Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBushveld Minerals Regulatory News (BMN)

Share Price Information for Bushveld Minerals (BMN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.65
Bid: 0.60
Ask: 0.70
Change: 0.025 (4.00%)
Spread: 0.10 (16.667%)
Open: 0.625
High: 0.68
Low: 0.65
Prev. Close: 0.625
BMN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MoU signed by Lemur & Sinohydro on Imaloto IPP

5 Apr 2017 07:00

RNS Number : 5952B
Bushveld Minerals Limited
05 April 2017
 

5 April 2017

Bushveld Minerals Ltd

("Bushveld" or the "Company")

MoU signed between Lemur and Sinohydro on Imaloto IPP

Bushveld Minerals Limited (AIM: BMN), a diversified mineral development company with projects in Southern Africa and Madagascar, is pleased to announce the signing of a Memorandum of Understanding ("MoU") between its wholly-owned subsidiary, Lemur Holdings Limited ("Lemur") and Sinohydro Corporation Limited ("Sinohydro"). The MoU gives both companies exclusive rights to work with each other on the development of an initial 60 MW independent power producer ("IPP") coal power plant and associated 200 kilometre transmission line in southern Madagascar (the "Project"). It is anticipated that the coal fuel for the power station will be provided from Lemur's coal mining permit area in Madagascar.

The MoU's objectives include:

· Development of a Bankable Feasibility Study ("BFS") and a Project Implementation Proposal ("PIP") for the project by Sinohydro, at its own cost, within 12 months of signing the MoU;

· Preparation by both parties of an Environmental Impact Assessment for the Project;

· Preparation by both parties of EPC and O&M contracts for the IPP plant and the EPC contract for the transmission line within 18 months;

· Cooperation between the two parties to secure both debt and equity funding for the project;

· Potential establishment of a future company for the Project upon completion of the BFS, in which Sinohydro's parent company, PowerChina, may take an equity interest;

· Lemur will continue the development of its mine in order to supply coal to the Imaloto IPP.

Lemur has to date completed a conceptual study, followed by more detailed pre-feasibility studies ("PFS") for the mine, power plant and transmission line. These studies demonstrated favourable project economics, including the existing and future demand for electricity in the area. Sinohydro will use its vast expertise in power plant and transmission line engineering and construction to build on the work already done by Lemur in the PFS.

The Project stands to have a transformational impact on Madagascar. At present, no electricity grid exists in the southern part of the island. The Project would be able to not only supply electricity cheaper to existing mining and industrial operations in the region, but to also deliver electricity to tens of thousands of people currently without access to power. Realising this, the Madagascar power utility, Jirama, is currently negotiating an offtake agreement with Lemur for electricity for the IPP.

 

Commenting on the executed Agreement, Fortune Mojapelo, CEO of Bushveld Minerals, said: "This is another example of the progress Bushveld has made across its platforms in 2017, in what we forecasted as a pivotal year for our Company."

 

"The MoU signing is a major step forward in the development of our coal mine and power plant project in Madagascar. Sinohydro and its parent company PowerChina, bring a wealth of technical expertise in building such projects and bringing them into operation. The MoU reinforces the commercial merits of the Project and the bankable feasibility study will add significant value to the development of the power Project. We look forward to working with Sinohydro and the Madagascar authorities in implementing the Project and realising its immense positive social impact it will create.

 

 

Commenting on the MoU, Liu Kai, Vice President of Sinohydro, said: "As a major breakthrough for the energy sector of Madagascar, this project will help solve the problem of power shortage and contribute to local economic growth in the south of the country. Sinohydro, with rich experience in thermal power field, is ready to help Lemur complete preliminary work. We both hope the Project can move forward into the next stage as soon as possible with the strong support of Madagascar government."

 

Enquiries: info@bushveldminerals.com

Bushveld Minerals

Fortune Mojapelo +27 (0) 11 268 6555

Beaufort Securities

Jon Bellis +44 (0) 20 7382 8300

Strand Hanson (Nominated Adviser)

Andrew Emmott / Ritchie Balmer +44 (0) 20 7409 3494

Blytheweigh

Tim Blythe / Camila Horsfall +44 (0) 20 7138 3204

Gabriella von llle +27 (0) 711 121 907

 

Notes to editors

About Lemur Holdings and Imaloto Power Project Limited

Lemur Holdings Limited, 100% owned by AIM-listed Bushveld Minerals Limited, through its dedicated power project company, is developing a 60 MW coal power plant as an independent power producer and a 200 km transmission line to connect the power plant with electricity consumers in the region. Lemur also holds a mining license and is developing a JORC compliant 136 million ton coal resource, of which 68% is measured. The mine will supply coal to the Imaloto IPP plant and potentially beneficiate additional volumes into export quality coal.

About SinoHydro

Sinohydro Corporation Limited is a subsidiary of PowerChina one of the largest power engineering construction companies in the world. Sinohydro focuses on engineering, procurement and construction of transmission infrastructure and power plants, including thermal, hydro and renewable energy technologies.Currently, it has 524 international projects in more than 116 countries, with total contract value of nearly USD 42.50 billion.

About Bushveld Minerals Limited

Bushveld Minerals is a diversified AIM listed mineral development company with a portfolio of vanadium, iron ore, tin and coal greenfield assets in Southern Africa and Madagascar. The Company's flagship platform, the vanadium platform, includes the Mokopane Vanadium Project, the Brits Vanadium Project, and the Bushveld Iron Ore & Titanium Project. The tin platform comprises the Mokopane Tin Project (South Africa), the Marble Hall Tin Project (South Africa) and the Uis Tin Project (Namibia) whereas the Imaloto Coal Project, which is being developed as one of Madagascar's leading independent power producers, makes up the Company's coal platform.

 

The Company's vision is to become the largest low cost integrated primary vanadium producer through owned low-cost high-grade assets. This incorporates development and promotion of the role of vanadium in the growing global energy storage market through Bushveld Energy, the Company's energy storage solutions provider. Whilst the demand for vanadium remains largely anchored in a slow growing steel industry, Bushveld Minerals believes there is a strong potential for imminent significant global vanadium demand surge from the fast-growing energy storage market, particularly through the use and adoption of Vanadium Redox Flow Batteries.

 

Bushveld Minerals' approach to project development recognises that whilst attractive project economics are imperative, they are insufficient to secure capital to bring them to account. A clear path to production with a visible timeframe, low capex requirements and scalability are important factors in retaining an attractive exit option. This philosophy is core to the Company's strategy in developing projects. Detailed information on the Company and progress to date can be accessed on the website: www.bushveldminerals.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
AGRBIGDSSUGBGRS
Date   Source Headline
23rd Apr 20247:01 amRNSQ1 2024 Operational & Corporate Update
23rd Apr 20247:00 amRNSMineral Resources and Reserves Annual Update
14th Mar 20249:32 amRNSFurther Update on Outstanding Funds
14th Mar 20247:00 amRNSTR-1 Notification of Major Holdings
7th Mar 20243:00 pmRNSTR-1 Notification of Major Holdings
29th Feb 20245:30 pmRNSFurther Update on Outstanding Funds
16th Feb 20247:08 amRNSFurther update on Outstanding Funds
5th Feb 20247:08 amRNSFull year 2023 Operational Update
2nd Feb 20242:30 pmRNSForm 8.3 of the Takeover Code
1st Feb 20247:00 amRNSCompletion of Convertible Loan Note Refinancing
29th Jan 20244:25 pmRNSResignation of Finance Director
19th Jan 20244:32 pmRNSFurther Update on Outstanding Funds
15th Jan 20245:25 pmRNSTR-1 Notification of Major Holdings
15th Jan 20245:23 pmRNSTR-1 Notification of Major Holdings
15th Jan 202411:12 amRNSFurther update on Outstanding Funds
10th Jan 202412:55 pmRNSUpdate on Outstanding Funds
3rd Jan 20242:30 pmRNSUpdate following Equity Issue
27th Dec 20232:30 pmRNSResult of General Meeting
21st Dec 20237:00 amRNSReminder to vote at the General Meeting
19th Dec 202311:24 amRNSConfirmed Acquisition of Interests in Vametco
19th Dec 20237:32 amRNSConfirmed Acquisition of Interests in Vametco
15th Dec 20237:52 amRNSDefinitive sales and marketing agreement with SPR
15th Dec 20237:51 amRNSDefinitive agreement for 64% Mokopane Sale
14th Dec 202311:07 amRNSOption Agreement with Portillion
13th Dec 20237:00 amRNSCorporate Update
12th Dec 20237:00 amRNSResults of PrimaryBid Offer
6th Dec 202312:00 pmRNSInvestor Presentation
5th Dec 20231:00 pmRNSPrimaryBid Offer
5th Dec 202312:51 pmRNSResult of Bookbuild
29th Nov 20233:35 pmRNSProposed Fundraising
27th Nov 20237:00 amRNSAgreement on Convertible Loan Note Refinancing
20th Nov 202310:20 amRNSBushveld Energy Update
20th Nov 20237:15 amRNSAgreement for acquisition of interest in Vanchem
16th Nov 20235:32 pmRNSResignation of Finance Director
6th Nov 20237:00 amRNSQ3 2023 and 9M 2023 Operational Update
30th Oct 20237:00 amRNSConditional acquisition of interests in Vametco
18th Oct 20237:00 amRNSHolding(s) in Company
10th Oct 20237:00 amRNSResponse to Market Speculation
26th Sep 20237:00 amRNSInterim Results for Six Months ended 30 June 2023
20th Sep 20234:45 pmRNSHolding(s) in Company
11th Sep 20237:00 amRNSInvestment by Southern Point Resources
1st Sep 20233:58 pmRNSTR-1: Standard Notification of Major Holdings
21st Aug 20236:00 pmRNSTR-1: Standard Notification of Major Holdings
9th Aug 20231:00 pmRNSMustang Energy Update: Conversion Notice
3rd Aug 20234:39 pmRNSHolding(s) in Company
2nd Aug 20232:29 pmRNSResult of AGM
2nd Aug 20237:00 amRNSQ2 and H1 2023 Operational Update
28th Jul 20237:00 amRNSEnerox Update
14th Jul 20233:58 pmRNSConvertible Loan Note Update
6th Jul 20239:00 amRNSREPLACEMENT: Posting of Accounts and Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.