focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.25
Bid: 19.00
Ask: 19.50
Change: -0.25 (-1.28%)
Spread: 0.50 (2.632%)
Open: 18.75
High: 19.25
Low: 18.75
Prev. Close: 19.50
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

7 Aug 2013 07:11

RNS Number : 1333L
Berkeley Resources Limited
07 August 2013
 



 

 

 

BERKELEY RESOURCES LIMITED

AIM RELEASE | 7 AUGUST 2013  | ASX/AIM:BKY

HIGH GRADE MINERALISATION INTERSECTED IN DRILLING AT RETORTILLO SATELLITE DEPOSIT

Highlights:

·; High grade mineralisation intersected at shallow depths (from 9 metres to a maximum of 84 metres), with thicknesses up to 29 metres at Zona 7, the largest of the Retortillo Satellite Deposits;

·; Drilling extends mineralisation a further 1,200 metres to the southwest of the current resource area;

·; Better intercepts include 29 metres @ 3,391 ppm U3O8, 17 metres @ 1,260 ppm U3O8, 15 metres @ 1,392 ppm U3O8, 25 metres @ 683 ppm U3O8 and 13 metres @ 1,161 ppm U3O8; and

·; Shallow, high grade mineralisation extending well beyond the current resource boundary at Zona 7 is a clear demonstration of the exploration and resource growth potential of the Salamanca Project.

Berkeley Resources Limited ('Berkeley' or 'the Company') is pleased to announce the results of a drilling program at Zona 7, the largest of the Retortillo Satellite Deposits and part of the Company's Salamanca Project in Spain.

Zona 7, which is located within 10 kilometres of the proposed location of the centralised processing plant at Retortillo, currently hosts an Inferred Mineral Resource Estimate ('MRE') of 3.9 million tonnes averaging 414 ppm U3O8 for a contained 3.6 million pounds of U3O8 (at a 200 ppm U3O8 cut-off grade). A recent comprehensive review of all available data for the tenements surrounding the Company's existing resources identified the potential extension of Zona 7 to the southwest as a priority drill target.

 

Assay results returned from 18 reverse circulation ('RC') drill holes, totalling approximately 1,130 metres, have confirmed that the Zona 7 mineralisation extends a further 1,200 metres to the southwest of the current resource area. The drilling has essentially doubled the strike extent of the mineralised zone and it remains open. Significant high grade intersections have been recorded at shallow depths (from 9 metres to a maximum depth of 84 metres), with thicknesses up to 29 metres. Select intercepts include:

 

Hole No.

Down Hole Intercept

From Depth

(Down Hole)

Z7R-084

29m @ 3,391 ppm U3O8

9m

Z7R-088

17m @ 1,260 ppm U3O8

37m

Z7R-089

 

 

4m @ 2,365 ppm U3O8

15m @ 1,392 ppm U3O8

2m @ 2,759 ppm U3O8

39m

63m

82m

Z7R-087

25m @ 683 ppm U3O8

27m

Z7R-090

13m @ 1,161 ppm U3O8

17m

Z7R-085

16m @ 764 ppm U3O8

33m

 

The Directors consider that the delineation of this zone of shallow, high grade mineralisation extending well beyond the current resource boundary at Zona 7 is a clear demonstration of the exploration and resource growth potential of the Salamanca Project.

 

The data from the drilling program will now form the basis for an updated MRE for Zona 7 which is anticipated to be completed in the current quarter.

 

The Company continues to advance the Pre-Feasibility Study ('PFS') for the Salamanca Project. The PFS, which is focussed on the development of only the Retortillo and Alameda deposits, is scheduled for completion in the current quarter. Given the additional existing resources and significant exploration upside associated with Satellite Deposits such as Zona 7, the PFS is considered a base case scenario.

 

 

Enquiries: Robert Behets

Berkeley Resources

+61 8 9322 6322

 

Martin Eales

RBC Capital Markets

+44 20 7029 7881

 

Introduction

Berkeley's flagship Salamanca Project comprises the Retortillo, Alameda and Gambuta depositsplus a number of other Satellite Deposits located in western Spain.

 

The Company completed an initial assessment of the integrated development of Retortillo and Alameda in late 2012. The results of this Scoping Study demonstrated the potential of the Salamanca Project to support a significant scale, long life uranium mining operation (refer ASX Announcement dated 29 November 2012).

 

Following completion of the Scoping Study, Berkeley commenced a Pre-Feasibility Study ('PFS') for the Salamanca Project focussed on the development of Retortillo and Alameda, which is anticipated to be completed in the current quarter.

 

The Company has also advanced the evaluation of the Gambuta deposit to the Scoping Study stage. Gambuta will ultimately be integrated with Retortillo and Alameda, with a view to potentially increasing the production scale or mine life of the Salamanca Project.

 

In addition, a comprehensive review of all available data for the regional tenements surrounding the existing resources has been completed, in order to rank and prioritise the identified anomalies/targets, generate new exploration targets and design an exploration work program.

 

The exploration and resource growth potential in the Retortillo, Alameda and Gambuta regions is considered significant with numerous untested or poorly tested radiometric anomalies, exploration targets under shallow Tertiary cover, and possible extensions to known resources.

 

Drilling Program

The comprehensive review of all available data for the regional tenements surrounding the existing resources identified the potential extension of Zona 7, the largest Retortillo Satellite Deposit, to the southwest towards Las Carbas as a priority drill target.

 

Zona 7 is located approximately 10 kilometres to the northwest of the proposed location of the centralised processing plant at Retortillo and currently hosts an Inferred Mineral Resource Estimate ('MRE') of 3.9 million tonnes averaging 414 ppm U3O8 for a contained 3.6 million pounds of U3O8 at a lower cut-off grade of 200 ppm U3O8 (refer ASX June 2012 Quarterly Report).

 

An 18 hole, 1,133 metre reverse circulation ('RC') drill program has been carried out on an approximately 400 metre by 100 metre grid to test this priority target.

 

 

Drilling Results

Assay results returned from the 18 RC holes have highlighted that the Zona 7 mineralisation extends a further 1,200 metres to the southwest of the current resource area along the granite-sediment contact. The drilling has essentially doubled the strike extent of the mineralised zone and it remains open to the southwest.

 

Significant high grade intersections have been recorded at shallow depths (from 9 metres to a maximum depth of 84 metres), with thicknesses up to 29 metres. Select intercepts include:

 

Hole No.

Down Hole Intercept

From Depth

(Down Hole)

Z7R-084

29m @ 3,391 ppm U3O8

9m

Z7R-088

17m @ 1,260 ppm U3O8

37m

Z7R-089

 

 

4m @ 2,365 ppm U3O8

15m @ 1,392 ppm U3O8

2 @ 2,759 ppm U3O8

39m

63m

82m

Z7R-087

25m @ 683 ppm U3O8

27m

Z7R-090

13m @ 1,161 ppm U3O8

17m

Z7R-085

16m @ 764 ppm U3O8

33m

 

All significant intersections returned from the RC drill holes, along with the details of the collar positions, dips, azimuths and depths, are summarised in Appendix A.

 

Zona 7 is a vein type deposit hosted in a sequence of fine grained metasediments which are overlain by a conglomerate unit and adjacent to a granite intrusive. The mineralised envelope is generally sub-horizontal and the mineralisation is contained within a stockwork of veins. The uranium mineralisation occurs both within the partially weathered zone and fresh rock.

 

Whilst the original drilling within the current resource area recorded a number of thick, high grade intersections including 26 metres at 1,356 ppm U3O8 and 12 metres at 2,078 ppm U3O8, the recent drilling has highlighted a thicker and potentially more continuous zone of high grade mineralisation to the southwest, albeit based on a broad spaced drill pattern.

The data from the drilling program will form the basis for an updated MRE for Zona 7 which is anticipated to be completed in the current quarter.

 

The current PFS for the Salamanca Project is focussed on the development of only Retortillo and Alameda. Given the additional Mineral Resources and significant exploration upside associated with Satellite Deposits such as Zona 7, which is in close proximity to Retortillo, and Gambuta, the Study is considered as a base case scenario. 

 

 

Competent Persons Statement

The information in this announcement that relates to Exploration Results and Mineral Resources is based on information compiled by Craig Gwatkin, who is a Member of The Australian Institute of Mining and Metallurgy and is an employee of Berkeley Resources Limited. Mr Gwatkin has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Gwatkin consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Forward Looking Statement

Statements regarding plans with respect to the Company's mineral properties are forward-looking statements. There can be no assurance that the Company's plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that the Company will be able to confirm the presence of additional mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company's mineral properties.

 

Appendix A: Summary of Significant RC Drill Intersections - Zona 7

Drill Hole ID

Easting

(m)

Northing

(m)

Elevation

(m)

Azimuth

(o)

Dip

(o)

Depth

(m)

From

(m)

To

(m)

Interval

(m)

U3O8 ppm

Z7R-076

714469

4528008

761.2

360

-90

61

29

31

2

913

Z7R-077

714376

4528058

757.7

360

-90

60

26

27

1

1,662

Z7R-078

714424

4528030

759.5

360

-90

60

No Significant Intersection

Z7R-079

714502

4527976

764.1

360

-90

60

No Significant Intersection

Z7R-080

714311

4528091

755.5

360

-90

67

35

42

7

319

52

54

2

252

Z7R-081

714338

4528075

756.3

360

-90

60

11

14

3

261

17

18

1

551

23

25

2

480

33

36

3

479

40

42

2

274

Z7R-082

714191

4527708

756.4

360

-90

70

17

18

1

283

22

44

22

259

47

50

3

316

59

61

2

230

Z7R-083

714266

4527652

759.0

360

-90

60

21

28

7

416

54

55

1

232

57

58

1

233

Z7R-084

714069

4527779

750.3

360

-90

64

9

38

29

3,391

Z7R-085

714097

4527743

752.4

360

-90

60

10

11

1

228

33

49

16

764

Z7R-086

713765

4527482

756.9

360

-90

58

28

29

1

260

Z7R-087

713869

4527414

757.7

360

-90

60

27

52

25

683

Z7R-088

714007

4527345

757.4

360

-90

64

12

13

1

279

18

25

7

560

29

32

3

688

37

54

17

1260

Z7R-089

714066

4527316

763.5

360

-90

94

39

43

4

2,365

55

58

3

583

63

78

15

1,392

82

84

2

2,759

Z7R-090

714000

4527127

762.0

360

-90

56

17

30

13

1,161

Z7R-091

714139

4527279

773.6

360

-90

60

No Significant Intersection

Z7R-092

713652

4527314

764.5

360

-90

55

No Significant Intersection

Z7R-093

713805

4527265

761.8

360

-90

60

31

35

4

599

38

42

4

836

Notes:

·; Co-ordinates are in UTM Grid (ED1950 Zone 29N) and have been measured by a DGPS (+/- 1m accuracy)

·; RC drill samples are collected over one metre (1m) intervals using representative sampling techniques

·; Drill intersections are calculated using a 200 ppm U3O8 cut-off, no upper cut and may include up to 2 metres of internal waste

·; Sample preparation was completed by ALS Chemex laboratory in Sevilla, Spain, with the sample analysis of U by XRF press powder completed by ALS Chemex in Vancouver, Canada

·; Quality control standards, blacks and duplicates are routinely included with all drill samples prior to submission to the laboratory where further laboratory control standards are added

·; The mineralisation is hosted by metasediment, and is interpreted to be flat lying; thus the reported intervals approximate true widths

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLSMWFDSESA
Date   Source Headline
30th Apr 20147:01 amRNSAppendix 5b
30th Apr 20147:00 amRNSMarch 2014 Quarterly Report
24th Apr 20147:00 amRNSMining licence granted for Retortillo
28th Mar 20148:31 amRNSPerformance Share Rights
13th Mar 20147:00 amRNSHalf Yearly Report
31st Jan 20148:09 amRNSAppendix 5b
31st Jan 20148:09 amRNSDecember Quarterly Report
3rd Jan 20143:48 pmRNSDisclosure of Directors' Appointments
3rd Jan 20143:41 pmRNSChange of Adviser
31st Dec 20137:00 amRNSIssue of Securities
20th Nov 20139:57 amRNSResult of AGM
31st Oct 20137:08 amRNSAppendix 5B
31st Oct 20137:08 amRNS1st Quarter Results
18th Oct 20139:35 amRNSNotice of AGM
8th Oct 201310:34 amRNSEnvironmental Licence
26th Sep 20137:33 amRNSPre-Feasibility Study
20th Sep 201310:01 amRNSAnnual Financial Report
7th Aug 20137:11 amRNSDrilling Report
30th Jul 20137:10 amRNSAppendix 5B
30th Jul 20137:10 amRNSQuarterly Report
20th May 20137:25 amRNSCompany Presentation
17th May 20138:25 amRNSBlocklisting Interim Review
17th May 20138:25 amRNSDirector/PDMR Shareholding
17th May 20138:22 amRNSIssue of Equity
3rd May 20137:42 amRNSAppendix 3Y 2 of 2
3rd May 20137:42 amRNSAppendix 3Y 1 of 2
3rd May 20137:40 amRNSAppendix 3B
29th Apr 20137:22 amRNS3rd Quarter Results
29th Apr 20137:22 amRNSAppendix 5B
16th Apr 20137:43 amRNSExpiry of Listed Options
12th Apr 20139:24 amRNSResult of Meeting
14th Mar 20137:39 amRNSHalf Yearly Report
12th Mar 20137:45 amRNSNotice of General Meeting
8th Feb 20138:41 amRNSHolding(s) in Company
31st Jan 20138:46 amRNSAppendix 5B - Mining exploration entity quarterly
31st Jan 20138:44 amRNSDecember 2012 Quarterly Report
29th Nov 20128:59 amRNSAppendix 3Z
29th Nov 20128:57 amRNSResult of AGM
29th Nov 20127:39 amRNSScoping Study
9th Nov 20127:30 amRNSAppendix 3B
7th Nov 20128:50 amRNSHolding(s) in Company
31st Oct 20128:04 amRNS1st Quarter Results
31st Oct 20127:50 amRNSAppendix 5B
26th Oct 20127:16 amRNSNotice of AGM
27th Sep 20128:45 amRNSFinal Results
14th Aug 20127:26 amRNSBlocklisting Interim Review
10th Aug 20127:24 amRNSAppendix 3B
8th Aug 20129:33 amRNSHolding(s) in Company
2nd Aug 20128:25 amRNSAppendix 3Z
2nd Aug 20128:24 amRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.