan 20168:04 amRNSZEMA Report Available on Website
15th Jan 20169:11 amRNSOpen Offer -Change to Ex-entitlement and Timetable
15th Jan 20167:00 amRNSOpen Offer
18th Dec 20157:00 amRNSSubmission of Final Report to ZEMA
17th Dec 20157:00 amRNS2015 Final Results and AGM Notice
27th Nov 20158:42 amRNSHolding(s) in Company
9th Nov 20157:00 amRNSSurrender of lease and change of registered office
28th Oct 20156:00 pmRNSPlacing to raise GBP 750,000
16th Oct 20152:20 pmRNSLand & Equipment Lease Update
12th Oct 20157:00 amRNSZEMA Update
5th Oct 20157:00 amRNSPotential market for Waelz Kiln Slag
28th Sep 20157:00 amRNSLand and equipment lease agreement
22nd Sep 20157:00 amRNSBMR's Kabwe treatment project
19th Aug 20157:00 amRNSZEMA Update
31st Jul 20157:00 amRNSSignificant Testing Progress Update
25th Jun 20157:00 amRNSResults of the Metallurgical Test Programme
15th Jun 20157:00 amRNSGrant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.